Projects
To search for a project, enter filter criteria in the appropriate input field below. If a project is not listed, please contact a METS Representative for assistance.Displaying 12391-12400 of 19348 results.
| Project ID | Project Identifiers | DIST-CO-RTE-PM | Work Description | Location Description | Caltrans Closeout Date | METS Service Level | Actions |
|---|---|---|---|---|---|---|---|
| 7089 | Project ID: 7089 EFIS: 0000001155 Permit Numbers: 0812NDP0022 | 08-RIV-15-30.21/30.6 | Enter onto Interstate 15 right-of-way at Indian Truck Trial Interchange to widen the four freeway ramps that include grading and drainage and signalization, to widen Indian Truck Trail to construct tieback walls and retaining walls, and to improve signalization | Interstate 15, N/A | 04/19/2013 | 1 (04/19/2013) | Details CEM-3701 Report |
| 7088 | Project ID: 7088 DEA: 06423704 EFIS: 0600000417 COOP: 061418 | 06-TUL-198-R4.1/R5.0 | Construct Auxiliary Lanes (Rte 198) and Widen Roadway @ Plaza Dr | On Route 198 from Rte 99 to Plaza Drive, and on Plaza Drive from Airport Drive to Goshen Ave. | 08/12/2021 | 1 (10/19/2012) | Details CEM-3701 Report |
| 7087 | Project ID: 7087 EFIS: 0000001155 Permit Numbers: 0408NMC0348 | 04-ALA-580-16.7/16.7 | Roadway widening along the south side of the 580/Fallon Rd/El Charro Rd. | El Charro Road, Livermore | 08/31/2018 | NOT VERIFIED | Details CEM-3701 Report |
| 7086 | Project ID: 7086 EFIS: 0000001155 Permit Numbers: 0711NMC1399 | 07-LA-14-68.1/69.3 | Improvement of Avenue I interchange with Freeway 14, reconstruction/reconfiguration of S/B off-ramp, widening of 3 ramps, storm drain system | Avenue I, Lancaster | 07/31/2018 | NOT VERIFIED | Details CEM-3701 Report |
| 7084 | Project ID: 7084 DEA: 11936604 EFIS: 1100001071 | 11-SD-- | Install Two Uninteruptable Power Systems | In SD County at Transportation Management System In Kearny Mesa | 1 (01/30/2012) | Details CEM-3701 Report | |
| 7083 | Project ID: 7083 EFIS: 0000001155 Permit Numbers: 0512NDP0026 | 05-SLO-101-29.76/29.79 | Construct new signal at Grand Avenue and northbound exit ramp | Grand Avenue, San Luis Obispo | 09/18/2018 | NOT VERIFIED | Details CEM-3701 Report |
| 7082 | Project ID: 7082 DEA: 07120384 EFIS: 0700000109 | 07-VEN-101-7.7/8.2 | US-101/Wendy Dr. Interchange Improvements | City of Thousand Oaks | 08/25/2021 | 1 (12/11/2012) | Details CEM-3701 Report |
| 7081 | Project ID: 7081 DEA: 100V8804 EFIS: 1000020467 | 10-STA-33-1.6/12.6 | REPAIR FAILED AREAS AND APPLY RUBBERIZED HMA (GAP GRADED). | STANISLAUS COUNTY AT AND NEAR CROWS LANDING FROM 0.1 MILE SOUTH OF JENSEN ROAD TO SPERRY AVENUE | 01/04/2013 | 1 (06/28/2012) | Details CEM-3701 Report |
| 7080 | Project ID: 7080 DEA: 100U6804 EFIS: 1000020001 | 10-AMA-88-22.1 | CONSTRUCT RETAINING WALL AND INSTALL METAL BEAM GUARD RAILING. | AMADOR COUNTY NEAR PINE GROVE AT 0.1 MILE WEST OF CLIMAX ROAD | 08/30/2013 | 1 (07/18/2012) | Details CEM-3701 Report |
| 7079 | Project ID: 7079 DEA: 080P7904 EFIS: 0800020031 | 08-RIV-95-L0.0/36.2 | DIGOUTS, COLD PLANE, OVERLAY AND SLURRY SEAL | RIVERSIDE COUNTY NEAR BLYTHE FROM 0.2 MILE SOUTH OF ROUTE 10/95 SEPARATION TO 0.7 MILE SOUTH OF LYE ROAD | 12/02/2013 | 1 (03/12/2012) | Details CEM-3701 Report |
