Projects

To search for a project, enter filter criteria in the appropriate input field below. If a project is not listed, please contact a METS Representative for assistance.
Displaying 12371-12380 of 18861 results.
Project IDProject IdentifiersDIST-CO-RTE-PMWork DescriptionLocation DescriptionCaltrans Closeout DateMETS Service LevelActions
     
5349Project ID: 5349
DEA: 09258004
09-INY-395-117.9/122.4RECYCLE, WIDEN SHLDRS., AC OVERLAY ED POWERS REHAB. 01/01/20141 (07/11/2007)Details CEM-3701 Report
6170Project ID: 6170
DEA: 11282804
11-SD-76-1.5RECYCLED WATER CONVERSIONIN SAN DIEGO COUNTY IN OCEANSIDEFROM 0.4 KM WEST OF BENET ROAD TO 0.1 KM EAST OF OLD GROVE ROAD08/02/20101 (08/02/2010)Details CEM-3701 Report
6171Project ID: 6171
DEA: 11282904
11-SD-905-6.4/8.0RECYCLED WATER CONVERSION 08/02/2010NOT VERIFIEDDetails CEM-3701 Report
6375Project ID: 6375
DEA: 11402304
EFIS: 1100000536
11-SD-56-6.8/8.7RECYCLED WATER CONVERSION.SAN DIEGO COUNTY IN SAN DIEGO FROM PENASQUITOS CREEK BRIDGE TO 0.3 MILE WEST OF ROUTE 56/15 SEPARATION04/23/20141 (06/01/2010)Details CEM-3701 Report
993381Project ID: 993381
DEA: 022J6604
EFIS: 0221000122
02-TEH-36-42.044Red Bluff Salmonid OS-LCO 08/14/20231 (11/01/2021)Details CEM-3701 Report
891Project ID: 891
EFIS: 0000001155
Permit Numbers: 0310NSN0408
03-YUB-70-1.236/1.236Red light camera installation at intersection of 9th and E Street. Will involve some trenching/boring and loop installation.9th and E Streets, Marysville09/17/2014NOT VERIFIEDDetails CEM-3701 Report
896Project ID: 896
EFIS: 0000001155
Permit Numbers: 0311NRW0495
03-YUB-70-1.236/1.236Red light camera installation at intersection of 9th and E Street. Will involve some trenching/boring and loop installation.9th and E Streets, Marysville09/17/2014NOT VERIFIEDDetails CEM-3701 Report
6408Project ID: 6408
Permit Numbers: 1204NMC0530
12-ORA-133-4.2-8.1Reduce and re-contour two existing stockpiles (Sta 399+25 to 402+30 and Sta 475+80 to 486+25)along the median of Laguna Canyon Rd between SR-73 and I-405. This item will remove approximately 29,650 CY of soil. 2. Remove pile of boulders at Median StockpileBetween SR-73 and I-40509/08/2016NOT VERIFIEDDetails CEM-3701 Report
5078Project ID: 5078
DEA: 080M0704
MINOR: 08A1734
08-RIV-72-40.9REDUCE THE EXISTING CURB HEIGHT TO ADJACENT CURB, UPGRADE EXISTING NONSTANDARD CURB RAMPS 09/02/2010NOT VERIFIEDDetails CEM-3701 Report
2101Project ID: 2101
DEA: 04285004
04-MRN-101-2/25.6Redwood Landfill Access Over crossing 05/05/20111 (05/05/2011)Details CEM-3701 Report