Project ID | Project Identifiers | DIST-CO-RTE-PM | Work Description | Location Description | Caltrans Closeout Date | METS Service Level | Actions |
---|---|---|---|---|---|---|---|
213464 | Project ID: 213464 Permit Numbers: 04156MC1658 0417NRD1957 | 04-ALA-238-2.5/2.5 | The proposed improvements include rough grading,installation of curb,gutter,5' sidewalk,underground electrical/gas/telecom utilities,potable waterline crossing,sanitary sewer pipeline crossing,street trees,two street lights,and landscaping. | 38861 Mission Boulevard, Fremont | 08/22/2018 | 1 (06/28/2018) | Details CEM-3701 Report |
213465 | Project ID: 213465 DEA: 024H3904 | 02-SHA-5-54.9, 54.6/55.9 | Remove existing rock buttress, construct toe buttress and reconstruct rock/soil mix buttress, with drainage and Geo-textile reinforcement | 08/25/2020 | 1 (01/08/2019) | Details CEM-3701 Report | |
213466 | Project ID: 213466 DEA: 034H4404 | 03-PLA-80-50.78 | Replace 72" CMP culvert and invert pave the length of the culvert | 05/05/2020 | 1 (01/08/2019) | Details CEM-3701 Report | |
213467 | Project ID: 213467 DEA: 034H4504 | 03-PLA-80-21.1, 21.1, 41.5 | Replace a failed culvert, install cured in place pipe (CIPP), DIs, striping, HMA paveing, traffic control, and COZEEP | 01/02/2019 | NOT VERIFIED | Details CEM-3701 Report | |
213468 | Project ID: 213468 DEA: 100G5004 | 10-MER-5-Var | 1 (06/26/2019) | Details CEM-3701 Report | |||
213469 | Project ID: 213469 DEA: 024C40V4 EFIS: 0218000125 | 02-SHA-5-R3.8/R11.7 | WIDEN TO 6 LANES, BRIDGE REPLACEMENT AND WIDENING AND ROADWAY REHAB | SHASTA COUNTY IN AND NEAR ANDERSON FROM ROUTE 5/273 SEPARATION TO 0.4 MILE SOUTH OF CHURN CREEK ROAD OVERCROSSING | 08/16/2023 | 1 (12/31/2018) | Details CEM-3701 Report |
213470 | Project ID: 213470 DEA: 06394604 EFIS: 0600020595 | 06-FRE-269-10.6/12.4 | REPLACE BRIDGES AND RECONSTRUCT ROADWAY. | FRESNO COUNTY NEAR HURON FROM 1.0 MILE NORTH OF PALMER AVENUE TO 0.4 MILE SOUTH OF ROUTE 198 | 10/15/2020 | 1 (09/25/2018) | Details CEM-3701 Report |
213471 | Project ID: 213471 DEA: 120N9804 EFIS: 1215000016 MINOR: 12A1716 | 12-ORA-55-R5.8 | FOR CONSTRUCTION ON STATE HIGHWAY IN ORANGE COUNTY IN THE CITY OF COSTA MESA, AT 0.2 MILES SOUTH OF ROUTE 55/405 SEPARATION | In District 12 On Route 55 | 07/01/2024 | 1 (07/02/2018) | Details CEM-3701 Report |
213472 | Project ID: 213472 DEA: 031H0604 EFIS: 0316000052 | 03-YOL-50-0.7 | Guardrail reconstruction Yolo 80/50 connector | 07/22/2021 | 1 (01/08/2019) | Details CEM-3701 Report | |
213473 | Project ID: 213473 Permit Numbers: 0717NMC0725 07176DP2028 0717NRW2377 07186RT0795 | 07--105-9.788/9.788 | Addition of a pedestrian crosswalk on south side of the intersection to accommodate the proposed pedestrian crosswalk. Signal modifications, activated push button installation, curb return, sidewalk and curb ramp modifications. Existing median will be adjusted to accommodate the proposed crosswal | Willowbrook Ave east, NA | 06/17/2021 | 1 (06/17/2021) | Details CEM-3701 Report |