Project IDProject IdentifiersDIST-CO-RTE-PMWork DescriptionLocation DescriptionCaltrans Closeout DateMETS Service LevelActions
     
5199Project ID: 5199
DEA: 081A0104
08-RIV-74-R23.5ASPHALT CONCRETE OVERLAYIN RIVERSIDE COUNTY NEAR LAKE ELSINORE FROM MAPES ROAD TO NAVAJO ROAD 1 (04/16/2014)Details CEM-3701 Report
5198Project ID: 5198
EFIS: 0000001155
Permit Numbers: 0811NRW0155
08-RIV-111-53.821/53.877Enter onto State right of way at Vista Chino (SR-111) and Indian Canyon Drive in City of Palm Springs to modify existing traffic signal and install a wireless signal interconnect system at Palm canyon Drive as per plans and special provisions date stampedVista Chino (SR-111) Indian Canyon Drive, Palm Springs03/04/20111 (03/04/2011)Details CEM-3701 Report
5197Project ID: 5197
DEA: 08468004
EFIS: 0800000744
COOP: 12224
Permit Numbers: 0812NDP0909 0811NMC0715 0812NDP0909
08-SBD-10-12.3/14.1Enter onto Interstate 10 (I-10) right-of-way at Cherry Avenue in the City of Fontana to reconstruct the Cherry Avenue interchange as per plans and specifications date stamped September 14, 2011, per parent permit 08-11-N-MC-0715, and per SWPPP and permitCherry Avenue, Fontana09/14/20151 (12/12/2012)Details CEM-3701 Report
5196Project ID: 5196
DEA: 08464614
EFIS: 0800001041
Permit Numbers: 0811NMC0714 0812NDP0176 0812NRT1148
08-RIV--12.2/15.8Enter onto State Route 79 (Winchester Road) right-of-way between Scott Road and Domenigoni Parkway, near Murrieta area, to widen one side of the State highway from two to four lanes, including but not limited to drainage, erosion control, signal & ligState Route 79 (Winchester Road), Murrieta area 1 (05/17/2012)Details CEM-3701 Report
5195Project ID: 5195
DEA: 080K4004
EFIS: 0800000345
Permit Numbers: 0811NMC0640 0811NMC0640
08-RIV-79-7.63/8.44Enter onto State Route 79 (Winchester Road) at and near Thompson Road, in the City of Murrieta, to widen the State highway including but not limited to the construction of a new AC pavement, curb & gutter, sidewalk, handicapped ramps, storm drain pipes, landscape, street lights, and traffic sigState Route 79 (Winchester Road), Murrieta07/31/2018NOT VERIFIEDDetails CEM-3701 Report
5194Project ID: 5194
DEA: 080N7504
EFIS: 0800000541
Permit Numbers: 0811NMC0628
08-RIV-10-54.52/54.93Enter onto Interstate 10 right-of-way at Monroe Street Interchange in the City of Indio, to widen all four ramps, widen Monroe Street, construct a drainage system, install new traffic signals and pavement markings , remove/relocate signs and street lightiMonroe Street, Indio08/13/20121 (08/13/2012)Details CEM-3701 Report
5193Project ID: 5193
EFIS: 0000001155
Permit Numbers: 0811NMC0572
08-RIV-215-30.8/31.1Enter onto Interstate 215 right-of-way at Ramona Expressway near Perris area, to widen the southbound & northbound off-ramps and overcrossing bridge including the construction of a retaining wall, new traffic signals, landscape and an additional left-Interstate 215 , Perris02/16/20131 (02/16/2013)Details CEM-3701 Report
5192Project ID: 5192
EFIS: 0000001155
Permit Numbers: 0811NMC0517
08-SBD-10-14.8/15.5Enter onto Interstate 10 (I-10) right-of-way at Citrus Avenue Interchange, in the City of Fontana to reconstruct the interchange as per plans and specifications date stamped July 26, 2011 by California Department of Transportation (Department) District 8Citrus Avenue, Fontana07/26/20131 (07/26/2013)Details CEM-3701 Report
5191Project ID: 5191
DEA: 110P3004
Permit Numbers: 0811NMC0449
08-SBD-215-13.8/14Enter onto Interstate 215 right-of-way west of Kendall Drive in the City of San Bernardino to construct Park & Ride Facility within State right-of-way as per plans and specifications date stamped June 28, 2011 by Department of Transportation, DistrictKendall Drive, San Bernardino05/12/2012NOT VERIFIEDDetails CEM-3701 Report
5190Project ID: 5190
Permit Numbers: 0811NDP0453
08-RIV-10-39/39.9Enter onto Interstate 10 right-of-way at Date Palm Drive Interchange, in Cathedral City, for the reconstruction of the interchange including Bridge widening six-lanes overcrossing with sidewalks and bike lanes, a raised median, new signals, and new/realignDate Palm Drive Interchange, Cathedral City07/31/20181 (01/30/2013)Details CEM-3701 Report