Projects
To search for a project, enter filter criteria in the appropriate input field below. If a project is not listed, please contact a METS Representative for assistance.Displaying 12291-12300 of 17400 results.
Project ID | Project Identifiers | DIST-CO-RTE-PM | Work Description | Location Description | Caltrans Closeout Date | METS Service Level | Actions |
---|---|---|---|---|---|---|---|
5199 | Project ID: 5199 DEA: 081A0104 | 08-RIV-74-R23.5 | ASPHALT CONCRETE OVERLAY | IN RIVERSIDE COUNTY NEAR LAKE ELSINORE FROM MAPES ROAD TO NAVAJO ROAD | 1 (04/16/2014) | Details CEM-3701 Report | |
5198 | Project ID: 5198 EFIS: 0000001155 Permit Numbers: 0811NRW0155 | 08-RIV-111-53.821/53.877 | Enter onto State right of way at Vista Chino (SR-111) and Indian Canyon Drive in City of Palm Springs to modify existing traffic signal and install a wireless signal interconnect system at Palm canyon Drive as per plans and special provisions date stamped | Vista Chino (SR-111) Indian Canyon Drive, Palm Springs | 03/04/2011 | 1 (03/04/2011) | Details CEM-3701 Report |
5197 | Project ID: 5197 DEA: 08468004 EFIS: 0800000744 COOP: 12224 Permit Numbers: 0812NDP0909 0811NMC0715 0812NDP0909 | 08-SBD-10-12.3/14.1 | Enter onto Interstate 10 (I-10) right-of-way at Cherry Avenue in the City of Fontana to reconstruct the Cherry Avenue interchange as per plans and specifications date stamped September 14, 2011, per parent permit 08-11-N-MC-0715, and per SWPPP and permit | Cherry Avenue, Fontana | 09/14/2015 | 1 (12/12/2012) | Details CEM-3701 Report |
5196 | Project ID: 5196 DEA: 08464614 EFIS: 0800001041 Permit Numbers: 0811NMC0714 0812NDP0176 0812NRT1148 | 08-RIV--12.2/15.8 | Enter onto State Route 79 (Winchester Road) right-of-way between Scott Road and Domenigoni Parkway, near Murrieta area, to widen one side of the State highway from two to four lanes, including but not limited to drainage, erosion control, signal & lig | State Route 79 (Winchester Road), Murrieta area | 1 (05/17/2012) | Details CEM-3701 Report | |
5195 | Project ID: 5195 DEA: 080K4004 EFIS: 0800000345 Permit Numbers: 0811NMC0640 0811NMC0640 | 08-RIV-79-7.63/8.44 | Enter onto State Route 79 (Winchester Road) at and near Thompson Road, in the City of Murrieta, to widen the State highway including but not limited to the construction of a new AC pavement, curb & gutter, sidewalk, handicapped ramps, storm drain pipes, landscape, street lights, and traffic sig | State Route 79 (Winchester Road), Murrieta | 07/31/2018 | NOT VERIFIED | Details CEM-3701 Report |
5194 | Project ID: 5194 DEA: 080N7504 EFIS: 0800000541 Permit Numbers: 0811NMC0628 | 08-RIV-10-54.52/54.93 | Enter onto Interstate 10 right-of-way at Monroe Street Interchange in the City of Indio, to widen all four ramps, widen Monroe Street, construct a drainage system, install new traffic signals and pavement markings , remove/relocate signs and street lighti | Monroe Street, Indio | 08/13/2012 | 1 (08/13/2012) | Details CEM-3701 Report |
5193 | Project ID: 5193 EFIS: 0000001155 Permit Numbers: 0811NMC0572 | 08-RIV-215-30.8/31.1 | Enter onto Interstate 215 right-of-way at Ramona Expressway near Perris area, to widen the southbound & northbound off-ramps and overcrossing bridge including the construction of a retaining wall, new traffic signals, landscape and an additional left- | Interstate 215 , Perris | 02/16/2013 | 1 (02/16/2013) | Details CEM-3701 Report |
5192 | Project ID: 5192 EFIS: 0000001155 Permit Numbers: 0811NMC0517 | 08-SBD-10-14.8/15.5 | Enter onto Interstate 10 (I-10) right-of-way at Citrus Avenue Interchange, in the City of Fontana to reconstruct the interchange as per plans and specifications date stamped July 26, 2011 by California Department of Transportation (Department) District 8 | Citrus Avenue, Fontana | 07/26/2013 | 1 (07/26/2013) | Details CEM-3701 Report |
5191 | Project ID: 5191 DEA: 110P3004 Permit Numbers: 0811NMC0449 | 08-SBD-215-13.8/14 | Enter onto Interstate 215 right-of-way west of Kendall Drive in the City of San Bernardino to construct Park & Ride Facility within State right-of-way as per plans and specifications date stamped June 28, 2011 by Department of Transportation, District | Kendall Drive, San Bernardino | 05/12/2012 | NOT VERIFIED | Details CEM-3701 Report |
5190 | Project ID: 5190 Permit Numbers: 0811NDP0453 | 08-RIV-10-39/39.9 | Enter onto Interstate 10 right-of-way at Date Palm Drive Interchange, in Cathedral City, for the reconstruction of the interchange including Bridge widening six-lanes overcrossing with sidewalks and bike lanes, a raised median, new signals, and new/realign | Date Palm Drive Interchange, Cathedral City | 07/31/2018 | 1 (01/30/2013) | Details CEM-3701 Report |