Projects
To search for a project, enter filter criteria in the appropriate input field below. If a project is not listed, please contact a METS Representative for assistance.Displaying 12251-12260 of 17395 results.
Project ID | Project Identifiers | DIST-CO-RTE-PM | Work Description | Location Description | Caltrans Closeout Date | METS Service Level | Actions |
---|---|---|---|---|---|---|---|
213406 | Project ID: 213406 DEA: 030F2504 EFIS: 0300000075 | 03-YOL,SAC-80-R11.1/R11.7,M0.0/M0.5 | SAC RIVER BOH (BRYTE BEND) | SACRAMENTO AND YOLO COUNTIES IN WEST SACRAMENTO AND SACRAMENTO FROM 0.1 MILE WEST OF REED AVENUE UNDERCROSSING TO 0.1 MILE EAST OF SACRAMENTO RIVER BRIDGE AND OVERHEAD | 07/31/2023 | 1 (06/07/2018) | Details CEM-3701 Report |
213408 | Project ID: 213408 DEA: 080K1104 | 08-RIV-10-97.0 | Repair damaged pavement and guard rail. | 1 (06/24/2021) | Details CEM-3701 Report | ||
213409 | Project ID: 213409 DEA: 01427804 EFIS: 0100000180 | 01-LAK-20,29-VAR | CULVERT REHABILITATION. | LAKE COUNTY AT VARIOUS LOCATIONS | 01/11/2021 | 1 (08/24/2018) | Details CEM-3701 Report |
213410 | Project ID: 213410 DEA: 024C1504 EFIS: 0213000132 | 02-SIS-96-23.4/54.5 | APC, BOX CULVERTS, CONCRETE HEADWALLS, AND JACKED WELDED STEEL PIPE. | SISKIYOU COUNTY AT AND NEAR HAPPY CAMP AT VARIOUS LOCATIONS FROM 0.1 MILE WEST OF SWILLUP CREEK BRIDGE TO 3.6 MILES EAST OF THOMPSON CREEK BRIDGE | 01/04/2021 | 1 (01/08/2019) | Details CEM-3701 Report |
213411 | Project ID: 213411 DEA: 030H10U4 EFIS: 0317000246 | 03-SAC-5-9.7/24.9 | Construction on state highway in Sacramento County in and near Sacramento from 1.1 miles south of Elk Grove Boulevard to American River Viaduct | 02/22/2024 | 1 (07/19/2019) | Details CEM-3701 Report | |
213412 | Project ID: 213412 DEA: 050C6414 EFIS: 0514000081 | 05-SB-246-R13.6/R15.2,R16.1 | LANDSCAPING AND IRRIGATION WORK | SANTA BARBARA COUNTY NEAR LOMPOC FROM 0.8 MILE EAST OF CEBADA CANYON ROAD TO 0.4 MILE EAST OF TULAROSA ROAD AND AT HAPGOOD ROAD (WEST) | 09/02/2022 | 1 (09/06/2019) | Details CEM-3701 Report |
213413 | Project ID: 213413 DEA: 060P9004 EFIS: 0612000293 | 06-KER-43,119-0.1/0.5,17.8/18.5 | INTERSECTION IMPROVEMENT | KERN COUNTY ON ROUTE 43 FROM ROUTE 119 TO 0.4 MILE NORTH OF ROUTE 119 AND ON ROUTE 119 FROM 0.4 MILE WEST OF ROUTE 43 TO 0.3 MILE EAST OF ROUTE 43 | 09/17/2020 | 1 (09/25/2018) | Details CEM-3701 Report |
213414 | Project ID: 213414 DEA: 060S4504 EFIS: 0614000155 | 06-KER-99-23.6/24.1,25.6 | INSTALL HIGHWAY LIGHTING. | KERN COUNTY IN BAKERSFIELD FROM BRUNDAGE LANE OVERCROSSING TO PLAM AVENUE AND AT ROUTE 58/99/178 SEPARATION | 06/19/2019 | 1 (09/25/2018) | Details CEM-3701 Report |
213415 | Project ID: 213415 DEA: 060T2104 EFIS: 0615000037 | 06-MAD-99-22.7/29.4 | PAVEMENT REHAB | MADERA COUNTY IN AND NEAR CHOWCHILLA FROM ROUTE 152/99 SEPARATION TO MERCED COUNTY LINE | 10/15/2020 | 1 (09/25/2018) | Details CEM-3701 Report |
213416 | Project ID: 213416 DEA: 081C1604 | 08-RIV-60,215-R38.3/38.9,12.1/21.5 | INSTALL ROCK BLANKET AND IMPROVE IRRIGATION SYSTEM. | RIVERSIDE COUNTY IN MORENO VALLEY ON ROUTE 60 FROM 215/60 SEPARATION TO THEODORE STREET AND ON ROUTE 215 FROM 0.3 MILE NORTH OF BOX SPRINGS ROAD TO 0.6 MILE SOUTH OF BOX SPRINGS ROAD | 06/23/2021 | 1 (12/31/2018) | Details CEM-3701 Report |