Projects
To search for a project, enter filter criteria in the appropriate input field below. If a project is not listed, please contact a METS Representative for assistance.Displaying 12231-12240 of 18772 results.
| Project ID | Project Identifiers | DIST-CO-RTE-PM | Work Description | Location Description | Caltrans Closeout Date | METS Service Level | Actions |
|---|---|---|---|---|---|---|---|
| 3389 | Project ID: 3389 EFIS: 0000001155 Permit Numbers: 0611NDP0645 | 06-MAD-99-13.15/13.15 | Enter upon the State Highway Right-of-way on State Route 99 (SR-99) in Madera at and near Post Mile 13.15 to set up, maintain, and remove temporary traffic control necessary in order to construct the new bridge for the Ellis Street/Avenue 16 Overcrossing | SR99, Madera | 07/30/2018 | 2 (12/05/2014) | Details CEM-3701 Report |
| 3381 | Project ID: 3381 EFIS: 0000001155 Permit Numbers: 0610NMC0429 | 06-MAD-99-13.15/13.15 | Enter upon the State Highway Right-of-way on State Route 99 (SR-99) in Madera at and near PM 13.15 to set up, maintain, and remove temporary traffic control necessary in order to construct the new bridge for the Ellis Street/Avenue 16 Overcrossing Project | SR99, Madera | 06/11/2018 | 2 (12/05/2014) | Details CEM-3701 Report |
| 7558 | Project ID: 7558 EFIS: 0000001155 Permit Numbers: 0612NDP0384 | 06-KER-99-54.48/54.48 | Enter upon the State Highway Right-of-way on State Route 99 (SR-99) in Kern County in Delano at and near the Woollomes Avenue Overcrossing Interchange (PM 54.48) to set up, maintain, and remove temporary traffic control necessary in order to construct the | Woollomes Ave. Interchange, Delano | 07/30/2018 | 2 (12/29/2014) | Details CEM-3701 Report |
| 211038 | Project ID: 211038 Permit Numbers: 0615AOP0509 | 06-KER-99-25.8/26.2 | Enter upon the State Highway Right-of-way on State Route 99 (SR 99) in Kern County to set up, maintain, and remove temporary traffic control necessary to construct the City of Bakersfield SR 99/Rosedale Hwy Off-Ramp Improvement Project. The Project include, but not limited to, construct an auxilia | SR-99/Rosedale Hwy, Bakersfield | 11/30/00-1 | 1 (05/08/2019) | Details CEM-3701 Report |
| 210566 | Project ID: 210566 DEA: 060L2704 EFIS: 0600000299 COOP: 061457,061457A1 Permit Numbers: 0615ADP0429 0614NOP0785 0615ART0626 0615ART1029 | 06-FRE-99-23.4/23.4 | Enter upon the State Highway Right-of-way on State Route 99 (SR 99) in Fresno County at the Intersection of Olive Avenue and SR 99 ON/Off-Ramps (PM 23.4) to set up, maintain, and remove temporary traffic control necessary to construct the City?s proposed traffic signal, Ramps Metering System and Ra | Olive Av & Fwy 99, Fresno | 03/12/2020 | 1 (08/17/2015) | Details CEM-3701 Report |
| 3379 | Project ID: 3379 EFIS: 0000001155 Permit Numbers: 0610NDP0541 | 06-TUL-63-5.8/8 | Enter upon the State Highway Right-of-way on State Route 63 (SR-63) in Visalia between Post Mile 5.8 and 8.0 to set up, maintain, and remove temporary traffic control necessary to construct the Citys Whitendale Avenue Street Widening Project (Contract No. | Whitendal Avenue at Mooney Blvd., Visalia | 06/11/2018 | 2 (12/05/2014) | Details CEM-3701 Report |
| 3033 | Project ID: 3033 DEA: 06307004 COOP: 061361 Permit Numbers: 0610NMC0203 0609NMC0132 0611NDP0483 | 06-TUL-63-5.8/8 | Enter upon the State Highway Right-of-way on State Route 63 (SR-63) in Visalia between Post Mile 5.8 and 8.0 to set up, maintain, and remove temporary traffic control necessary to construct the Citys Whitendale Avenue Street Widening Project | Whitendal Avenue at Mooney Blvd., Visalia | 10/13/2010 | NOT VERIFIED | Details CEM-3701 Report |
| 210073 | Project ID: 210073 DEA: 060Q4604 EFIS: 0613000133 COOP: 061542 Permit Numbers: 0614NOP0788 0615ADP0297 | 06-TUL-63-8.4/8.9 | Enter upon the State Highway Right-of-way on State Route 63 (SR 63) in Tulare County between PM 8.4 and PM R8.9 to set up, maintain, and remove temporary traffic control necessary to construct the proposed SR 63 and Lincoln Oval Street Improvement Project (City of Visalia Project No. 3010-72000/CP8 | Court & Locust, Visalia | 04/27/2018 | 2 (12/29/2014) | Details CEM-3701 Report |
| 208826 | Project ID: 208826 DEA: 060G8504 EFIS: 0600020167 COOP: 061535 Permit Numbers: 0613NMC0437 | 06-KER-58-52.7/55.5 | Enter upon the State Highway Right-of-way on State Route 58 (SR-58) in Bakersfield near the SR-58/SR-99 Separation at SR-58/Hughes Lane Overcrossing (PM R52.7) to set up, maintain, and remove temporary traffic control necessary in order to construct the C | SR58, Bakersfield | 08/27/2018 | 2 (07/24/2013) | Details CEM-3701 Report |
| 3037 | Project ID: 3037 EFIS: 0000001155 Permit Numbers: 0609NSN0084 | 06-KER-58-50/51 | Enter upon the State Highway Right-of-way on State Route 58 (SR-58) in Bakersfield between Post Mile 50 and 51 to set up, maintain, and remove temporary traffic control necessary in order to widen the roadway and to install traffic signals and lighting at | Rosedale Highway, Bakersfield | 06/11/2018 | 2 (11/25/2014) | Details CEM-3701 Report |
