Projects
To search for a project, enter filter criteria in the appropriate input field below. If a project is not listed, please contact a METS Representative for assistance.Displaying 12221-12230 of 19348 results.
| Project ID | Project Identifiers | DIST-CO-RTE-PM | Work Description | Location Description | Caltrans Closeout Date | METS Service Level | Actions |
|---|---|---|---|---|---|---|---|
| 7777 | Project ID: 7777 DEA: 060G8404 EFIS: 0600020166 COOP: 061474A1 | 06-KER-99-27.0/R28.4 | CONSTRUCT INSIDE LANES, SHOULDERS, AND CONCRETE BARRIER. | KERN COUNTY NEAR BAKERSFIELD FROM ROUTE 204/99 SEPARATION TO BEARDSLEY CANAL | 12/19/2014 | 1 (12/10/2012) | Details CEM-3701 Report |
| 1001616 | Project ID: 1001616 DEA: 061C0604 EFIS: 0621000014 | 06-KER-223-1.8/10.4 | FULL DEPTH RECYCLE AND V-DITCHES. | KERN COUNTY NEAR BAKERSFIELD FROM ROUTE 223/5 SEPARATION TO 0.1 MILE WEST OF ROUTE 223/99 SEPARATION | 1 (10/06/2025) | Details CEM-3701 Report | |
| 208641 | Project ID: 208641 DEA: 060Q3604 | 06-KER-119-19.7/30.4 | COLD IN-PLACE RECYCLING AND PAVEMENT RESURFACING. | KERN COUNTY NEAR BAKERSFIELD FROM ROUTE 5/119 SEPARATION TO WIBLE ROAD | 10/08/2014 | 1 (08/22/2013) | Details CEM-3701 Report |
| 213445 | Project ID: 213445 DEA: 060T2004 EFIS: 0615000035 | 06-KER-99-0.0/11.2 | PAVEMENT REHABILITATION (2R) | KERN COUNTY NEAR BAKERSFIELD FROM ROUTE 5/99 SEPARATION TO 0.3 MILE NORTH OF OLD US 99 OVERCROSSING | 05/16/2024 | 1 (01/09/2019) | Details CEM-3701 Report |
| 8019 | Project ID: 8019 DEA: 060N1504 EFIS: 0600020439 | 06-KER-58-R59.6/R64.4,67.0/77.3 | OVERLAY WITH HOT MIX ASPHALT (BONDED WEARING COURSE) | KERN COUNTY NEAR BAKERSFIELD FROM ROUTE 58/184 SEPARATION TO 0.2 MILE WEST OF TEJON HIGHWAY OVERCROSSING AND FROM 0.3 MILE WEST OF CALIENTE CREEK BRIDGE TO 0.2 MILE EAST OF BEALVILLE ROAD | 10/08/2014 | 1 (12/10/2012) | Details CEM-3701 Report |
| 3207 | Project ID: 3207 DEA: 060H2504 | 06-KER-178-13.7/16.0,20.0/27.2 | PLACE RUBBERIZED HOT MIX ASPHALT ON EXISTING PAVEMENT. | KERN COUNTY NEAR BAKERSFIELD FROM SIDEHILL VIADUCT TO 0.8 MILE EAST OF EDISON POWERHOUSE AND FROM 0.1 MILE WEST OF UPPER RICHBAR CAMPGROUND TO 0.5 MILE EAST OF DEMOCRAT SPRINGS ROAD | 03/09/2012 | 1 (04/27/2011) | Details CEM-3701 Report |
| 3117 | Project ID: 3117 DEA: 060E5904 | 06-KER-99-3.9/10.4 | REGRADE THE NB OUTSIDE SHOULDER AND INSTALL CULVERT. | KERN COUNTY NEAR BAKERSFIELD FROM VALPREDO ROAD TO 1.1 MILE NORTH OF HERRING ROAD | 12/13/2012 | 1 (05/02/2011) | Details CEM-3701 Report |
| 995236 | Project ID: 995236 DEA: 060U2904 EFIS: 0616000001 | 06-KER-184-1.1/8.3 | COLD PLANE & OVERLAY WITH HMA/RHMA, CONSTRUCT SIDEWALKS & CURB RAMPS. | KERN COUNTY NEAR BAKERSFIELD FROM WHARTON AVENUE TO EDISON HIGHWAY | 1 (12/18/2024) | Details CEM-3701 Report | |
| 215398 | Project ID: 215398 DEA: 060X5204 | 06-KER-178,223-10.4/57.0,R17.1/R20.0 | COLD PLANE PAVEMENT, PLACE HMA, RUMBLE STRIPS AND TRAFFIC STRIPES. | KERN COUNTY NEAR BAKERSFIELD ON ROUTE 178 FROM 0.2 MILE EAST OF MIRAMONTE DRIVE TO KELSO VALLEY ROAD AND ON ROUTE 223 FROM VINELAND ROAD TO COMANCHE DRIVE | 03/02/2022 | 1 (01/04/2021) | Details CEM-3701 Report |
| 215321 | Project ID: 215321 DEA: 060U1004 EFIS: 0615000211 | 06-KER-43,119-0.1/9.3,18.2/19.7 | COLD IN PLACE RECYCLING AND RESURFACING EXISTING ROADWAY WITH RHMA. | KERN COUNTY NEAR BAKERSFIELD ON ROUTE 43 FROM ROUTE 119 TO 0.1 MILE NORTH OF ROUTE 58-MCKITTRICK HIGHWAY AND ON ROUTE 119 FROM ROUTE 43 TO ROUTE 119/5 SEPARATION | 05/04/2022 | 1 (11/30/2020) | Details CEM-3701 Report |
