Projects

To search for a project, enter filter criteria in the appropriate input field below. If a project is not listed, please contact a METS Representative for assistance.
Displaying 12151-12160 of 18772 results.
Project IDProject IdentifiersDIST-CO-RTE-PMWork DescriptionLocation DescriptionCaltrans Closeout DateMETS Service LevelActions
     
571Project ID: 571
DEA: 02301714
02-TEH-5-R 28.0EXISTING FREEWAY LANES TO BE WIDENED WITH AC 03/11/20111 (03/02/2006)Details CEM-3701 Report
1373Project ID: 1373
DEA: 04042254
04-SM,ALA-84-R29.3/R30.2, 0.0/0.7Existing Expansion Joint Panels To Be Replaced. 05/05/20111 (05/05/2011)Details CEM-3701 Report
827Project ID: 827
DEA: 030E1804
03-SAC-50-L1.7/R3.2EXISTING DECKS TO BE REHABILITATED AND JOINT SEALS REPLACED12/17/20121 (07/21/2006)Details CEM-3701 Report
40Project ID: 40
DEA: 01293144
01-DN-199-17.4/18.0Existing bridge to be replaced.Del Norte County near Gasquet from 0.3 km South Hardscrabble Creek Bridge to 0.2 km North of Hardscrabble Creek Bridge.03/23/20101 (03/23/2010)Details CEM-3701 Report
4905Project ID: 4905
DEA: 080G5004
08-SBd-60-R0.0/R6.9EXISTING BRIDGE DECK TO SEALED 07/28/20101 (07/28/2010)Details CEM-3701 Report
4779Project ID: 4779
EFIS: 0000001155
Permit Numbers: 08096MC0339
08-RIV-60-14.425Existing Block Wall built along State & prime; existing Chain link Fence. The wall is located within private property.23090 Sunnymead Blvd.12/04/20092 (12/04/2009)Details CEM-3701 Report
6874Project ID: 6874
DEA: 034M3204
EFIS: 0300020522
03-BUT-70-41.1/48.1EXISTING ASPHALT TO BE RESURFACED BY MICRO-SURFACINGBUTTE COUNTY ABOUT 25 MILES NORTH OF OROVILLE FROM NORTH FORK FEATHER RIVER BRIDGE TO THE PLUMAS COUNTY LINE07/13/20121 (06/12/2012)Details CEM-3701 Report
3469Project ID: 3469
DEA: 06463604
06-KER-58-107.8/124.3EXISTING AC & PCC TO BE REPLACED WITH RUBBERIZED AF & NEW PCC 04/21/20111 (06/29/2006)Details CEM-3701 Report
1000471Project ID: 1000471
DEA: 060S3704
EFIS: 0614000130
06-FRE-41-0/7.1Excelsior Expressway II/The project would expand State Route 41 to four lanes.Fresno and Kings counties, approximately 6 miles north of Lemoore, from 0.3 mile north of the Excelsior Avenue Undercrossing to 1.0 mile north of Elkhorn Avenue. NOT VERIFIEDDetails CEM-3701 Report
993184Project ID: 993184
DEA: 040A7724
EFIS: 0420000288
COOP: 0422825
04-ALA-80-6.4/6.8Excavation, HMA, structural concrete, minor concrete and drainage.IN BERKELEY AND ALBANY FROM 0.6 MILE NORTH OF UNIVERSITY AVENUE OVERCROSSING TO 0.3 MILE SOUTH OF EL CERRITO SEPARATION AND OVERHEAD 1 (04/08/2022)Details CEM-3701 Report