Projects
To search for a project, enter filter criteria in the appropriate input field below. If a project is not listed, please contact a METS Representative for assistance.Displaying 12141-12150 of 18772 results.
| Project ID | Project Identifiers | DIST-CO-RTE-PM | Work Description | Location Description | Caltrans Closeout Date | METS Service Level | Actions |
|---|---|---|---|---|---|---|---|
| 213 | Project ID: 213 DEA: 01475104 | 01-HUM-254-5.1/5.6 | Reconstruct highway with tieback retaining walls, replace culverts. | HUMBOLDT COUNTY NEAR MIRANDA FROM 1.3 MILES SOUTH OF MIRANDA POST OFFICE TO 0.8 MILE SOUTH OF MIRANDA POST OFFICE | 12/10/2012 | NOT VERIFIED | Details CEM-3701 Report |
| 215028 | Project ID: 215028 DEA: 120Q6904 EFIS: 1217000088 | 12-ORA-5,22,55,57,73,etc-var | RECONSTRUCT INDUCTIVE, VEHICLE DETECTION, AND RAMP METERING SYSTEMS. | ORANGE COUNTY AT VARIOUS LOCATIONS | 10/27/2022 | 1 (11/12/2020) | Details CEM-3701 Report |
| 2954 | Project ID: 2954 DEA: 05349504 | 05-MON-101-85.0/85.8 | Reconstruct interchange | MONTEREY COUNTY IN AND NEAR SALINAS FROM 0.6 MILE SOUTH TO 0.2 MILE NORTH OF AIRPORT BOULEVARD OVERCROSSING | 12/05/2012 | NOT VERIFIED | Details CEM-3701 Report |
| 7451 | Project ID: 7451 EFIS: 0000001155 Permit Numbers: 0308NMC0223 | 03-PLA-65-6.5/7.4 | Reconstruct Interchange | Pleasant Grove Blvd, Roseville | 04/27/2018 | 2 (12/05/2014) | Details CEM-3701 Report |
| 7571 | Project ID: 7571 DEA: 06471004 EFIS: 0600000463 | 06-MAD-99-R6.9/R8.2 | RECONSTRUCT INTERCHANGE | MADERA COUNTY NEAR MADERA FROM 0.6 MILE SOUTH OF AVENUE 12 OVERCROSSING TO 0.7 MILE NORTH OF AVENUE 12 OVERCROSSING | 04/23/2018 | 1 (10/29/2012) | Details CEM-3701 Report |
| 7826 | Project ID: 7826 DEA: 040A1854 EFIS: 0400020652 COOP: 042363 | 04-SON-101-7.1/8.1 | RECONSTRUCT INTERCHANGE | SONOMA COUNTY IN PETALUMA FROM 0.6 MILE SOUTH TO 0.4 MILE NORTH OF OLD REDWOOD HIGHWAY OVERCROSSING | 01/03/2017 | 1 (12/10/2012) | Details CEM-3701 Report |
| 8166 | Project ID: 8166 COOP: 081496 Permit Numbers: 0811NMC0715 | 08-SBD-10-12.3-14.1 | Reconstruct interchange | City of Fontana at Cherry Avenue Interchange | 09/14/2012 | NOT VERIFIED | Details CEM-3701 Report |
| 211778 | Project ID: 211778 DEA: 04235654 EFIS: 0400000680 | 04-SM-101,114-1.3/2.5,5.0/5.3 | RECONSTRUCT INTERCHANGE | SAN MATEO COUNTY AT VARIOUS LOCATIONS ON ROUTE 101 FROM 0.4 MILE NORTH OF UNIVERSITY AVENUE OVERCROSSING TO 0.6 MILE SOUTH OF HENDERSON UNDERPASS AND ON ROUTE 114 FROM WILLOW ROAD SEPARATION TO NEWBRIDGE STREET | 01/08/2020 | 1 (10/24/2016) | Details CEM-3701 Report |
| 5176 | Project ID: 5176 Permit Numbers: 0810NMC0033 | 08-RIV-10-35.7/36.5 | RECONSTRUCT INTERCHANGE AT PALM DRIVE/GENE AUTRY TRAIL | 07/31/2018 | 2 (10/11/2010) | Details CEM-3701 Report | |
| 5956 | Project ID: 5956 DEA: 11070804 | 11-SD-15-R6.5 | Reconstruct interchange in the city of Santa Ana | IN SAN DIEGO COUNTY IN SAN DIEGOFROM 0.5 KM SOUTH OF FRIARS ROADOVERCROSSING TO 0.2 KM NORTH OF CLAIREMONT MESA BLVD OVERCROSSING | 07/29/2010 | 1 (07/29/2010) | Details CEM-3701 Report |
