Projects

To search for a project, enter filter criteria in the appropriate input field below. If a project is not listed, please contact a METS Representative for assistance.
Displaying 12141-12150 of 18772 results.
Project IDProject IdentifiersDIST-CO-RTE-PMWork DescriptionLocation DescriptionCaltrans Closeout DateMETS Service LevelActions
     
213Project ID: 213
DEA: 01475104
01-HUM-254-5.1/5.6Reconstruct highway with tieback retaining walls, replace culverts.HUMBOLDT COUNTY NEAR MIRANDA FROM 1.3 MILES SOUTH OF MIRANDA POST OFFICE TO 0.8 MILE SOUTH OF MIRANDA POST OFFICE12/10/2012NOT VERIFIEDDetails CEM-3701 Report
215028Project ID: 215028
DEA: 120Q6904
EFIS: 1217000088
12-ORA-5,22,55,57,73,etc-varRECONSTRUCT INDUCTIVE, VEHICLE DETECTION, AND RAMP METERING SYSTEMS.ORANGE COUNTY AT VARIOUS LOCATIONS10/27/20221 (11/12/2020)Details CEM-3701 Report
2954Project ID: 2954
DEA: 05349504
05-MON-101-85.0/85.8Reconstruct interchangeMONTEREY COUNTY IN AND NEAR SALINAS FROM 0.6 MILE SOUTH TO 0.2 MILE NORTH OF AIRPORT BOULEVARD OVERCROSSING12/05/2012NOT VERIFIEDDetails CEM-3701 Report
7451Project ID: 7451
EFIS: 0000001155
Permit Numbers: 0308NMC0223
03-PLA-65-6.5/7.4Reconstruct InterchangePleasant Grove Blvd, Roseville04/27/20182 (12/05/2014)Details CEM-3701 Report
7571Project ID: 7571
DEA: 06471004
EFIS: 0600000463
06-MAD-99-R6.9/R8.2RECONSTRUCT INTERCHANGEMADERA COUNTY NEAR MADERA FROM 0.6 MILE SOUTH OF AVENUE 12 OVERCROSSING TO 0.7 MILE NORTH OF AVENUE 12 OVERCROSSING04/23/20181 (10/29/2012)Details CEM-3701 Report
7826Project ID: 7826
DEA: 040A1854
EFIS: 0400020652
COOP: 042363
04-SON-101-7.1/8.1RECONSTRUCT INTERCHANGESONOMA COUNTY IN PETALUMA FROM 0.6 MILE SOUTH TO 0.4 MILE NORTH OF OLD REDWOOD HIGHWAY OVERCROSSING01/03/20171 (12/10/2012)Details CEM-3701 Report
8166Project ID: 8166
COOP: 081496
Permit Numbers: 0811NMC0715
08-SBD-10-12.3-14.1Reconstruct interchangeCity of Fontana at Cherry Avenue Interchange09/14/2012NOT VERIFIEDDetails CEM-3701 Report
211778Project ID: 211778
DEA: 04235654
EFIS: 0400000680
04-SM-101,114-1.3/2.5,5.0/5.3RECONSTRUCT INTERCHANGESAN MATEO COUNTY AT VARIOUS LOCATIONS ON ROUTE 101 FROM 0.4 MILE NORTH OF UNIVERSITY AVENUE OVERCROSSING TO 0.6 MILE SOUTH OF HENDERSON UNDERPASS AND ON ROUTE 114 FROM WILLOW ROAD SEPARATION TO NEWBRIDGE STREET01/08/20201 (10/24/2016)Details CEM-3701 Report
5176Project ID: 5176
Permit Numbers: 0810NMC0033
08-RIV-10-35.7/36.5RECONSTRUCT INTERCHANGE AT PALM DRIVE/GENE AUTRY TRAIL 07/31/20182 (10/11/2010)Details CEM-3701 Report
5956Project ID: 5956
DEA: 11070804
11-SD-15-R6.5Reconstruct interchange in the city of Santa AnaIN SAN DIEGO COUNTY IN SAN DIEGOFROM 0.5 KM SOUTH OF FRIARS ROADOVERCROSSING TO 0.2 KM NORTH OF CLAIREMONT MESA BLVD OVERCROSSING07/29/20101 (07/29/2010)Details CEM-3701 Report