Projects
To search for a project, enter filter criteria in the appropriate input field below. If a project is not listed, please contact a METS Representative for assistance.Displaying 12141-12150 of 17377 results.
Project ID | Project Identifiers | DIST-CO-RTE-PM | Work Description | Location Description | Caltrans Closeout Date | METS Service Level | Actions |
---|---|---|---|---|---|---|---|
994660 | Project ID: 994660 DEA: 101L3304 EFIS: 1020000049 | 10-MER-165-33.2 | INSTALL PEDESTRIAN HYBRID BEACON SYSTEMS. | MERCED COUNTY AT HILMAR AT CAMPBELL STREET | 1 (05/09/2023) | Details CEM-3701 Report | |
993589 | Project ID: 993589 DEA: 100T6804 EFIS: 1017000005 | 10-MER-5,165,152,33-Var | SHOULDER AND RAMP WIDENING, COLD PLANE, HMA PAVING AND DIKES. | MERCED COUNTY AT ROUTE 5/165 SEPARATION AND AT ROUTE 152/33 SEPARATION | 03/06/2024 | 1 (03/01/2022) | Details CEM-3701 Report |
210509 | Project ID: 210509 DEA: 100X6104 EFIS: 1013000003 | 10-MER-5-21.4 | REHABILITATE BRIDGE DECK AND REPLACE BRIDGE RAILS. | MERCED COUNTY AT SANTA NELLA AT SAN LUIS WASTEWAY BRIDGE | 01/23/2017 | 1 (09/18/2015) | Details CEM-3701 Report |
5791 | Project ID: 5791 DEA: 100T4204 | 10-MER-5,59,99,140,152,165-Var | Treat bridge decks with methacrylate and replace joint seals. | MERCED COUNTY AT VARIOUS LOCATIONS | 05/17/2011 | 1 (05/17/2011) | Details CEM-3701 Report |
993786 | Project ID: 993786 DEA: 101N4304 EFIS: 1021000185 | 10-MER-5,152-Var | APPLY POLYESTER CONCRETE OVERLAY TO BRIDGE DECKS. | MERCED COUNTY AT VARIOUS LOCATIONS | 09/21/2023 | 1 (04/29/2022) | Details CEM-3701 Report |
215426 | Project ID: 215426 DEA: 101C3704 EFIS: 1017000043 | 10-MER-152-26.4/R40.7 | CONSTRUCT MIDWEST GUARDRAIL, CONCRETE BARRIER AND VEGETATION CONTROL. | MERCED COUNTY AT VARIOUS LOCATIONS FROM 0.4 MILE EAST OF MIDWAY ROAD TO 0.2 MILE WEST OF ROUTE 59. | 11/09/2021 | 1 (02/01/2021) | Details CEM-3701 Report |
211093 | Project ID: 211093 DEA: 101E2704 EFIS: 1015000066 | 10-MER-99-13.1/R36.7 | TREAT BRIDGE DECK, REPLACE APPROACH SLABS AND JOINT SEALS. | MERCED COUNTY AT VARIOUS LOCATIONS FROM CHILD S AVENUE OVERCROSSING TO GRIFFITH ROAD OVERCROSSING. In District 10 On Route 99 | 04/14/2021 | 1 (08/22/2016) | Details CEM-3701 Report |
208901 | Project ID: 208901 DEA: 100S9504 EFIS: 1000020386 | 10-MER-99-13.1/R36.7 | PAINT BRIDGE AND SLOPE PAVING | MERCED COUNTY AT VARIOUS LOCATIONS FROM CHILDS AVENUE OVERCROSSING TO GRIFFITH ROAD OVERCROSSING | 07/28/2021 | 1 (01/06/2014) | Details CEM-3701 Report |
1000031 | Project ID: 1000031 DEA: 101P7504 EFIS: 1022000161 | 10-MER-99-R6.8/R34.1 | COLD PLANE AC PAVEMENT AND PLACE POLYESTER CONCRETE DECK OVERLAY. | MERCED COUNTY AT VARIOUS LOCATIONS FROM LE GRAND OVERCROSSING TO EL CAPITAN WAY UNDERCROSSING | 1 (01/17/2024) | Details CEM-3701 Report | |
215085 | Project ID: 215085 DEA: 100Y1104 EFIS: 1013000108 | 10-MER-140-0.0/42.1 | REMOVE AND REPLACE GUARDRAIL, TERMINAL SYSTEM AND END TREATMENTS. | MERCED COUNTY AT VARIOUS LOCATIONS FROM ROUTE 140/5 SEPARATION TO 1.3 MILES EAST OF N ARBOLEDA DRIVE. | 05/03/2022 | 1 (08/03/2020) | Details CEM-3701 Report |