Projects
To search for a project, enter filter criteria in the appropriate input field below. If a project is not listed, please contact a METS Representative for assistance.Displaying 12111-12120 of 18772 results.
| Project ID | Project Identifiers | DIST-CO-RTE-PM | Work Description | Location Description | Caltrans Closeout Date | METS Service Level | Actions |
|---|---|---|---|---|---|---|---|
| 212919 | Project ID: 212919 Permit Numbers: 0715NSN1269 | 07--- | 06/17/2021 | 1 (06/17/2021) | Details CEM-3701 Report | ||
| 212920 | Project ID: 212920 Permit Numbers: 10176MC0280 10186DP0026 10186RW0115 | 10---26.7/26.8 | Install new curb, gutter, sidewalk, a commercial driveway approach, and pavement widening along the southwest corner of Pelandale/Claratina/State Route 108 intersection in the City of Modesto. Other works includes a new pedestrian island, traffic signal modification, and a new horizontal drain. All | SR 108, Modesto | 01/22/2020 | 1 (11/28/2017) | Details CEM-3701 Report |
| 212921 | Project ID: 212921 DEA: 071XF904 | 07-VEN-1-1 | Remove the existing drainage pipe, construct 24" CSP pipe from the drainage inlet to the junction box, repair the sinkhole and fence | 06/17/2021 | 1 (04/04/2018) | Details CEM-3701 Report | |
| 212922 | Project ID: 212922 EFIS: 0415000339 Permit Numbers: 0417NOP1834 04176DP2017 04176DP2005 | 04-SM-82-6/6.8 | the Project improvements within Caltrans right-of-way include enhancing pedestrian facilities by widening existing sidewalks, utility adjustments, improving lighting, modifying drainage, installing crosswalk, and reconstructing curb ramps at Holly St., San Carlos Ave., and Cherry St... | El Camino Real, San Carlos | 01/22/2020 | 1 (05/30/2018) | Details CEM-3701 Report |
| 212923 | Project ID: 212923 Permit Numbers: 1016NMC0531 1017NRT0598 | 10---18.6 | Install and maintain in perpetuity the Emergency Vehicle Preemption System at the intersection of Filbert Street and the on/off ramps of State Route 4 in Stockton, as shown on the approved plans. The preemption system will include the installation of Optical detectors on the traffic signal poles, | SR 4, Stockton | 01/22/2020 | 1 (12/05/2017) | Details CEM-3701 Report |
| 212926 | Project ID: 212926 MINOR: 10A1935 | 10-SJ-99-8.0/8.6 12.0/13.0 | Replace Right of Way Fence | 07/28/2021 | 1 (12/04/2017) | Details CEM-3701 Report | |
| 212927 | Project ID: 212927 Permit Numbers: 0716NCS2320 07176DP1688 0717NRW1961 | 07-LA-138-47.4/47.4 | Reconstruction of ADA curb ramps at the four corners of the intersection. AC pavement surface modifications to match existing grades to new construction. Sidewalk construction and wall along the back of sidewalk with pedestrian railing. Drainage headwall removal. Drainage headwall construction and | Palmdale Blvd at 35th Street East, Plamdale | 06/16/2021 | 1 (11/07/2017) | Details CEM-3701 Report |
| 212929 | Project ID: 212929 DEA: 073P8804 EFIS: 0714000144 MINOR: 07A4289 | 07-VEN-5702-4.4 | For Construction on State Highway In Ventura County at Big Sycamore Maintenance Station | Big Sycamore Maintenance Station | 1 (11/29/2017) | Details CEM-3701 Report | |
| 212930 | Project ID: 212930 DEA: 051H3804 EFIS: 0516000067 | 05-MON-68-R4.0/10.8 | PLACE RUBBERIZED HOT MIX ASPHALT, BONDED WEARING COURSE. | MONTEREY COUNTY IN AND NEAR MONTEREY FROM ROUTE 1/68 SEPARATION TO 0.1 MILE WEST OF SPCA ROAD | 03/26/2020 | 1 (09/06/2019) | Details CEM-3701 Report |
| 212931 | Project ID: 212931 DEA: 060V2104 EFIS: 0617000168 | 06-FRE-63,180-2.0/4.0,42.1/43.1 | COLD PLANE ASPHALT CONCRETE AND PLACE HOT MIX ASPHALT | FRESNO COUNTY NEAR ORANGE COVE ON ROUTE 63 FROM 0.5 MILE SOUTH OF AMERICAN AVENUE TO 1.5 MILES NORTH OF AMERICAN AVENUE AND IN AND NEAR KERMAN ON ROUTE 180 FROM DEL NORTE AVENUE TO VINELAND AVENUE | 06/26/2019 | 1 (01/09/2019) | Details CEM-3701 Report |
