Projects
To search for a project, enter filter criteria in the appropriate input field below. If a project is not listed, please contact a METS Representative for assistance.Displaying 12081-12090 of 17351 results.
Project ID | Project Identifiers | DIST-CO-RTE-PM | Work Description | Location Description | Caltrans Closeout Date | METS Service Level | Actions |
---|---|---|---|---|---|---|---|
209726 | Project ID: 209726 DEA: 010C9004 EFIS: 0113000077 | 01-MEN-101-50.7/51.2 | SUPERELEVATION CORRECTION, OPEN GRADE AC OVERLAY, MBGR, STRIPING | MENDOCINO COUNTY NEAR WILLITS FROM OUTLET CREEK BRIDGE TO 0.5 MILE SOUTH OF RYAN CREEK ROAD | 02/23/2016 | 1 (08/07/2014) | Details CEM-3701 Report |
211613 | Project ID: 211613 DEA: 010B5204 EFIS: 0112000135 | 01-MEN-128-39.5 | ROADWAY EXCAVATION, CIDH PILES, & TRAFFIC CONTROL TO STABILIZE ROAD. | MENDOCINO COUNTY NEAR YORKVILLE AT 0.7 MILE EAST OF BEEBE CREEK BRIDGE | 08/27/2018 | 1 (09/27/2016) | Details CEM-3701 Report |
53 | Project ID: 53 DEA: 013637U4 EFIS: 0100021275 | 01-MEN-128-31.0/50.9 | RUBBERIZED HMA OVERLAY | MENDOCINO COUNTY NEAR YORKVILLE FROM 0.3 MILE EAST OF ROBINSON CREEK BRIDGE TO THE SONOMA COUNTY LINE | 12/27/2012 | 1 (10/13/2011) | Details CEM-3701 Report |
213992 | Project ID: 213992 DEA: 010H6304 EFIS: 0117000243 | 01-MEN-1,128-VAR | PLACE POLYESTER CONCRETE OVERLAY. | MENDOCINO COUNTY ON ROUTE 1 AND ON ROUTE 128 AT VARIOUS LOCATIONS | 11/19/2020 | 1 (03/27/2019) | Details CEM-3701 Report |
293 | Project ID: 293 DEA: 01486204 | 01-MEN-101-Var | Clean and Paint Bridges | MENDOCINO COUNTY ON ROUTE 101 AT VARIOUS LOCATIONS | 12/10/2012 | NOT VERIFIED | Details CEM-3701 Report |
212573 | Project ID: 212573 DEA: 010B5504 EFIS: 0112000137 | 01-MEN-162-16.2 | RECONSTRUCT ROADWAY, CONSTRUCT SOLDIER PILE AND TIEBACK WALL | MENDOCINO COUNTY ON ROUTE 162 1 MILE EAST OF MIDDLE FORK EEL RIVER BRIDGE | 10/05/2020 | 1 (10/03/2017) | Details CEM-3701 Report |
212940 | Project ID: 212940 Permit Numbers: 04176DP2479 0417NSN1238 | 04-SM-114-5.7-5.8 | The proposed improvements within Caltrans right-of-way include median modifications, traffic signal modifications and signing and striping improvements. These proposed improvements are intended to address immediate safety issues presented by the recent hi | Menlo Park | 11/30/00-1 | 1 (12/05/2017) | Details CEM-3701 Report |
209781 | Project ID: 209781 DEA: 041J6104 EFIS: 0414000296 Permit Numbers: 0414NMC2129 | 04-SM-84- | Facebook has obtained Menlo Park's permission to build a second campus west of Bayfront Expressway, near its headquarters on the other side of the road. Various improvements are required on Hwy. 84 including signal and lighting modifications. | Menlo Park on Hwy. 84. | 1 (10/29/2014) | Details CEM-3701 Report | |
5731 | Project ID: 5731 DEA: 100Q5504 | 10-MER,MPA-140,152-VAR | REPLACE STORM DRAINAGE SYSTEMS | Merced | 11/23/2009 | 1 (12/07/2009) | Details CEM-3701 Report |
993485 | Project ID: 993485 DEA: 101J7504 EFIS: 1019000023 | 10-MER,MPA-5,140,152,165-Var | FURNISH AND PLACE POLYESTER CONCRETE OVERLAY ON BRIDGE. | MERCED AND MARIPOSA COUNTIES AT VARIOUS LOCATIONS | 07/27/2023 | 1 (01/03/2022) | Details CEM-3701 Report |