Projects
To search for a project, enter filter criteria in the appropriate input field below. If a project is not listed, please contact a METS Representative for assistance.Displaying 12061-12070 of 19506 results.
| Project ID | Project Identifiers | DIST-CO-RTE-PM | Work Description | Location Description | Caltrans Closeout Date | METS Service Level | Actions |
|---|---|---|---|---|---|---|---|
| 7607 | Project ID: 7607 DEA: 100V3704 EFIS: 1000020035 MINOR: 10A1438 | 10-CAL-4,108,120-VAR | INSTALL RADIO COMMUNICATION ON ROUTE 4, 108, 120 | IN CALAVERAS AND TUOLUMNE COUNTIES AT VARIOUS LOCATIONS | 12/05/2019 | 1 (01/06/2014) | Details CEM-3701 Report |
| 7606 | Project ID: 7606 DEA: 08448114 EFIS: 0800020451 | 08-SBD-10-25.3/26.3 | I-10/Tippecanoe Interchange Improvements-Phase 1. | In the cities of Loma Linda and San Bernardino, from 1 mile west of Tippecanoe Avenue to Tippecanoe Avenue. Construct eastbound auxiliary lane, eastbound off ramp, retaining walls, reinforced concrete box culvert, and widen San Timoteo Bridge. | 08/25/2021 | 2 (02/14/2013) | Details CEM-3701 Report |
| 7602 | Project ID: 7602 EFIS: 0000001155 Permit Numbers: 04126DP1054 | 04-MRN-1-0/0.39 | Per the submitted project drawings, construct a three-way Traffic install traffic signal, pedestrian crosswalk and associated pedestrian facilities on State Highway 04-Mrn-1, Post Mile 0.39, in the County of Marin. | SHORELINE HWY, MILL VALLEY | 09/14/2018 | NOT VERIFIED | Details CEM-3701 Report |
| 7601 | Project ID: 7601 DEA: 024F6404 EFIS: 0212000172 | 02-SIS-96-27.7 | REMOVE DEBRIS | ABOUT 13 MILES WEST OF HAPPY CAMP AT 0.8 MILE WEST OF INDEPENDENCE | 11/07/2012 | 1 (09/10/2012) | Details CEM-3701 Report |
| 7599 | Project ID: 7599 EFIS: 0700021206 MINOR: 07A3212 | 07-LA-210-23.3 | INSTALL ADDITIONAL SAFETY LIGHTING, SIGNING & UPGRADE ADA RAMPS ON BURBANK BLVD | AT THE SB ROUTE 101 FREEWAY IN THE CITY OF LOS ANGELES | 1 (12/11/2012) | Details CEM-3701 Report | |
| 7598 | Project ID: 7598 DEA: 042332C4 EFIS: 0400000668 COOP: 042346 Permit Numbers: 0412NDP1301 0412NMC0521 0412NRD1458 0412NRD0731 | 04-ALA-262-0/0.5 | Phase 1B of the 1-880/mission Boulevard improvements includes:The demolition of two single-track freight rail bridges; | Warm Springs Blvd, Fremont | 06/03/2015 | 1 (12/12/2012) | Details CEM-3701 Report |
| 7597 | Project ID: 7597 EFIS: 0000001155 Permit Numbers: 07126DP1325 | 07-LA-710-24.316/24.316 | Double Permit to Permit No. 708-NSN-2285Install new Traffic Signal, install conduits, pull boxes, traffic signal standards with necessary foundations. Model 2070 Controller & Type IIIBF Service Cabinet to be furnished by Caltrans. | Ford Blvd. N/B off ramp, Los Angeles | 07/31/2018 | 1 (12/12/2012) | Details CEM-3701 Report |
| 7596 | Project ID: 7596 DEA: 100S9404 EFIS: 1000000268 | 10-MER-152-R6.0/R10.1 | INSTALL DOUBLE THRIE BEAM BARRIER. | MERCED COUNTY ABOUT 10 MILES WEST OF LOS BANOS FROM SAN LUIS DAM SERVICE ROAD TO SAN LUIS FOREBAY BRIDGE | 08/30/2013 | 1 (09/17/2012) | Details CEM-3701 Report |
| 7595 | Project ID: 7595 DEA: 080C1214 EFIS: 0800000037 | 08-SBD-395-19.0/35.6 | WIDEN MEDIAN And SHOULDERS, INSTALL MEDIAN and SHOULDER RUMBLE STRIPS. | SAN BERNARDINO COUNTY FROM 7.9 MILES NORTH OF STATE ROUTE 18 TO 10.4 MILES SOUTH OF STATE ROUTE 58 | 01/29/2015 | 1 (09/24/2012) | Details CEM-3701 Report |
| 7594 | Project ID: 7594 DEA: 073X3204 EFIS: 0700021170 | 07-LA-10-42.8 | CONSTRUCT DEBRIS BARRIER SYSTEM. | LOS ANGELES COUNTY IN POMONA AND SAN DIMAS AT ROUTE 10/57 SEPARATION | 07/31/2018 | 1 (08/20/2012) | Details CEM-3701 Report |
