Projects
To search for a project, enter filter criteria in the appropriate input field below. If a project is not listed, please contact a METS Representative for assistance.Displaying 11981-11990 of 18772 results.
| Project ID | Project Identifiers | DIST-CO-RTE-PM | Work Description | Location Description | Caltrans Closeout Date | METS Service Level | Actions |
|---|---|---|---|---|---|---|---|
| 5580 | Project ID: 5580 DEA: 100J1504 | 10-TUO-49-37.5/38.1 | Realign Roadway And Widen Shoulders. | 04/08/2011 | 1 (07/21/2009) | Details CEM-3701 Report | |
| 214518 | Project ID: 214518 DEA: 034F3704 EFIS: 0314000152 | 03-NEV-174-2.7/4.6 | REALIGN ROADWAY CURVES. | NEVADA COUNTY NEAR PEARDALE FROM MAPLE WAY TO YOU BET ROAD | 01/19/2023 | 1 (11/22/2019) | Details CEM-3701 Report |
| 449 | Project ID: 449 DEA: 021E1104 | 02-SHA-5-R28.9/R29.3 | REALIGN ROADWAY WITH HMA CONSTRUCT | 03/11/2011 | 1 (12/09/2009) | Details CEM-3701 Report | |
| 208920 | Project ID: 208920 DEA: 080K3104 EFIS: 0800000340 | 08-SBD-95-51.2/51.7 | REALIGN ROADWAY WITH HMA OVER AGGREGATE BASE. | SAN BERNARDINO COUNTY FROM 13.9 MILES NORTH OF HAVASU LAKE ROAD TO 5.5 MILES SOUTH OF ROUTE 40/95 SEPARATION | 02/27/2015 | 1 (10/08/2013) | Details CEM-3701 Report |
| 993382 | Project ID: 993382 DEA: 031H2404 EFIS: 0316000077 | 03-PLA-49-2.2/2.4 | REALIGN ROADWAY, CONSTRUCT ROUNDABOUT AND RELOCATE SEWER LINES. | PLACER COUNTY IN AUBURN FROM 0.1 MILE SOUTH OF THE INTERSECTION OF ROUTE 49 AND LINCOLN WAY / BORLAND AVENUE TO LINCOLN WAY | 1 (11/08/2021) | Details CEM-3701 Report | |
| 214874 | Project ID: 214874 DEA: 022H0504 EFIS: 0216000093 | 02-TRI-36-R34.8/R35.4 | REALIGN ROADWAY, DRAINAGE, GUARDRAIL, AND EROSION CONTROL. | TRINITY COUNTY ABOUT 15 MILES WEST OF PLATINA FROM 3.6 MILES TO 2.9 MILES WEST OF HAYFORK CREEK BRIDGE. | 09/27/2021 | 1 (05/26/2020) | Details CEM-3701 Report |
| 213573 | Project ID: 213573 DEA: 11416604 EFIS: 1113000090 | 11-SD-94-29.4/29.7 | REALIGN ROADWAY, HMA PAVING, HFST, DRAINAGE WORK | SAN DIEGO COUNTY NEAR DULZURA FROM 0.3 MILE EAST OF GRANDE CREEK BRIDGE TO 0.1 MILE WEST OF MARRON VALLEY ROAD | 08/24/2021 | 1 (03/01/2019) | Details CEM-3701 Report |
| 211 | Project ID: 211 DEA: 01474804 EFIS: 0100000330 | 01-MEN-1-38.5/38.9 | REALIGN ROADWAY, PLACE HMA OVER AB AND INSTALL DRAINAGE SYSTEMS. | MENDOCINO COUNTY NEAR ELK FROM 1.7 MILES TO 1.4 MILES SOUTH OF NAVARRO RIVER BRIDGE | 09/28/2012 | 1 (10/27/2011) | Details CEM-3701 Report |
| 7613 | Project ID: 7613 DEA: 071218W4 EFIS: 0700021119 | 07-LA-5-29.4/31.6 | REALIGN ROUTE 5 AND RAILROAD TRACKS AND RECONFIGURE ON- AND OFF-RAMPS. | LOS ANGELES COUNTY IN BURBANK FROM WEST MAGNOLIA BOULEVARD OVERCROSSING TO 0.3 MILE NORTH OF BUENA VISTA STREET/WINONA AVENUE UNDERCROSSING | 07/31/2023 | 1 (10/08/2012) | Details CEM-3701 Report |
| 211070 | Project ID: 211070 DEA: 080Q3004 EFIS: 0800020191 | 08-SBD-138-R17.1/R19.2 | REALIGN SECTION OF STATE ROUTE 138 | Near Hesperia from 1.9 mi East of Route 15 to 0.1 mi West of Summit Post Office Road to realign sections of State Route 138 | 09/28/2020 | 1 (04/27/2016) | Details CEM-3701 Report |
