Projects
To search for a project, enter filter criteria in the appropriate input field below. If a project is not listed, please contact a METS Representative for assistance.Displaying 11961-11970 of 18772 results.
| Project ID | Project Identifiers | DIST-CO-RTE-PM | Work Description | Location Description | Caltrans Closeout Date | METS Service Level | Actions |
|---|---|---|---|---|---|---|---|
| 6935 | Project ID: 6935 DEA: 060L2204 EFIS: 0600000295 | 06-KER-5-69.6/73.1 | INSTALL SINGLE AND DOUBLE THRIE-BEAM MEDIAN BARRIER AND RUMBLE STRIP. | KERN COUNTY NEAR LOST HILLS FROM MAIN DRAIN ROAD OVERCROSSING TO ROUTE 46/5 SEPARATION | 06/15/2012 | 1 (03/15/2012) | Details CEM-3701 Report |
| 6934 | Project ID: 6934 DEA: 060J5204 EFIS: 0600000187 | 06-KER-119-4.7/8.5 | SHOULDER WIDENING AND HMA OVERLAY. | KERN COUNTY NEAR TAFT FROM 0.2 MILE WEST OF AIRPORT ROAD TO 0.3 MILE WEST OF LAKEVIEW WASH BRIDGE | 05/03/2013 | 1 (09/12/2012) | Details CEM-3701 Report |
| 6933 | Project ID: 6933 DEA: 01498704 EFIS: 0100000696 | 01-DN-101-15.4/20.5 | BONDED WEARING COURSE AND REPLACE ASPHALT CONCRETE SURFACING | DEL NORTE COUNTY NEAR CRESCENT CITY FROM 2.9 MILES NORTH OF WILSON CREEK ROAD TO 0.2 MILES NORTH OF MILL CREEK PARK ENTRANCE | 09/14/2012 | 1 (06/27/2012) | Details CEM-3701 Report |
| 6932 | Project ID: 6932 DEA: 120A9704 EFIS: 1200000068 Permit Numbers: 1210NMC0857 | 12-ORA-73-24.8/24.8 | construct improvements to Jamboree Road and the Jamboree Road bridge over SR-73 between Bayview Way and MacArthur Boulevard in Newport Beach. The proposed improvements will include an additional travel lane in each direction and the widening of the bridge | jamboree road, Newport beach | 03/31/2013 | NOT VERIFIED | Details CEM-3701 Report |
| 6931 | Project ID: 6931 DEA: 042L1904 EFIS: 0400000858 MINOR: 04A3687 | 04-MRN-131-2.1 | Install Flashing Beacon and In Roadway Warning Lights | In Tiburon At Stewart Dr. | 01/13/2025 | 1 (11/08/2019) | Details CEM-3701 Report |
| 6930 | Project ID: 6930 EFIS: 0000001155 Permit Numbers: 0511NRT0476 | 05-MON-68-13.1/13.6 | Construct Dual Left Turn Lanes on WB Highway 68 under Cooperative Agreement # 05-0201, E.A. # 05-0H8221 | State Route 68, Salinas | 09/18/2018 | NOT VERIFIED | Details CEM-3701 Report |
| 6929 | Project ID: 6929 EFIS: 0000001155 Permit Numbers: 0510NMC0443 | 05-MON-68-13.1/13.6 | Construct Dual Left Turn Lanes on WB Highway 68 under Cooperative Agreement # 05-0201, E.A. # 05-0H8221 | State Route 68, Salinas | 09/17/2018 | NOT VERIFIED | Details CEM-3701 Report |
| 6928 | Project ID: 6928 DEA: 041637U3 EFIS: 0400020166 | 04-SF-101-8.2/9.8, 6.9/7.1 | P3 project, Doyle Drive Phase 2, Remaining elements of Presidio Parkway, including NB Presidio Viaduct and Battery Tunnel, Main Post Tunnels, and new Girard Road Interchange w/direct connection to the Presidio. | San Francisco Presidio, Southern approach to Golden Gate Bridge | 07/12/2019 | 2 (02/07/2013) | Details CEM-3701 Report |
| 6926 | Project ID: 6926 EFIS: 0800000140 Permit Numbers: 0811NMC0823 | 08-RIV-15-13/14.3 | Enter onto Interstate 15 right-of-way at Clinton Keith Road Interchange in Wildomar area, to reconstruct the interchange including but not limited to re-align the freeway ramps, widen the overcrossing bridge, construct retaining walls, landscape and signal | Interstate 15, Wildomar | 09/13/2014 | 1 (03/12/2012) | Details CEM-3701 Report |
| 6925 | Project ID: 6925 DEA: 040A8503 EFIS: 0400000172 COOP: 41972A2 | 04-ALA-880,61-25.3/25.7,16.1,16.5 | BART Oakland Airport Connector (Caltrans IQA- No inspection) | In Oakland | 03/03/2015 | 2 (01/01/2014) | Details CEM-3701 Report |
