Projects

To search for a project, enter filter criteria in the appropriate input field below. If a project is not listed, please contact a METS Representative for assistance.
Displaying 11951-11960 of 18772 results.
Project IDProject IdentifiersDIST-CO-RTE-PMWork DescriptionLocation DescriptionCaltrans Closeout DateMETS Service LevelActions
     
211837Project ID: 211837
DEA: 033F7604
EFIS: 0313000165
03-BUT-191-6.8/8.6REALIGN CURVES, WIDEN SHOULDERSBUTTE COUNTY NEAR PARADISE FROM 1.9 MILES NORTH OF CLEAR CREEK BRIDGE TO AIRPORT ROAD02/06/20191 (10/20/2016)Details CEM-3701 Report
210225Project ID: 210225
Permit Numbers: 0713NRP2032
07-VEN-118-10.8/10.9Realign Donlon Road to connect with the existing intersection of SR-118/SR-34 to form a 4-way intersection.DP is 715-6DP-1118 Toro Enterprises,Inc. with bonds 2x$82= $ 164 132x$82= $10,824 Materials$13,000 (State furnished-2070 controller assembly)Donlon Road, Somis08/03/20181 (07/14/2015)Details CEM-3701 Report
209870Project ID: 209870
DEA: 050T6404
EFIS: 0500020030
05-SBT-25-18.8/19.5REALIGN EXISTING ASPHALT CONCRETE PAVEMENT.SAN BENITO COUNTY ABOUT 32 MILES SOUTH OF HOLLISTER FROM 0.8 MILE NORTH OF SAN BENITO LATERAL TO 2 MILES SOUTH OF ROUTE 14608/13/20181 (12/22/2014)Details CEM-3701 Report
5913Project ID: 5913
DEA: 10499004
10-SJ-26-26REALIGN EXISTING CURVEIN SAN JOAQUIN COUNTY NEAR BELLOTAFROM CALAVERAS RIVER BRIDGE TO1.5 KM WEST OF DUCK CREEK BRIDGE04/08/20111 (06/16/2006)Details CEM-3701 Report
210397Project ID: 210397
DEA: 074T7304
EFIS: 0714000211
07-LA-405-41.7REALIGN EXISTING SOUND WALL AT RAMP TERMINUS.LOS ANGELES AT SOUTHBOUND ROUTE 405 TO VICTORY BOULEVARD OFF-RAMP07/05/20171 (10/15/2015)Details CEM-3701 Report
3779Project ID: 3779
DEA: 071199U4
07-LA-101-.4REALIGN FREEWAY AND RAMPSIN LOS ANGELES COUNTY INLOS ANGELES FROM 0.1 KM WEST OF CENTER STREET UNDERCROSSING TOALAMEDA STREET OVERCROSSING08/05/20101 (08/22/2010)Details CEM-3701 Report
5884Project ID: 5884
DEA: 10340424
EFIS: 1000000394
10-TUO-108-R4.0/R6.0REALIGN HIGHWAY AND CONSTRUCT UNDERCROSSINGS.TUOLUMNE COUNTY NEAR SONORA FROM 0.3 MILE WEST OF PEACEFUL OAK ROAD TO VIA ESTE ROAD04/18/20181 (02/23/2012)Details CEM-3701 Report
3410Project ID: 3410
DEA: 063829U4
06-KER-41-79.9/81.0,0.0/8.0,0.0/6.8REALIGN HIGHWAY AND REPLACE BRIDGEIN SAN LUIS OBISPO, KERN AND KING COUNTIES AT VARIOUS LOCATIONS04/21/20111 (04/17/2008)Details CEM-3701 Report
592Project ID: 592
DEA: 023705U4
02-SHA-299-50.7REALIGN HIGHWAY- FOUNTAIN CURVE CORRECTIONIN SHASTA COUNTY NEAR ROUND MOUNTAIN FROM 2.8 KM WEST TO 0.9 KM WEST OF BUZZARD ROOST ROAD12/23/20101 (07/03/2007)Details CEM-3701 Report
2989Project ID: 2989
DEA: 05496804
05-SCr-129-12.7/13.2REALIGN HORIZONTAL CURVE AND CONSTRUCT SOLDIER PILE RETAINING WALL 04/20/20111 (04/20/2011)Details CEM-3701 Report