Projects
To search for a project, enter filter criteria in the appropriate input field below. If a project is not listed, please contact a METS Representative for assistance.Displaying 11951-11960 of 18994 results.
| Project ID | Project Identifiers | DIST-CO-RTE-PM | Work Description | Location Description | Caltrans Closeout Date | METS Service Level | Actions |
|---|---|---|---|---|---|---|---|
| 213596 | Project ID: 213596 DEA: 051C8904 EFIS: 0513000009 | 05-MON-101-87.3/R91.5 | PRECAST CONC PVMT, CRACK AND SEAT PAVEMENT AND RECONSTRUCT RAMPS. | MONTEREY COUNTY IN SALINAS FROM EAST MARKET STREET UNDERCROSSING TO 0.3 MILE SOUTH OF ESPINOSA ROAD | 08/23/2023 | 1 (01/04/2019) | Details CEM-3701 Report |
| 993825 | Project ID: 993825 DEA: 040Q30U4 EFIS: 0420000235 COOP: 042830A3,042830A4 | 04-ALA,CC-680-R11.0/R21.9,R0.0/R0.9 | PRECAST CONC PVMT, ELECTRONIC TOLL SYSTEM, JPCP, CB & STRUCTURAL CONC | ALAMEDA AND CONTRA COSTA COUNTIES AT SUNOL AND IN SAN RAMON BETWEEN 0.4 MILE SOUTH OF CALAVERAS ROAD UNDERCROSSING TO 0.9 MILE NORTH OF ALCOSTA BOULEVARD OVERCROSSING | 1 (05/11/2022) | Details CEM-3701 Report | |
| 214985 | Project ID: 214985 DEA: 04269804 EFIS: 0412000159 | 04-CC-242-R0.0/R1.6 | PRECAST JOINTED CONC PVMT, INDIVIDUAL SLAB REPLACEMENT, HMA & RHMA. | CONTRA COSTA COUNTY IN CONCORD FROM ROUTE 242/680 SEPARATION TO BUCHANAN FIELD VIADUCT | 12/08/2022 | 1 (10/19/2020) | Details CEM-3701 Report |
| 993301 | Project ID: 993301 DEA: 060U2804 EFIS: 0615000293 | 06-TUL-245-1.4,4.2 | PRECAST PRESTRESSED CONCRETE BOX GIRDER AND SLAB, BRIDGE REMOVAL. | TULARE COUNTY NEAR WOODLAKE AT YOKOHL CREEK BRIDGE AND AT KAWEAH RIVER BRIDGE | 05/09/2025 | 1 (10/11/2021) | Details CEM-3701 Report |
| 211001 | Project ID: 211001 DEA: 031F2604 EFIS: 0312000004 | 03-SIE-89-0.6/1.8 | PRECAST REINFORCED CONCRETE BOX CULVERT, FENCE | IN SIERRA COUNTY NEAR SIERRAVILLE FROM 0.8 MILE NORTH OF NEVADACOUNTY LINE TO 1.4 MILES NORTH OF NEVADA COUNTY LINE | 10/28/2016 | 1 (01/20/2016) | Details CEM-3701 Report |
| 214157 | Project ID: 214157 DEA: 081H3404 EFIS: 0817000016 | 08-SBD-210,215-21.1/R26.3,4.1/14.3 | PRECAST SLAB AND CURB RAMP REPLACEMENT AND PLACE RHMA-G. | SAN BERNARDINO COUNTY ON ROUTE 210 FROM 0.6 MILE EAST OF STATE STREET TO STERLING AVENUE AND ON ROUTE 215 FROM PALM STREET TO ROUTE 10/215 SEPARATION | 09/02/2020 | 1 (11/04/2019) | Details CEM-3701 Report |
| 993637 | Project ID: 993637 DEA: 010L2504 EFIS: 0121000090 | 01-HUM-96-26.0/R37.3 | PRECOATED AGGREGATE, REPLACE AC SURFACING, AND ASPHALT-RUBBER BINDER. | HUMBOLDT COUNTY NEAR ORLEANS FROM 1.6 MILES WEST OF BLUFF CREEK ROAD TO CAMP CREEK BRIDGE | 10/04/2022 | 1 (03/21/2022) | Details CEM-3701 Report |
| 1000343 | Project ID: 1000343 DEA: 061E7304 EFIS: 0622000093 | 06-FRE-41-R25.3 | PREFABRICATED BUILDING, WROUGHT IRON FENCE AND GATE. | FRESNO COUNTY IN FRESNO AT MCKINLEY AVENUE | 1 (05/29/2024) | Details CEM-3701 Report | |
| 1217 | Project ID: 1217 DEA: 033M5004 | 03-SIE-49-16.7 | PREP AND PAINT BRIDGE | Sierra County in Downieville at Downie River Bridge. | 12/28/2009 | 1 (12/28/2009) | Details CEM-3701 Report |
| 6958 | Project ID: 6958 DEA: 034M2304 EFIS: 0300020064 | 03-ED-50-15.4 | PREP AND PAINT TWO BRIDGES | EL DORADO COUNTY NEAR PLACERVILLE AT WEBER CREEK BRIDGE | 10/08/2014 | 1 (05/21/2012) | Details CEM-3701 Report |
