Projects
To search for a project, enter filter criteria in the appropriate input field below. If a project is not listed, please contact a METS Representative for assistance.Displaying 11831-11840 of 17398 results.
Project ID | Project Identifiers | DIST-CO-RTE-PM | Work Description | Location Description | Caltrans Closeout Date | METS Service Level | Actions |
---|---|---|---|---|---|---|---|
7273 | Project ID: 7273 EFIS: 0000001155 Permit Numbers: 08126RT0181 | 08-RIV-79-18.47/18.472 | Enter onto State Route 79 right-of-way at Stetson Avenue, in Winchester area, Riverside County, to perform roadway improvements including pavement widening, AC overlay, sidewalk, curb gutter, street lights, pedestrian access ramps, traffic signal. | State Route 79 (Winchester Road), Winchester | 01/07/2007 | 1 (01/07/2007) | Details CEM-3701 Report |
208633 | Project ID: 208633 Permit Numbers: 0811NRW1041 0811NMC0027 0811NUM0028 08126DP0175 0811NRW1042 0812NRT1145 0812NRT1144 08126RT1146 | 08-RIV-79-13.8/13.8 | Enter onto State Route 79 right-of-way at Craig Road to extend the existing 16\" diameter steel casing and the 10\" diameter water pipeline beyond the State\'s Right-of-Way using open trench method as per plans date stamped February 15, 2011 by the Depart | State Route 79, County | 06/11/2013 | 1 (02/26/2013) | Details CEM-3701 Report |
5196 | Project ID: 5196 DEA: 08464614 EFIS: 0800001041 Permit Numbers: 0811NMC0714 0812NDP0176 0812NRT1148 | 08-RIV--12.2/15.8 | Enter onto State Route 79 (Winchester Road) right-of-way between Scott Road and Domenigoni Parkway, near Murrieta area, to widen one side of the State highway from two to four lanes, including but not limited to drainage, erosion control, signal & lig | State Route 79 (Winchester Road), Murrieta area | 1 (05/17/2012) | Details CEM-3701 Report | |
4791 | Project ID: 4791 EFIS: 0000001155 Permit Numbers: 0809NMC0225 | 08-RIV-79-7.6/8 | Enter onto State Route 79 (Winchester Road) right-of-way at Clinton Keith Road/Benton Road, in the City of Murrieta, to widen the southbound State highway and to add the fourth leg of the street intersection (Clinton Keith Road) which include but not limit | State Route 79 (Winchester Road), Murrieta | 08/30/2012 | 2 (08/30/2012) | Details CEM-3701 Report |
5195 | Project ID: 5195 DEA: 080K4004 EFIS: 0800000345 Permit Numbers: 0811NMC0640 0811NMC0640 | 08-RIV-79-7.63/8.44 | Enter onto State Route 79 (Winchester Road) at and near Thompson Road, in the City of Murrieta, to widen the State highway including but not limited to the construction of a new AC pavement, curb & gutter, sidewalk, handicapped ramps, storm drain pipes, landscape, street lights, and traffic sig | State Route 79 (Winchester Road), Murrieta | 07/31/2018 | NOT VERIFIED | Details CEM-3701 Report |
993680 | Project ID: 993680 Permit Numbers: 08206CD0328 08226DP0124 | 82---8.44 | Enter onto State Route 79 (SR-79) right-of-way at Thompson Road in the County of Riverside to modify traffic signals as per plans date stamped, December 21, 2021 by the Caltrans District 8 Encroachment Permits Office and/or to the satisfaction of the Caltrans Representative. All traffic control wor | NEC Winchester Road, French Valley | 1 (08/08/2022) | Details CEM-3701 Report | |
212629 | Project ID: 212629 Permit Numbers: 08166MC0489 08186RW0070 | 08-RIV-79-18.47/18.47 | Enter onto State Route 79 (SR-79) right-of-way at the intersection of Stetson Avenue in the County of Riverside to repave and widen highway with HMA overlay; install new landscape and irrigation, new signal and lighting, signage, pavement delineation, striping; construct new curb, gutters, sidewalk | Winchester Road & Stetson Avenue, Hemet | 06/23/2021 | 1 (03/20/2018) | Details CEM-3701 Report |
993142 | Project ID: 993142 Permit Numbers: 08196CD0860 08216RT0988 | 08---4.7/-1 | Enter onto State Route 79 (SR-79) right-of-way at Murrieta Hot Springs Road in the Cityof Murrieta to construct widened pavement, curb and gutter, sidewalk, curb ramp, installstreet light, restripe, modify signal, and install new landscaping/irrigation as per plansdate stamped, August 11, 2020 by t | Winchester Road, Murrieta | 1 (09/08/2021) | Details CEM-3701 Report | |
212637 | Project ID: 212637 Permit Numbers: 0816NMC0249 08186DP0174 0818NRT0215 08196RT0115 | 08--79-33.9/33.9 | Enter onto State Route 79 (SR-79) right-of-way at Gilman Springs Road northbound On/Off-ramp in the County of Riverside to construct new traffic signal, conduits, pull boxes, traffic loops, controller/service cabinets, pavement marking/striping, traffic signs, curb and gutter, guardrail, and ADA co | Gilman Springs Rd./SR-79 NB On/Off-Ramp, San Jacinto | 06/23/2021 | 1 (08/16/2017) | Details CEM-3701 Report |
213509 | Project ID: 213509 Permit Numbers: 08146CD0257 08176RT1221 08186RT0393 08186RT0883 08186RT1058 08196RT0044 | 08---40.1/40.1 | Enter onto State Route 79 (SR-79) right-of-way at First Street in the City of Beaumont to construct (1) new driveway access along SR-79/Beaumont Avenue, (1) new curb ramp, traffic signal modifications, and restripe traffic lanes, as per work plans date stamped, October 12, 2016 and Traffic Control | 118 S Beaumont Avenue, Beaumont | 06/23/2021 | 1 (02/11/2019) | Details CEM-3701 Report |