Projects
To search for a project, enter filter criteria in the appropriate input field below. If a project is not listed, please contact a METS Representative for assistance.Displaying 11831-11840 of 17340 results.
Project ID | Project Identifiers | DIST-CO-RTE-PM | Work Description | Location Description | Caltrans Closeout Date | METS Service Level | Actions |
---|---|---|---|---|---|---|---|
213228 | Project ID: 213228 DEA: 081E4204 EFIS: 0813000230 | 08-RIV-111-48.1 | Remove Masonry Fence | 08/25/2021 | 1 (04/02/2018) | Details CEM-3701 Report | |
1038 | Project ID: 1038 DEA: 032F2504 EFIS: 0300020581 | 03-PLA-80-34.6/34.9 | Remove material, install K rail, cut back slope | Near Colfax from 1.8 mile east of Rte 174/80 Separation to .2 mile west of Long Ravine Bridge | 03/31/2020 | 1 (12/28/2010) | Details CEM-3701 Report |
4850 | Project ID: 4850 DEA: 080E2004 MINOR: 08A1269 | 08-RIV-15-36.18-36.35 | REMOVE MBGR AND DIKE AND INSTALL NEW | 15 | 03/21/2006 | NOT VERIFIED | Details CEM-3701 Report |
1000155 | Project ID: 1000155 EFIS: 1123000107 MINOR: 11A3736 | 11-SD-5-R20.8/R21.3 | Remove MBGR and Place MGS | San Diego County in the City of San Diego on Route 5 at Southbound Off-Ramp to Sea World Drive. | 1 (03/13/2024) | Details CEM-3701 Report | |
6178 | Project ID: 6178 DEA: 11284304 | 11-SD-VAR-VAR | Remove Mbgr And Replace With Concrete Barrier And Crash Cushions. | 08/05/2010 | 1 (01/03/2011) | Details CEM-3701 Report | |
3702 | Project ID: 3702 DEA: 070P0004 | 07-LA-110-1.2 | REMOVE MEDIAN & MODIFY STRIPING | 07/19/2021 | 2 (07/06/2021) | Details CEM-3701 Report | |
211814 | Project ID: 211814 DEA: 031E7604 EFIS: 0300000273 | 03-YUB-20,70-0.5/0.9,14.3/14.4 | REMOVE MEDIAN LANES, ADD LEFT TURN LANES, CHANNELIZE, MODIFY SIGNALS | YUBA COUNTY IN MARYSVILLE ON ROUTE 20 FROM THE FEATHER RIVER BRIDGE AND OVERHEAD TO F STREET AND ON ROUTE 70 AT 4TH STREET TO 5TH STREET | 08/30/2018 | 1 (10/20/2016) | Details CEM-3701 Report |
212281 | Project ID: 212281 Permit Numbers: 11146MC0753 | 11--805-25.48 | remove median, construct left turn storage, grind and overlay | Route 5 and 805 at Nobel Drive I-5. PM 28.16 I-805 PM 25.48 | 08/07/2018 | 1 (03/28/2017) | Details CEM-3701 Report |
213852 | Project ID: 213852 DEA: 034F6004 EFIS: 0314000228 | 03-NEV-80-1.2/R9.4 | REMOVE METAL BEAM GUARD RAIL AND REPLACE WITH CONCRETE BARRIER | NEVADA COUNTY IN AND NEAR TRUCKEE AT VARIOUS LOCATIONS FROM 1.3 MILES WEST OF SODA SPRINGS OVERCROSSING TO 0.3 MILE EAST OF DONNER LAKE UNDERCROSSING | 05/26/2022 | 1 (01/08/2019) | Details CEM-3701 Report |
209102 | Project ID: 209102 DEA: 080N5104 EFIS: 0800001008 | 08-RIV,SBD-116,121-51.5/51.7,1.8/2.2 | REMOVE METAL BEAM GUARD RAILING AND PLACE CONCRETE BARRIER (TYPE 732B) | RIVERSIDE AND SAN BERNARDINO COUNTIES IN AND NEAR ONTARIO FROM 0.1 MILE SOUTH TO 0.1 MILE NORTH OF 15/60 SEPARATION AND FROM 0.6 MILE SOUTH TO 0.2 MILE SOUTH OF 15/10 SEPARATION | 08/29/2014 | 1 (04/15/2014) | Details CEM-3701 Report |