Projects
To search for a project, enter filter criteria in the appropriate input field below. If a project is not listed, please contact a METS Representative for assistance.Displaying 11791-11800 of 18772 results.
| Project ID | Project Identifiers | DIST-CO-RTE-PM | Work Description | Location Description | Caltrans Closeout Date | METS Service Level | Actions |
|---|---|---|---|---|---|---|---|
| 212583 | Project ID: 212583 DEA: 022H9304 EFIS: 0217000030 | 02-TEH-99-0.3/8.9 | REPLACE ASPHALT CONCRETE SURFACING WITH A PAVING FABRIC INTERLAYER | TEHAMA COUNTY NEAR LOS MOLINOS FROM 0.3 MILE NORTH OF BUTTE COUNTY LINE TO 0.2 MILE SOUTH OF CHAMPLIN SLOUGH | 04/03/2018 | 1 (01/02/2018) | Details CEM-3701 Report |
| 212574 | Project ID: 212574 DEA: 02368414 EFIS: 0215000066 | 02-SHA-44-R4.6/R6.4 | CONSTRUCT OVERCROSSING, WIDEN WITH HMA AND AB, AND OVERLAY WITH HMA | SHASTA COUNTY NEAR PALO CEDRO FROM CLOUGH CREEK BRIDGE TO 0.6 MILE WEST OF DESCHUTES ROAD UNDERCROSSING | 11/24/2021 | 1 (07/28/2017) | Details CEM-3701 Report |
| 212598 | Project ID: 212598 DEA: 044G4904 EFIS: 0412000491 | 04-NAP-29-11.9 | CONCRETE BARRIER, HMA PAVEMENT, DRAINAGE IMPROVEMENTS | NAPA COUNTY IN NAPA AT LINCOLN-SOLANO ON-RAMP | 08/01/2018 | 1 (10/18/2017) | Details CEM-3701 Report |
| 212575 | Project ID: 212575 DEA: 060G9804 EFIS: 0613000022 | 06-TUL-65-31.6/39.6 | REPAIR FAILED AREAS, COLD IN PLACE RECYCLING AND RESURFACE WITH RHMA. | TULARE COUNTY IN AND NEAR EXETER FROM ROUTE 137 TO ROUTE 198 | 06/19/2019 | 1 (04/24/2018) | Details CEM-3701 Report |
| 212576 | Project ID: 212576 DEA: 080R7804 EFIS: 0812000165 | 08-RIV-74-52.1/62.5,78.7/R92.0 | INSTALL MIDWEST GUARDRAIL SYSTEM (MGS) | RIVERSIDE COUNTY FROM 1.2 MILES WEST OF STRAWBERRY CREEK BRIDGE TO 0.2 MILE WEST OF APPLE CANYON ROAD AND FROM 0.7 MILE EAST OF RIBBONWOOD DRIVE TO 1.3 MILES WEST OF CAHUILLA WAY | 06/23/2021 | 1 (03/20/2018) | Details CEM-3701 Report |
| 212577 | Project ID: 212577 DEA: 11408704 EFIS: 1112000017 | 11-SD-8-9.0/15.3 | SLAB REPLACEMENT, COLD PLANE, GRIND PAVEMENT AND REPLACE GUARDRAIL. | SAN DIEGO COUNTY FROM 0.6 MILE WEST OF LAKE MURRAY BOULEVARD OVERCROSSING IN SAN DIEGO TO JOHNSON AVENUE UNDERCROSSING IN EL CAJON | 12/09/2019 | 1 (01/19/2018) | Details CEM-3701 Report |
| 212605 | Project ID: 212605 DEA: 120P0204 EFIS: 1215000023 | 12-ORA-1-24.3 | REPLACE CURB RAMPS, MODIFYING EXISTING ELECTRICAL SYSTEM | ORANGE COUNTY IN HUNTINGTON BEACH AT HUNTINGTON STREET | 01/02/2020 | 1 (01/09/2018) | Details CEM-3701 Report |
| 212584 | Project ID: 212584 DEA: 030G5104 EFIS: 0315000228 | 03-SAC,YOL-50,51,80,160-VAR | MAINTENANCE JOB - REPLACE BRIDGE JOINTS | SACRAMENTO AND YOLO COUNTIES AT VARIOUS LOCATIONS | 09/14/2021 | 1 (09/15/2017) | Details CEM-3701 Report |
| 212585 | Project ID: 212585 DEA: 060R1404 EFIS: 0614000038 | 06-KER-99-10.7/20.5 | CONSTRUCT CONTINUOUSLY REINFORCED CONCRETE PAVEMENT. | KERN COUNTY NEAR BAKERSFIELD FROM 1.4 MILES NORTH OF HERRING ROAD OVERCROSSING TO PACHECO ROAD UNDERCROSSING | 06/19/2019 | 1 (06/05/2018) | Details CEM-3701 Report |
| 212588 | Project ID: 212588 DEA: 081C1004 | 08-SBD-18-9.1/R17.8 | MILL, OVERLAY, UPGRADE DIKE AND GUARDRAIL ON STATE ROUTE 18 | SAN BERNARDINO COUNTY NEAR CRESTLINE FROM 0.1 MILE SOUTH OF ARROWHEAD SPRINGS ROAD TO ROUTE 18/138 SEPARATION | 06/23/2021 | 1 (12/31/2018) | Details CEM-3701 Report |
