Projects
To search for a project, enter filter criteria in the appropriate input field below. If a project is not listed, please contact a METS Representative for assistance.Displaying 11771-11780 of 18861 results.
| Project ID | Project Identifiers | DIST-CO-RTE-PM | Work Description | Location Description | Caltrans Closeout Date | METS Service Level | Actions |
|---|---|---|---|---|---|---|---|
| 4952 | Project ID: 4952 DEA: 080H9004 MINOR: 08A1653 | 08-RIV,SBD-15,60,91-VAR | MODIFY COMMUNICATION SYSTEMS AT VARIOUS LOCATIONS, IN RIVERSIDE AND SAN BERNARDINO COUNTIES ON ROUTE 15, 60 AND 91. | 15,60,91 | 05/21/2009 | NOT VERIFIED | Details CEM-3701 Report |
| 4953 | Project ID: 4953 DEA: 080H9004 MINOR: 08A1588 | 08-RIV,SBD-15,60,91-VAR | MODIFY COMMUNICATION SYSTEMS | 15,60,91 | 06/23/2009 | NOT VERIFIED | Details CEM-3701 Report |
| 4850 | Project ID: 4850 DEA: 080E2004 MINOR: 08A1269 | 08-RIV-15-36.18-36.35 | REMOVE MBGR AND DIKE AND INSTALL NEW | 15 | 03/21/2006 | NOT VERIFIED | Details CEM-3701 Report |
| 4869 | Project ID: 4869 DEA: 080F0004 MINOR: 08A1247 | 08-SBd-15-R48.55 | CONSTRUCT FOUR CURB RAMPS | 15 | 07/21/2005 | NOT VERIFIED | Details CEM-3701 Report |
| 4750 | Project ID: 4750 EFIS: 0000001155 Permit Numbers: 08086MC0676 08096US0860 0809NUM1060 | 08-SBD-18-97.946/97.946 | Enter onto State Route 18 (SR-18) right of way at El Evado Road to perform street improvement and utilities installation as per plans date stamped December 29, 2009 by Caltrans District 8, Encroachment Permits Office, and/or as directed by the Department R | 14426 Palmdale Road, Victorville | 12/22/2010 | NOT VERIFIED | Details CEM-3701 Report |
| 215479 | Project ID: 215479 DEA: 080R4204 EFIS: 0812000076 | 08-SBD-SR 210 AND I-15 IC-Null | FONTANA MAINTENANCE STATION | 14032 Victoria Street, Fontana, CA 92336 | 12/10/2024 | 1 (02/11/2021) | Details CEM-3701 Report |
| 213263 | Project ID: 213263 Permit Numbers: 0417NMC1239 04186DP0258 0418NRW1025 | 04-SM-82-1.077/1.077 | Relocation of signal pole, removal and replacement of existing driveways, sidewalk, curb and gutter along the project frontage and new fire hydrant at 1400 El Camino Real in Menlo Park... | 1400 El Camino Real, Menlo Park | 01/22/2020 | 1 (04/04/2018) | Details CEM-3701 Report |
| 5411 | Project ID: 5411 DEA: 09338704 MINOR: 09A0375 | 09-KER-14-26.24/26.91 | COLD MILL AND REPLACE ASPHALT CONCRETE | 14 | 06/01/2009 | NOT VERIFIED | Details CEM-3701 Report |
| 5412 | Project ID: 5412 DEA: 09338804 MINOR: 09A0376 | 09-KER-14-28.75/29.41 | COLD MILL AND REPLACE ASPHALT CONCRETE | 14 | 06/01/2009 | NOT VERIFIED | Details CEM-3701 Report |
| 209830 | Project ID: 209830 Permit Numbers: 07136CD2147 07146RW1793 | 07-LA-72-3.25/3.25 | Demo and remove roadway, drive approaches, curb & gutter, concrete sidewalk, storm drain. Construct 2 new driveway approaches, relocate street light and pull box, install traffic signal, domestic water service, electric service conduits and new gas service lateral.Applying for separate fire hyd | 13806 Whittier Blvd, Whittier | 07/31/2018 | 1 (08/27/2014) | Details CEM-3701 Report |
