Projects
To search for a project, enter filter criteria in the appropriate input field below. If a project is not listed, please contact a METS Representative for assistance.Displaying 11771-11780 of 18861 results.
| Project ID | Project Identifiers | DIST-CO-RTE-PM | Work Description | Location Description | Caltrans Closeout Date | METS Service Level | Actions |
|---|---|---|---|---|---|---|---|
| 208641 | Project ID: 208641 DEA: 060Q3604 | 06-KER-119-19.7/30.4 | COLD IN-PLACE RECYCLING AND PAVEMENT RESURFACING. | KERN COUNTY NEAR BAKERSFIELD FROM ROUTE 5/119 SEPARATION TO WIBLE ROAD | 10/08/2014 | 1 (08/22/2013) | Details CEM-3701 Report |
| 213445 | Project ID: 213445 DEA: 060T2004 EFIS: 0615000035 | 06-KER-99-0.0/11.2 | PAVEMENT REHABILITATION (2R) | KERN COUNTY NEAR BAKERSFIELD FROM ROUTE 5/99 SEPARATION TO 0.3 MILE NORTH OF OLD US 99 OVERCROSSING | 05/16/2024 | 1 (01/09/2019) | Details CEM-3701 Report |
| 8019 | Project ID: 8019 DEA: 060N1504 EFIS: 0600020439 | 06-KER-58-R59.6/R64.4,67.0/77.3 | OVERLAY WITH HOT MIX ASPHALT (BONDED WEARING COURSE) | KERN COUNTY NEAR BAKERSFIELD FROM ROUTE 58/184 SEPARATION TO 0.2 MILE WEST OF TEJON HIGHWAY OVERCROSSING AND FROM 0.3 MILE WEST OF CALIENTE CREEK BRIDGE TO 0.2 MILE EAST OF BEALVILLE ROAD | 10/08/2014 | 1 (12/10/2012) | Details CEM-3701 Report |
| 3207 | Project ID: 3207 DEA: 060H2504 | 06-KER-178-13.7/16.0,20.0/27.2 | PLACE RUBBERIZED HOT MIX ASPHALT ON EXISTING PAVEMENT. | KERN COUNTY NEAR BAKERSFIELD FROM SIDEHILL VIADUCT TO 0.8 MILE EAST OF EDISON POWERHOUSE AND FROM 0.1 MILE WEST OF UPPER RICHBAR CAMPGROUND TO 0.5 MILE EAST OF DEMOCRAT SPRINGS ROAD | 03/09/2012 | 1 (04/27/2011) | Details CEM-3701 Report |
| 3117 | Project ID: 3117 DEA: 060E5904 | 06-KER-99-3.9/10.4 | REGRADE THE NB OUTSIDE SHOULDER AND INSTALL CULVERT. | KERN COUNTY NEAR BAKERSFIELD FROM VALPREDO ROAD TO 1.1 MILE NORTH OF HERRING ROAD | 12/13/2012 | 1 (05/02/2011) | Details CEM-3701 Report |
| 995236 | Project ID: 995236 DEA: 060U2904 EFIS: 0616000001 | 06-KER-184-1.1/8.3 | COLD PLANE & OVERLAY WITH HMA/RHMA, CONSTRUCT SIDEWALKS & CURB RAMPS. | KERN COUNTY NEAR BAKERSFIELD FROM WHARTON AVENUE TO EDISON HIGHWAY | 1 (12/18/2024) | Details CEM-3701 Report | |
| 215398 | Project ID: 215398 DEA: 060X5204 | 06-KER-178,223-10.4/57.0,R17.1/R20.0 | COLD PLANE PAVEMENT, PLACE HMA, RUMBLE STRIPS AND TRAFFIC STRIPES. | KERN COUNTY NEAR BAKERSFIELD ON ROUTE 178 FROM 0.2 MILE EAST OF MIRAMONTE DRIVE TO KELSO VALLEY ROAD AND ON ROUTE 223 FROM VINELAND ROAD TO COMANCHE DRIVE | 03/02/2022 | 1 (01/04/2021) | Details CEM-3701 Report |
| 215321 | Project ID: 215321 DEA: 060U1004 EFIS: 0615000211 | 06-KER-43,119-0.1/9.3,18.2/19.7 | COLD IN PLACE RECYCLING AND RESURFACING EXISTING ROADWAY WITH RHMA. | KERN COUNTY NEAR BAKERSFIELD ON ROUTE 43 FROM ROUTE 119 TO 0.1 MILE NORTH OF ROUTE 58-MCKITTRICK HIGHWAY AND ON ROUTE 119 FROM ROUTE 43 TO ROUTE 119/5 SEPARATION | 05/04/2022 | 1 (11/30/2020) | Details CEM-3701 Report |
| 212194 | Project ID: 212194 DEA: 060V9604 EFIS: 0617000074 | 06-KER-33-54.2/R60.0 | PLACE RHMA-G (BWC) AND HMA (TYPE A) AND COLD PLANE AC PAVEMENT. | KERN COUNTY NEAR BLACKWELLS CORNER FROM 0.3 MILE SOUTH OF BROWN MATERIAL ROAD TO 0.2 MILE SOUTH OF ROUTE 46 | 10/10/2017 | 1 (10/10/2017) | Details CEM-3701 Report |
| 3361 | Project ID: 3361 DEA: 060M4504 | 06-KER-33-68.8/73.7 | COLD IN PLACE RECYCLING AND PLACE HOT MIX ASPHALT SURFACING. | KERN COUNTY NEAR BLACKWELLS CORNER FROM 0.4 MILE SOUTH OF TWISSELMAN ROAD TO KINGS COUNTY LINE | 12/13/2012 | 1 (04/18/2011) | Details CEM-3701 Report |
