Projects
To search for a project, enter filter criteria in the appropriate input field below. If a project is not listed, please contact a METS Representative for assistance.Displaying 11751-11760 of 18772 results.
| Project ID | Project Identifiers | DIST-CO-RTE-PM | Work Description | Location Description | Caltrans Closeout Date | METS Service Level | Actions |
|---|---|---|---|---|---|---|---|
| 213189 | Project ID: 213189 DEA: 060V2004 EFIS: 0617000175 | 06-KER-184,223-4.0/7.6,21.3/31.9 | COLD PLANE, REPAIR PAVEMENT AND RESURFACE WITH RHMA-GAP GRADED. | KERN COUNTY NEAR LAMONT ON ROUTE 184 FROM SOUTH OF PANAMA LANE TO NORTH OF KERNITA ROAD AND NEAR ARVIN ON ROUTE 223 FROM SAINT THOMAS STREET TO ROUTE 58 | 06/26/2019 | 1 (12/19/2018) | Details CEM-3701 Report |
| 7862 | Project ID: 7862 DEA: 074T3504 EFIS: 0700020019 | 07-LA-5755- | CONSTRUCT SAND-SALT SHED. | KERN COUNTY NEAR LEBEC AT THE FRAZIER SAND-SALT SHED | 07/02/2014 | 1 (12/10/2012) | Details CEM-3701 Report |
| 3063 | Project ID: 3063 DEA: 060A9904 EFIS: 0600000021 | 06-KER-5-0.8 | Restore and construct new facilities and landscape at rest side area. | KERN COUNTY NEAR LEBEC AT THE TEJON SAFETY ROADSIDE REST AREA | 01/22/2013 | 1 (04/27/2011) | Details CEM-3701 Report |
| 1001615 | Project ID: 1001615 DEA: 060X5704 EFIS: 0618000101 | 06-KER-5-0.8 | BUILDING WORK, MOBILIZATION, GUARDRAIL, TRO, AND PCMS. | KERN COUNTY NEAR LEBEC AT THE TEJON SAFETY ROADSIDE REST AREA | 1 (10/06/2025) | Details CEM-3701 Report | |
| 213053 | Project ID: 213053 DEA: 060X4604 EFIS: 0618000077 | 06-KER-5-R0.0/87.0 | REMOVE AND PLACE 6" TRAFFIC STRIPE. | KERN COUNTY NEAR LEBEC FROM LOS ANGELES COUNTY LINE TO 0.4 MILE NORTH OF ROUTE 5/99 SEPARATION AND FROM KERN RIVER UTILITY ROAD OVERCROSSING TO KINGS COUNTY LINE | 12/07/2018 | NOT VERIFIED | Details CEM-3701 Report |
| 3246 | Project ID: 3246 DEA: 060J3304 | 06-KER-46-31.9/32.3 | INSTALL SIGNAL AND LIGHTING, AND CONSTRUCT LEFT TURN LANE. | KERN COUNTY NEAR LOST HILLS FROM 0.3 MILE WEST OF WARREN STREET TO ROUTE 46/5 SEPARATION | 08/25/2011 | 1 (11/04/2011) | Details CEM-3701 Report |
| 214139 | Project ID: 214139 DEA: 060W4104 EFIS: 0617000214 | 06-KER-46-26.8/29.8,32.8/47.0 | INSTALL CENTERLINE AND SHOULDER RUMBLE STRIPS AND TRAFFIC STRIPE. | KERN COUNTY NEAR LOST HILLS FROM 0.7 MILE WEST OF BROWN MATERIAL ROAD TO 0.3 MILE WEST OF BRUNING AVENUE AND FROM 0.3 MILE EAST OF ROUTE 5/46 SEPARATION TO SCOFIELD AVENUE | 10/15/2020 | 1 (06/13/2019) | Details CEM-3701 Report |
| 212687 | Project ID: 212687 DEA: 06442544 EFIS: 0612000175 | 06-KER-46,5-31.5-33.2 | CONVERT 2-LANE TO 4-LANE CONVENTIONAL HIGHWAY. | KERN COUNTY NEAR LOST HILLS FROM 1.0 MILE EAST OF LOST HILLS ROAD TO 0.7 MILE EAST OF ROUTE 46/5 SEPARATION | 11/19/2021 | 1 (03/12/2018) | Details CEM-3701 Report |
| 213005 | Project ID: 213005 DEA: 060W7404 EFIS: 0617000277 | 06-KER-46-7.3/19.3,51.2/57.8 | PLACE RUBBERIZED HOT MIX ASPHALT (BWC). | KERN COUNTY NEAR LOST HILLS FROM KECKS ROAD TO 1.2 MILES WEST OF ROUTE 33 AND IN AND NEAR WASCO FROM J STREET TO ROUTE 99 | 12/07/2018 | NOT VERIFIED | Details CEM-3701 Report |
| 3408 | Project ID: 3408 DEA: 06353414 | 06-KER-46-0.0/11.8 | Widen highway with hot mix asphalt on aggregate base | KERN COUNTY NEAR LOST HILLS FROM KERN COUNTY LINE TO 0.1 KM WEST OF KECK'S ROAD | 12/13/2012 | 1 (01/12/2011) | Details CEM-3701 Report |
