Projects
To search for a project, enter filter criteria in the appropriate input field below. If a project is not listed, please contact a METS Representative for assistance.Displaying 11741-11750 of 18772 results.
| Project ID | Project Identifiers | DIST-CO-RTE-PM | Work Description | Location Description | Caltrans Closeout Date | METS Service Level | Actions |
|---|---|---|---|---|---|---|---|
| 212519 | Project ID: 212519 DEA: 033H2004 EFIS: 0317000242 | 03-PLA-89-13.05/21.67, 0.3/1.5 | AC Paving and overlay | 04/16/2021 | 1 (09/18/2017) | Details CEM-3701 Report | |
| 212520 | Project ID: 212520 DEA: 101F5404 EFIS: 1016000096 | 10-STA-99-R6.8/M18.5 | PAVEMENT DELINEATION | 07/28/2021 | 1 (04/11/2019) | Details CEM-3701 Report | |
| 212521 | Project ID: 212521 DEA: 043S9104 EFIS: 0400001044 | 04-MRN-1-7.7/7.8 | CONSTRUCT SOLDIER PILE WALL | MARIN COUNTY NEAR MUIR BEACH AT 0.2 MILE NORTH OF COLD STREAMFIRE ROAD. | 09/19/2018 | 1 (07/17/2017) | Details CEM-3701 Report |
| 212522 | Project ID: 212522 DEA: 043S9004 EFIS: 0400001043 | 04-MRN-1-6.6, 6.60 | CONSTRUCT SOLDIER PILE WALL | IN MARIN NEAR MUIR BEACH AT 0.3 MILE NORTH OF SEACAPE DRIVE | 09/19/2018 | 1 (07/17/2017) | Details CEM-3701 Report |
| 212523 | Project ID: 212523 DEA: 033H3504 EFIS: 0317000327 | 03-SIE-49-45.19 | Construct Viaduct and re-establish both lanes of travel | 01/15/2019 | 1 (08/01/2017) | Details CEM-3701 Report | |
| 212524 | Project ID: 212524 Permit Numbers: 0416NOP2362 | 04-SM-82-6.1/6.5 | Installation of two new drives on northbound El Camino Real into the relocated San Carlos Transit Center Parking lot. | El Camino Real, San Carlos | 11/30/00-1 | 1 (11/08/2019) | Details CEM-3701 Report |
| 212525 | Project ID: 212525 DEA: 010H4204 EFIS: 0117000171 | 01-MEN-101-37/40 | Slope stabilization and roadway repair | 12/04/2019 | 1 (08/15/2017) | Details CEM-3701 Report | |
| 212526 | Project ID: 212526 Permit Numbers: 0717NSN0932 | 07--66-0.049/0.049 | Install 20' Type 15 pole and license plate readers, including conduit, conductors, pull boxes and other associated equipment. | Route 66 (Foothill Boulevard), La Verne | 08/22/2018 | NOT VERIFIED | Details CEM-3701 Report |
| 212527 | Project ID: 212527 DEA: 101F6801 EFIS: 1017000066 | 10-MPA-120-Var | Repair of five culverts in Mariposa County along Route 120 with concrete liners. | In Mariposa County in and near Buck Meadows at various locations. | 1 (04/11/2019) | Details CEM-3701 Report | |
| 212532 | Project ID: 212532 DEA: 11262204 EFIS: 1100000215 | 11--- | 11/06/2019 | 1 (11/06/2019) | Details CEM-3701 Report |
