Projects
To search for a project, enter filter criteria in the appropriate input field below. If a project is not listed, please contact a METS Representative for assistance.Displaying 11741-11750 of 18861 results.
| Project ID | Project Identifiers | DIST-CO-RTE-PM | Work Description | Location Description | Caltrans Closeout Date | METS Service Level | Actions |
|---|---|---|---|---|---|---|---|
| 995116 | Project ID: 995116 DEA: 07370304 EFIS: 0720000115 Permit Numbers: 0721AOP3183 | 07-LA-I-10- | New Class IV bikeway, Class I shared-use separated paths, lighting and landscaping improvements, curb ramps, signal and lighting. | 20th Street OC/Interstate 10, Santa Monica | NOT VERIFIED | Details CEM-3701 Report | |
| 995480 | Project ID: 995480 DEA: 030N4804 EFIS: 0324000120 | 03-BUT-99-31.5 | Repair to High-Load Hit | 20th St OC, Chico | 12/24/2024 | 1 (11/16/2023) | Details CEM-3701 Report |
| 208913 | Project ID: 208913 DEA: 060J3204 EFIS: 0600000169 COOP: 061505 Permit Numbers: 0612NMC0061 0613NDP0456 | 06-MAD--11/11 | Enter upon the State Highway Right-of-way on State Route 99 (SR-99) in Madera at the SR-99/4th Street Overcrossing Bridge (PM 11.0) to set up, maintain, and remove temporary traffic control necessary in order to construct the City of Madera's SR-99/4th St | 205 W. Fourth St., Madera | 08/27/2018 | 2 (10/07/2013) | Details CEM-3701 Report |
| 210602 | Project ID: 210602 Permit Numbers: 05146CS0578 | 05-MON-152-3.13/3.16 | Reconstruct curb, gutter, and sidewalk, and demolish existing | 204 E. Beach Street, Watsonville | 09/17/2018 | NOT VERIFIED | Details CEM-3701 Report |
| 2938 | Project ID: 2938 DEA: 051A4904 EFIS: 0500020361 | 05-SLO-1-73.0/74.3 | Repair Slide | 2.6 miles north of San Carporforo Creek Bridge | 01/17/2014 | 1 (05/05/2011) | Details CEM-3701 Report |
| 7333 | Project ID: 7333 DEA: 010C2704 EFIS: 0112000244 | 01-MEN-1-86.5 | Repair Slide | 2.6 miles North of Hardy Creek Bridge #10-141 | 04/09/2013 | 1 (04/05/2012) | Details CEM-3701 Report |
| 6485 | Project ID: 6485 DEA: 120A9314 | 12-ORA-133-12.6 | SR 133 East Leg Widening Project. One lane is being added to the median side to both the NB & SB SR 133. MBGR will be installed as a median barrier along the entire length of the project | 2.5 miles in length and is located between the I-5 freeway and the SR 241 on the SR 133. | 07/28/2010 | 1 (07/28/2010) | Details CEM-3701 Report |
| 213354 | Project ID: 213354 DEA: 041Q8904 EFIS: 0418000361 | 04-SON-128-2.48 | Replace Culvert and Downdrain | 2.3 Mi W. of Cloverdale Blvd. and 2.48 Mi E. of SON/MEN County Line | 01/20/2025 | 1 (05/04/2018) | Details CEM-3701 Report |
| 714 | Project ID: 714 DEA: 024E1504 EFIS: 0200020211 | 02-TRI-299-28.8 | Remove the rock over hang, cut slope back, repair roadway surface | 2 mile east of North Fork Trinity River Bridge | 11/05/2020 | 1 (12/28/2010) | Details CEM-3701 Report |
| 215363 | Project ID: 215363 Permit Numbers: 04206UC2300 04216RT0571 | 04-SF-SM-82-19.6-19.6 | Remove an unauthorized cell site installed on State light standard, and replace light standard with a new State light standard in conjunction with permit 0418-6UC2376 | 199 El Camino Real, South San Francisco | 1 (12/14/2020) | Details CEM-3701 Report |
