Projects
To search for a project, enter filter criteria in the appropriate input field below. If a project is not listed, please contact a METS Representative for assistance.Displaying 11731-11740 of 17390 results.
Project ID | Project Identifiers | DIST-CO-RTE-PM | Work Description | Location Description | Caltrans Closeout Date | METS Service Level | Actions |
---|---|---|---|---|---|---|---|
212588 | Project ID: 212588 DEA: 081C1004 | 08-SBD-18-9.1/R17.8 | MILL, OVERLAY, UPGRADE DIKE AND GUARDRAIL ON STATE ROUTE 18 | SAN BERNARDINO COUNTY NEAR CRESTLINE FROM 0.1 MILE SOUTH OF ARROWHEAD SPRINGS ROAD TO ROUTE 18/138 SEPARATION | 06/23/2021 | 1 (12/31/2018) | Details CEM-3701 Report |
212591 | Project ID: 212591 DEA: 120F04A4 | 12-ORA-57-12.2/15.2 | PLANTING, ROCK BLANKET, MINOR CONCRETE | ORANGE COUNTY IN ANAHEIM FROM 0.3 MILE SOUTH OF KATELLA AVENUE UNDERCROSSING TO 0.3 MILE NORTH OF LINCOLN AVENUE OVERCROSSING | 07/29/2021 | 1 (03/29/2018) | Details CEM-3701 Report |
212578 | Project ID: 212578 DEA: 101E9404 EFIS: 1016000135 MINOR: 10A1865 | 10-STA-99-Var | Replace Damaged Fences | In San Joaquin and Stanislaus Counties | 12/06/2019 | 1 (12/20/2018) | Details CEM-3701 Report |
212579 | Project ID: 212579 Permit Numbers: 05146MC0394 05166RW0400 05176DP0473 | 05-SB-101-21.1/21.2 | Restripe traffic lanes on Patterson Avenue Overcrossing (Br. No. 51-165) to provide dual left turn lanes and install a ramp meter system for Hwy 101 southbound on-ramp | Hwy 101, Goleta | 08/19/2019 | 1 (07/25/2017) | Details CEM-3701 Report |
212980 | Project ID: 212980 DEA: 010G6404 EFIS: 0117000034 | 01-HUM-101-58.8/65.6 | RHMA-GAP GRADED (BWC), REMOVE CONCRETE, PLACE DIKE AND MGS | HUMBOLDT COUNTY IN AND NEAR FORTUNA FROM 0.7 MILE SOUTH OF KENMAR ROAD UNDERCROSSING TO 0.4 MILE SOUTH OF LOLETA DRIVE OVERCROSSING | 12/07/2020 | 1 (04/27/2018) | Details CEM-3701 Report |
212581 | Project ID: 212581 DEA: 030H1004 EFIS: 0315000076 | 03-ED-50-37.6 | 07/26/2023 | 1 (12/04/2017) | Details CEM-3701 Report | ||
212582 | Project ID: 212582 Permit Numbers: 08156MC0720 08166SV0017 08186RT0086 | 08---26.5/26.7 | Enter onto Interstate 15 (I-15) right-of-way at Lake Street in the City of Lake Elsinore to perform grading, paving, and striping necessary to accommodate the addition of new left turn lane on the NB off-ramp and right/left turn lanes from Lake Street onto the SB on-ramp, and to install new signals | I-15 NB Lake Street off-ramp, Lake Elsinore | 06/23/2021 | 1 (03/20/2018) | Details CEM-3701 Report |
212586 | Project ID: 212586 DEA: 060S4704 EFIS: 0615000048 | 06-KER-58-R55.4/R59.7 | CONSTRUCT CONTINUOUSLY REINFORCED CONCRETE AND HMA PAVEMENT. | KERN COUNTY IN AND NEAR BAKERSFIELD FROM COTTONWOOD ROAD UNDERCROSSING TO 0.3 MILE EAST OF ROUTE 58/184 SEPARATION. | 10/14/2020 | 1 (05/15/2018) | Details CEM-3701 Report |
212587 | Project ID: 212587 DEA: 06461504 EFIS: 0600020148 | 06-TUL-190-0.0/8.0 | LANE AND SHOULDER WIDENING AND OVERLAY | TULARE COUNTY NEAR TIPTON FROM 0.1 MILE WEST OF ROUTE 99 TO 0.1 MILE EAST OF ROAD 180 | 08/13/2020 | 1 (04/24/2018) | Details CEM-3701 Report |
212589 | Project ID: 212589 DEA: 081C5604 | 08-SBD-18-44.5/52.8 | SEDIMENT CONTROL AND STABILIZATION MEASURES | SAN BERNARDINO COUNTY IN AND NEAR BIG BEAR LAKE FROM 0.2 MILE EAST OF ROUTE 38 TO GILDART DRIVE | 06/23/2021 | 1 (06/23/2021) | Details CEM-3701 Report |