Projects

To search for a project, enter filter criteria in the appropriate input field below. If a project is not listed, please contact a METS Representative for assistance.
Displaying 11731-11740 of 18861 results.
Project IDProject IdentifiersDIST-CO-RTE-PMWork DescriptionLocation DescriptionCaltrans Closeout DateMETS Service LevelActions
     
214659Project ID: 214659
DEA: 060U4904
EFIS: 0616000002
06-KER-204-5.1/6.7COLD PLANE AC PVMT, OVERLAY WITH HMA & RHMA, MODIFY SIGNAL & LIGHTING.KERN COUNTY IN BAKERSFIELD FROM F STREET TO ROUTE 204/99 SEPARATION07/19/20211 (02/05/2020)Details CEM-3701 Report
213154Project ID: 213154
DEA: 060G8514
EFIS: 0614000009
06-KER-58-R52.4/R55.5REPLACE LANES AND SHOULDERS WITH CONTINUOUSLY REINFORCED CONCRETE.KERN COUNTY IN BAKERSFIELD FROM ROUTE 58/99 SEPARATION TO COTTONWOOD ROAD UNDERCROSSING11/29/20211 (06/05/2018)Details CEM-3701 Report
994144Project ID: 994144
DEA: 060W15V4
EFIS: 0619000107
06-KER-58,204-R53.4/R54.5,R0.0/4.6MODIFY SIGNAL AND LIGHTING SYSTEMS AND REPLACE CURB RAMPS.KERN COUNTY IN BAKERSFIELD ON ROUTE 58 FROM SOUTH H STREET OVERCROSSING TO ROUTE 204 AND ON ROUTE 204 FROM ROUTE 58/204 SEPARATION TO L STREET05/09/20251 (07/28/2022)Details CEM-3701 Report
213444Project ID: 213444
DEA: 060Q2804
EFIS: 0613000051
06-KER-99,178-23.8/R28.4,0.1RECONSTRUCT LANES AND SHOULDERS WITH CRCP, MODIFYING ELECTRICAL SYSTEMKERN COUNTY IN BAKERSFIELD ON ROUTE 99 FROM 0.3 MILE SOUTH OF PALM AVENUE OVERCROSSING TO BEARDSLEY CANAL BRIDGE AND ON ROUTE 178 AT ROUTE 99/178 SEPARATION05/11/20231 (12/13/2018)Details CEM-3701 Report
1000009Project ID: 1000009
DEA: 061F8504
EFIS: 0623000103
06-KER-58-27.2/28.2COLD PLANE AC PAVEMENT AND PLACE HMA (TYPE A).KERN COUNTY IN BUTTONWILLOW FROM 0.1 MILE WEST OF BUTTONWILLOW DRIVE TO 0.6 MILE WEST OF WASCO WAY05/09/20251 (01/08/2024)Details CEM-3701 Report
210219Project ID: 210219
DEA: 060T1704
EFIS: 0615000408
06-KER-58-28.2/31.5COLD IN-PLACE RECYCLING, COLD PLANE AND HMA (TYPE A) OVERLAY.KERN COUNTY IN BUTTONWILLOW FROM 0.4 MILE EAST OF MAIN DRAIN CANAL BRIDGE TO 0.2 MILE WEST OF ROUTE 5/58 SEPARATION04/05/20211 (03/23/2015)Details CEM-3701 Report
212065Project ID: 212065
DEA: 060V5304
06-KER-58,99-28.2/31.4,R43.9/48.7OVERLAY WITH GAP GRADED RUBBERIZED HOT MIX ASPHALTKERN COUNTY IN BUTTONWILLOW ON ROUTE 58 FROM LESLIE LANE TO 0.2 MILE WEST OF ROUTE 5/58 SEPARATION AND NEAR MCFARLAND ON ROUTE 99 FROM LERDO CANAL BRIDGE TO 1.3 MILES NORTH OF WHISLER ROAD OVERCROSSING04/24/2018NOT VERIFIEDDetails CEM-3701 Report
209920Project ID: 209920
DEA: 072W5404
EFIS: 0713000206
07-KER-5725-CONSTRUCT WASH BUILDING FACILITY.KERN COUNTY IN LEBEC AT THE LEBEC MAINTENANCE STATION AT 1586 LEBEC SERVICE ROAD05/06/20161 (12/29/2014)Details CEM-3701 Report
995056Project ID: 995056
DEA: 061E7804
EFIS: 0622000083
06-KER-99-49.3/50.4,55.5/56.6WROUGHT IRON FENCE, PLANTING AND IRRIGATION.KERN COUNTY IN MCFARLAND AND DELANO FROM 0.1 MILE SOUTH OF SHERWOOD AVENUE TO 0.1 MILE NORTH OF PERKINS AVENUE AND FROM ROUTE 155/99 SEPARATION TO CECIL AVENUE01/09/20261 (08/07/2023)Details CEM-3701 Report
211595Project ID: 211595
DEA: 060H6424
EFIS: 0614000266
06-KER-99-49.6CONSTRUCT PEDESTRIAN OVERCROSSING BRIDGE.KERN COUNTY IN MCFARLAND AT KERN AVENUE PEDESTRIAN OVERCROSSING08/29/20181 (10/07/2016)Details CEM-3701 Report