Projects
To search for a project, enter filter criteria in the appropriate input field below. If a project is not listed, please contact a METS Representative for assistance.Displaying 11721-11730 of 17620 results.
Project ID | Project Identifiers | DIST-CO-RTE-PM | Work Description | Location Description | Caltrans Closeout Date | METS Service Level | Actions |
---|---|---|---|---|---|---|---|
212569 | Project ID: 212569 DEA: 071XE704 | 07-LA-107-0.0/2.1 | Replace AC pavement and overlay, repair localized failed areas and slurry left turn pockets in both directions | 04/04/2018 | NOT VERIFIED | Details CEM-3701 Report | |
212570 | Project ID: 212570 Permit Numbers: 0416NUS2093 | 04--- | 11/30/00-1 | 1 (02/03/2020) | Details CEM-3701 Report | ||
212571 | Project ID: 212571 DEA: 051F79A4 EFIS: 0514000061 | 05-SB-101-55.9/R56.2 | Nojoqui Creek Bridge (51-0018 L/R) widening and rail replacement. | IN SANTA BARBARA COUNTY NEAR BUELLTON AT NOJOQUI CREEK BRIDGE (BR #51-0018 L/R) | 1 (02/20/2020) | Details CEM-3701 Report | |
212572 | Project ID: 212572 DEA: 030G9404 EFIS: 0317000204 | 03-SAC,YOL/SAC-5,50-2.4/L0.7 | Remove MLS and 1" polyester concrete overlay on Pioneer Bridge in Sacramento, CA. | Sacramento, CA | 04/16/2021 | 1 (07/12/2017) | Details CEM-3701 Report |
212573 | Project ID: 212573 DEA: 010B5504 EFIS: 0112000137 | 01-MEN-162-16.2 | RECONSTRUCT ROADWAY, CONSTRUCT SOLDIER PILE AND TIEBACK WALL | MENDOCINO COUNTY ON ROUTE 162 1 MILE EAST OF MIDDLE FORK EEL RIVER BRIDGE | 10/05/2020 | 1 (10/03/2017) | Details CEM-3701 Report |
212583 | Project ID: 212583 DEA: 022H9304 EFIS: 0217000030 | 02-TEH-99-0.3/8.9 | REPLACE ASPHALT CONCRETE SURFACING WITH A PAVING FABRIC INTERLAYER | TEHAMA COUNTY NEAR LOS MOLINOS FROM 0.3 MILE NORTH OF BUTTE COUNTY LINE TO 0.2 MILE SOUTH OF CHAMPLIN SLOUGH | 04/03/2018 | 1 (01/02/2018) | Details CEM-3701 Report |
212574 | Project ID: 212574 DEA: 02368414 EFIS: 0215000066 | 02-SHA-44-R4.6/R6.4 | CONSTRUCT OVERCROSSING, WIDEN WITH HMA AND AB, AND OVERLAY WITH HMA | SHASTA COUNTY NEAR PALO CEDRO FROM CLOUGH CREEK BRIDGE TO 0.6 MILE WEST OF DESCHUTES ROAD UNDERCROSSING | 11/24/2021 | 1 (07/28/2017) | Details CEM-3701 Report |
212598 | Project ID: 212598 DEA: 044G4904 EFIS: 0412000491 | 04-NAP-29-11.9 | CONCRETE BARRIER, HMA PAVEMENT, DRAINAGE IMPROVEMENTS | NAPA COUNTY IN NAPA AT LINCOLN-SOLANO ON-RAMP | 08/01/2018 | 1 (10/18/2017) | Details CEM-3701 Report |
212575 | Project ID: 212575 DEA: 060G9804 EFIS: 0613000022 | 06-TUL-65-31.6/39.6 | REPAIR FAILED AREAS, COLD IN PLACE RECYCLING AND RESURFACE WITH RHMA. | TULARE COUNTY IN AND NEAR EXETER FROM ROUTE 137 TO ROUTE 198 | 06/19/2019 | 1 (04/24/2018) | Details CEM-3701 Report |
212576 | Project ID: 212576 DEA: 080R7804 EFIS: 0812000165 | 08-RIV-74-52.1/62.5,78.7/R92.0 | INSTALL MIDWEST GUARDRAIL SYSTEM (MGS) | RIVERSIDE COUNTY FROM 1.2 MILES WEST OF STRAWBERRY CREEK BRIDGE TO 0.2 MILE WEST OF APPLE CANYON ROAD AND FROM 0.7 MILE EAST OF RIBBONWOOD DRIVE TO 1.3 MILES WEST OF CAHUILLA WAY | 06/23/2021 | 1 (03/20/2018) | Details CEM-3701 Report |