Projects
To search for a project, enter filter criteria in the appropriate input field below. If a project is not listed, please contact a METS Representative for assistance.Displaying 11721-11730 of 17619 results.
Project ID | Project Identifiers | DIST-CO-RTE-PM | Work Description | Location Description | Caltrans Closeout Date | METS Service Level | Actions |
---|---|---|---|---|---|---|---|
6003 | Project ID: 6003 EFIS: 0000001155 Permit Numbers: 1109NMC0153 | 11-SD-52-6.76/6.91 | enter upon State Highway right of way in San Diego County, City of San Diego, on Route 52, post mile 6.76-6.91 to widen the eastbound exit ramp, as shown on the attached plans, in accordance with the attached Special Provisions dated as received September | ROUTE 52, SAN DIEGO | 08/01/2018 | NOT VERIFIED | Details CEM-3701 Report |
6002 | Project ID: 6002 Permit Numbers: 1109NMC0152 | 11-SD-15-9.97/10.14 | enter upon State Highway right of way in San Diego County, City of San Diego, on Route 15, post mile R9.97-R10.14 to widen the southbound exit ramp, as shown on the attached plans, in accordance with the attached Special Provisions dated as received June | INTERSTATE 15, SAN DIEGO | 08/01/2018 | NOT VERIFIED | Details CEM-3701 Report |
6001 | Project ID: 6001 EFIS: 0000001155 Permit Numbers: 1109NMC0038 | 11-SD-94-15.31/15.47 | enter upon State Highway right of way in San Diego County, Community of Rancho San Diego, on Route 94, post mile 15.31-15.47, to construct two driveways, add a left turn lane, and modify a signalized intersection as shown on the attached plans, in accordance | ROUTE 94, SPRING VALLEY | 08/01/2018 | NOT VERIFIED | Details CEM-3701 Report |
6000 | Project ID: 6000 DEA: 11098194 | 11-SD-125-14.8 | WETLANDS RESTORATION, EARTHWORK, PLANTING AND IRRIGATION | SAN DIEGO CO. IN AND NEAR CHULA VISTA ON PROCTOR VALLEY RD. 0.1 KM W. OF RTE 125 TO 0.1 KM S. OF BONITA MEAFDOWS LANE | 1 (12/15/2006) | Details CEM-3701 Report | |
5999 | Project ID: 5999 EFIS: 0000001155 Permit Numbers: 11096SN0472 | 11-SD-805-18.88/19.01 | enter upon State Highway right of way in San Diego County, City of San Diego, on Route 805, post mile 18.88-19.01, to signalize the northbound ramp intersection, as shown on the attached plans, in accordance with the requirements and conditions contained | INTERSTATE 805, SAN DIEGO | 08/01/2018 | 1 (02/04/2013) | Details CEM-3701 Report |
5998 | Project ID: 5998 DEA: 11091894 | 11-SD-125-14.8 | 0.1KM WEST OF RTE 5 TO 0.1KM SOUTH OF BONITA MEADOWS LANE | 08/02/2010 | NOT VERIFIED | Details CEM-3701 Report | |
5997 | Project ID: 5997 DEA: 11091834 | 11-SD-905,805-R8.4/R9.8,3.1/4.2 | CONSTRUCT NEW FREEWAY (PHASE 2.) | SAN DIEGO COUNTY IN SAN DIEGO ON ROUTE 905 FROM 0.1 KM EAST TO 1.5 KM EAST OF ROUTE 905/805 SEPARATION AND ON ROUTE 805 FROM 0.2 KM NORTH OF ROUTE 905/805 SEPARATION TO 0.5 KM SOUTH OF PALM AVENUE OVERCROSSING | 06/05/2014 | 1 (03/10/2011) | Details CEM-3701 Report |
5996 | Project ID: 5996 DEA: 11091824 | 11-SD-905-R13.9/R18.6 | CONSTRUCT NEW FREEWAY | 06/30/2011 | 1 (10/26/2011) | Details CEM-3701 Report | |
5995 | Project ID: 5995 DEA: 11090004 | 11-SD-8- | 08/17/2021 | 2 (07/09/2021) | Details CEM-3701 Report | ||
5994 | Project ID: 5994 Permit Numbers: 1108NSN0658 | 11-SD-282-.51/.69 | INSTALL DRAINAGE IMPROVEMENTS AND TRAFFIC SIGNALS AT THE SR 282 AND ALAMEDA BLVD/TOW WAY RD | 08/01/2018 | NOT VERIFIED | Details CEM-3701 Report |