Projects
To search for a project, enter filter criteria in the appropriate input field below. If a project is not listed, please contact a METS Representative for assistance.Displaying 11721-11730 of 18772 results.
| Project ID | Project Identifiers | DIST-CO-RTE-PM | Work Description | Location Description | Caltrans Closeout Date | METS Service Level | Actions |
|---|---|---|---|---|---|---|---|
| 7184 | Project ID: 7184 DEA: 10415804 EFIS: 1000000431 | 10-MER-99-0.0/4.6 | 08/03/2018 | 1 (11/20/2012) | Details CEM-3701 Report | ||
| 7183 | Project ID: 7183 DEA: 100V9604 | 10-SJ-4-T15.3/R18.9 | COLD PLANE AND PLACE HMA | SAN JOAQUIN COUNTY IN STOCKTON AT VARIOUS LOCATIONS FROM FRESNO AVENUE TO 0.1 MILE EAST OF FILBERT STREET OVERCROSSING | 01/04/2013 | 1 (04/23/2012) | Details CEM-3701 Report |
| 7182 | Project ID: 7182 DEA: 100V9304 | 10-TUO-49,108-16.3/18.0,6.5/R11.3 | REPAIR FAILED AREAS AND APPLY RUBBERIZED HMA (GAP GRADED). | TUOLUMNE COUNTY IN AND NEAR SONORA ON ROUTE 49 FROM 0.2 MILE NORTH OF MILL VILLA ROAD TO WASHINGTON STREET AND AT AND NEAR MONO VISTA ON ROUTE 108 FROM 0.2 MILE WEST OF HIDDEN ACRES ROAD TO EAST AVENUE UNDERCROSSING | 01/04/2013 | 1 (04/09/2012) | Details CEM-3701 Report |
| 7181 | Project ID: 7181 DEA: 100V5904 EFIS: 1000020471 | 10-SJ-4-14.2 | CLEAN AND PAINT STRUCTURAL STEEL EXISTING BRIDGE. | SAN JOAQUIN COUNTY NEAR STOCKTON AT SAN JOAQUIN RIVER BRIDGE | 10/27/2014 | 1 (04/16/2012) | Details CEM-3701 Report |
| 7180 | Project ID: 7180 DEA: 09350104 EFIS: 0900000227 | 09-MNO-158-2.5/2.9 | CONSTRUCT SIDEWALKS AND ADA RAMPS. | MONO COUNTY AT JUNE LAKE FROM WEST BIG ROCK ROAD TO GULL LAKE ROAD | 08/22/2013 | 1 (09/11/2012) | Details CEM-3701 Report |
| 7179 | Project ID: 7179 DEA: 09349204 EFIS: 0900020066 | 09-MNO-108,182,395-Var | BRIDGE DECK POLYESTER CONCRETE OVERLAY AND CABLE RAILING. | MONO COUNTY AT VARIOUS LOCATIONS | 08/27/2012 | 1 (06/21/2012) | Details CEM-3701 Report |
| 7178 | Project ID: 7178 DEA: 09348304 EFIS: 0900020096 | 09-INY-127-0.1/16.2 | REMOVE AND PLACE CULVERTS. | INYO COUNTY AT AND NEAR SHOSHONE AT VARIOUS LOCATIONS FROM 0.1 MILE NORTH OF SAN BERNARDINO COUNTY LINE TO 0.2 MILE SOUTH OF NORTH JUNCTION 178 | 08/22/2012 | 1 (06/11/2012) | Details CEM-3701 Report |
| 7177 | Project ID: 7177 DEA: 09348104 EFIS: 0900020098 | 09-INY,MNO-395,6-var | BONDED WEARING COURSE OVERLAY. | INYO AND MONO COUNTIES AT VARIOUS LOCATIONS | 10/10/2013 | 1 (09/24/2012) | Details CEM-3701 Report |
| 7176 | Project ID: 7176 DEA: 09344204 | 09-MNO-120-R3.7 | REHABILITATE BRIDGE DECK. | MONO COUNTY ABOUT 9 MILES WEST OF LEE VINING AT DODGE POINT SIDEHILL VIADUCT BRIDGE | 02/07/2013 | 1 (04/09/2012) | Details CEM-3701 Report |
| 7175 | Project ID: 7175 DEA: 080P9504 | 08-RIV-74-47.9/63.067.5/71.8 | COLD PLANE, REPLACE AC SURFACING AND RHMA-G AND HMA-A OVERLAY | RIVERSIDE COUNTY IN HEMET AND NEAR ANZA FROM MARSHALL AVENUE TO HURKEY CREEK BRIDGE AND FROM 0.4 MILE WEST OF MORRIS RANCH ROAD TO ROUTE 74/371 SEPARATION | 08/26/2013 | 1 (04/02/2012) | Details CEM-3701 Report |
