Projects
To search for a project, enter filter criteria in the appropriate input field below. If a project is not listed, please contact a METS Representative for assistance.Displaying 11721-11730 of 18861 results.
| Project ID | Project Identifiers | DIST-CO-RTE-PM | Work Description | Location Description | Caltrans Closeout Date | METS Service Level | Actions |
|---|---|---|---|---|---|---|---|
| 214143 | Project ID: 214143 Permit Numbers: 04166UT0590 04176RT1690 | 04---6.9/6.9 | Underground joint trench with power poles at intersection of highway 152 (Hecker Pass Road)and Autumn Road. | 2370 Hecker pass, Gilroy | 11/30/00-1 | 1 (08/28/2019) | Details CEM-3701 Report |
| 214155 | Project ID: 214155 Permit Numbers: 04166UT0590 04176RT1690 | 04---6.9/6.9 | Underground joint trench with power poles at intersection of highway 152 (Hecker Pass Road)and Autumn Road. | 2370 Hecker pass, Gilroy | 11/30/00-1 | 1 (08/28/2019) | Details CEM-3701 Report |
| 4779 | Project ID: 4779 EFIS: 0000001155 Permit Numbers: 08096MC0339 | 08-RIV-60-14.425 | Existing Block Wall built along State & prime; existing Chain link Fence. The wall is located within private property. | 23090 Sunnymead Blvd. | 12/04/2009 | 2 (12/04/2009) | Details CEM-3701 Report |
| 3677 | Project ID: 3677 EFIS: 0000001155 Permit Numbers: 0709NMC0171 | 07-LA-110-20.2 - 21.2 | partial replacement of Flower St. | 23 rd street & Flower st. | 07/31/2018 | 1 (01/15/2013) | Details CEM-3701 Report |
| 213507 | Project ID: 213507 Permit Numbers: 07176SN1295 07186RT1557 | 07---45/45 | installing a mid-block traffic signal along with associated appurtenances, tying into the existing traffic signal interconnect, constructing curb ramps, driveway and sidewalk improvements, removing and installing pavement markings and road side signs as necessary, performing associated traffic cont | 22878 Pacific Coast Highway, Malibu | 06/17/2021 | 1 (07/24/2018) | Details CEM-3701 Report |
| 212441 | Project ID: 212441 Permit Numbers: 04156CS2275 04176DP0883 | 04-SM-82-11.7/11.7 | Construct new curb,gutter,and sidewalk on El Camino Real along property frontage at 221 S. El Camino Real. | 221 El Camino Real, San Mateo | 08/22/2018 | 1 (05/10/2017) | Details CEM-3701 Report |
| 8235 | Project ID: 8235 DEA: 050G1604 EFIS: 0500000056 Permit Numbers: 05116RC0621 | 05-SB-166-4.5/4.5 | Construct a commercial roadway connection and left turn lane to a Caltrans constructed driveway across from Black Road on Caltrans Project 05-0G160; Caltrans constructed driveway and applicant constructed connection to driveway will replace the existing a | 2165 Main Street, Santa Maria | 09/17/2018 | 1 (04/29/2013) | Details CEM-3701 Report |
| 213375 | Project ID: 213375 Permit Numbers: 0716NSN2363 0718NRT1066 0719NRW0305 | 07---44.5 | Install new traffic signal, replace curb/gutter sidewalk, safety lighting, pedestrian heads, utility boxes, signage and new striping.**Modified ped. sig. sys. to HAWK | 21440 PCH, Malibu | 11/30/00-1 | 1 (05/22/2018) | Details CEM-3701 Report |
| 210638 | Project ID: 210638 Permit Numbers: 0615AOP0108 0615ADP0318 0615ART0547 | 06-KER-46-29.9/30.5 | Enter upon the State Highway Right-of-way on State Route 46 (SR 46) from PM 29.9 to PM 30.5 in Karen County, to set up, maintain, and remove temporary traffic control necessary to construct Kern County Roads Department?s Pedestrian Path Project No. 3000-SR4641T, Contract No. 14007 (Federal Project | 21155 Hwy 46, Lost Hills | 04/04/2019 | NOT VERIFIED | Details CEM-3701 Report |
| 3537 | Project ID: 3537 EFIS: 0000001155 Permit Numbers: 07036MC2529 | 07-LA-210-R30.71-R30.71 | Proposes to improve the westbound off-ramp 210 @ Baldwin/Foothill Blvd. sound wall, retaining wall, signals modify | 210fwy/Baldwin Ave. in Arcadia City | 01/30/2013 | 1 (01/30/2013) | Details CEM-3701 Report |
