Projects
To search for a project, enter filter criteria in the appropriate input field below. If a project is not listed, please contact a METS Representative for assistance.Displaying 11721-11730 of 18772 results.
| Project ID | Project Identifiers | DIST-CO-RTE-PM | Work Description | Location Description | Caltrans Closeout Date | METS Service Level | Actions |
|---|---|---|---|---|---|---|---|
| 993686 | Project ID: 993686 DEA: 09387404 EFIS: 0920000056 | 09-KER-14-40.3/41.5 | REMOVE GUARDRAIL AND PLACE MIDWEST GUARDRAIL SYSTEMS. | KERN COUNTY NEAR CANTIL FROM 0.2 MILE SOUTH OF SOUTH ABBOTT ROAD TO 1.4 MILES SOUTH OF NORTH ABBOTT ROAD | 08/30/2022 | 1 (12/20/2023) | Details CEM-3701 Report |
| 209352 | Project ID: 209352 DEA: 060Q8104 EFIS: 0613000246 | 06-KER-155,204-R6.5/R11.0;R0.0/3.7 | COLD PLANE ASPHALT CONCRETE PAVEMENT AND REPLACE WITH HOT MIX ASPHALT. | KERN COUNTY NEAR DELANO ON ROUTE 155 FROM FAMOSO-PORTERVILLE ROAD TO ROUTE 65 AND IN BAKERSFIELD FROM ROUTE 58/204 SEPARATION TO 0.3 MILE NORTH OF TRUXTON AVENUE | 02/16/2021 | 1 (12/24/2014) | Details CEM-3701 Report |
| 213004 | Project ID: 213004 DEA: 060V2504 EFIS: 0617000177 | 06-KER-33-27.0/34.1 | RESURFACE PAVEMENT WITH RHMA-GAP GRADED (BONDED WEARING COURSE). | KERN COUNTY NEAR DERBY ACRES FROM 0.2 MILE SOUTH OF SHALE ROAD TO RESERVE ROAD | 09/05/2018 | NOT VERIFIED | Details CEM-3701 Report |
| 3326 | Project ID: 3326 DEA: 060L1504 | 06-KER-33,58-63.0/68.8,15.4/21.7 | Place rubberized hot mix asphalt on existing pavement. | KERN COUNTY NEAR DEVILS DEN ON ROUTE 33 FROM 2.9 MILES NORTH OF ROUTE 46 TO 0.4 MILE SOUTH OF TWISSELMAN ROAD AND NEAR MCKITTRICK ON ROUTE 58 FROM ROUTE 33 TO 1.3 MILES WEST OF CALIFORNIA AQUEDUCT | 11/04/2011 | 1 (11/04/2011) | Details CEM-3701 Report |
| 1000849 | Project ID: 1000849 DEA: 061C0104 EFIS: 0621000001 | 06-KER-5500- | REPLACE RADIO VAULT AND RADIO TOWER. | KERN COUNTY NEAR DUSTIN ACRES AT THE ELK HILLS RADIO VAULT | 1 (12/16/2024) | Details CEM-3701 Report | |
| 7258 | Project ID: 7258 DEA: 060N4004 EFIS: 0600020651 | 06-KER-58-67.8 | CONSTRUCT ROCK SLOPE PROTECTION. | KERN COUNTY NEAR EDISON AT NEUMARKLE ROAD UNDERCROSSING | 09/30/2020 | 1 (04/30/2012) | Details CEM-3701 Report |
| 208725 | Project ID: 208725 DEA: 060N4014 EFIS: 0613000086 | 06-KER-58-67.8 | CONSTRUCT STEEL SHEET PILING AND ROCK SLOPE PROTECTION. | KERN COUNTY NEAR EDISON AT NEUMARKLE ROAD UNDERCROSSING | 10/22/2020 | 1 (07/19/2013) | Details CEM-3701 Report |
| 994872 | Project ID: 994872 DEA: 060X1604 EFIS: 0618000183 | 06-KER-58-R64.4/67.3 | HMA (TYPE A), RHMA-G, JPCP, CRCP & HIGH SPEED WEIGH-IN-MOTION SYSTEM. | KERN COUNTY NEAR EDISON FROM 0.2 MILE WEST OF TEJON HIGHWAY OVERCROSSING TO CALIENTE CREEK BRIDGE | 05/09/2025 | 1 (06/14/2023) | Details CEM-3701 Report |
| 6945 | Project ID: 6945 DEA: 060N1704 EFIS: 0600020444 | 06-KER-99-R43.9/49.3 | REPLACE CONCRETE SLABS AND GRIND CONCRETE PAVEMENT. | KERN COUNTY NEAR FAMOSO AND IN MCFARLAND FROM 0.4 MILE SOUTH OF ROUTE 46/99 SEPARATION TO SHERWOOD AVENUE OVERCROSSING | 05/08/2013 | 1 (06/25/2012) | Details CEM-3701 Report |
| 211982 | Project ID: 211982 DEA: 060K4604 EFIS: 0612000105 | 06-KER-46,99-57.3/57.8,43.9/44.6 | REALIGN ROADWAY AND CONSTRUCT NEW BRIDGE. | KERN COUNTY NEAR FAMOSO ON ROUTE 46 FROM 0.5 MILE WEST OF ROUTE 46/99 SEPARATION TO 0.1 MILE EAST OF ROUTE 46/99 SEPARATION AND ON ROUTE 99 FROM 0.4 MILE SOUTH OF ROUTE 46/99 SEPARATION TO 0.3 MILE NORTH OF ROUTE 46/99 SEPARATION | 10/17/2019 | 1 (06/26/2017) | Details CEM-3701 Report |
