Projects

To search for a project, enter filter criteria in the appropriate input field below. If a project is not listed, please contact a METS Representative for assistance.
Displaying 11691-11700 of 17620 results.
Project IDProject IdentifiersDIST-CO-RTE-PMWork DescriptionLocation DescriptionCaltrans Closeout DateMETS Service LevelActions
     
6034Project ID: 6034
DEA: 11233204
11-SD-15-R8.9EMERGENCY EARTHWORKIN SAN DIEGO COUNTY (SINK HOLE) 1 (03/15/2016)Details CEM-3701 Report
6033Project ID: 6033
DEA: 11232304
EFIS: 1100000153
11-SD-125-0.0/9.6COSNTRUCT 8 LANE FWY AND INTERCHANGE WITH HOV 08/17/20212 (07/09/2021)Details CEM-3701 Report
6032Project ID: 6032
DEA: 11231504
EFIS: 1100000151
11-SD-76,78-R28.0/30.1WIDENING AND REALIGNMENT OF SR -76 & I-15 @ RTE 76 08/17/20212 (07/09/2021)Details CEM-3701 Report
6031Project ID: 6031
DEA: 11229024
11-IMP-98-45.2REHABILITATE PAVEMENTIN IMPERIAL COUNTY ABOUT 19 KM EAST OF CALEXICO FROM 0.2 KM WEST TO 1.1 KM EAST OF EAST HIGHLINE CANALBRIDGE07/20/20071 (11/04/2008)Details CEM-3701 Report
6030Project ID: 6030
DEA: 11224314
11-SD-5-36.5CONSTRUCT AUXILIARY LANESIN SAN DIEGO COUNTY IN SOLANA BEACH FROM 1.5 KM SOUTH TO 0.4 KM NORTH OF LOMAS SANTA FE UNDERCROSSING08/02/2010NOT VERIFIEDDetails CEM-3701 Report
6029Project ID: 6029
DEA: 11207914
11-SD-5-R 16.0RESURFACE EXISTING HIGHWAYIN SAN DIEGO COUNTY IN SAN DIEGO AT VARIOUS LOCATIONS08/02/20101 (08/02/2010)Details CEM-3701 Report
6028Project ID: 6028
DEA: 11183644
11-SD-78-10.5CONSTRUCT NEW INTERCHANGEIN SAN DIEGO COUNTY IN SAN MARCOS FROM 1.1 KM WEST TO 0.6 KM EAST OFLAS POSAS UNDERCROSSING08/02/20101 (08/02/2010)Details CEM-3701 Report
6027Project ID: 6027
DEA: 11176424
11-SD-94-17.5PLANTING AND IRRIGATIONIN SAN DIEGO COUNTY NEAR JAMUL FROM RANCHO MIGUEL ROAD TO 0.3 KM EAST OF RANCHO MIGUEL ROAD08/02/20101 (08/02/2010)Details CEM-3701 Report
6026Project ID: 6026
DEA: 11172894
11-SD-56- 2.2PLANTING AND IRRIGATIONIN SAN DIEGO COUNTY IN SAN DIEGOFROM 0.6 KM EAST OF CARMELCOUNTRY ROAD OVERCROSSING TO 0.3 KM EAST OF CAMINO DEL SUR UNDERCROSSING08/02/20101 (08/02/2010)Details CEM-3701 Report
6025Project ID: 6025
DEA: 11172834
11-SD-56-.6CONST 4-LANE FWY & INTERCHANGEDUMMY EA IN CAS - PER DISTRICT REQUESTCONSTRUCTION OF STATE ROUTE 56 FROM 0.6 KM WEST OF CARMEL MT. ROAD TO 0.6 KM EST OF BLACK MT ROAD (KP 10.1/11.9) (KP 10.1/11.9) 1 (09/20/2005)Details CEM-3701 Report