Projects

To search for a project, enter filter criteria in the appropriate input field below. If a project is not listed, please contact a METS Representative for assistance.
Displaying 11691-11700 of 18772 results.
Project IDProject IdentifiersDIST-CO-RTE-PMWork DescriptionLocation DescriptionCaltrans Closeout DateMETS Service LevelActions
     
1000024Project ID: 1000024
DEA: 061G1204
EFIS: 0623000149
06-KER-178-13.6/24.6HOT MIX ASPHALT, PRECOATED AGGREGATE AND ASPHALT-RUBBER BINDER.KERN COUNTY NEAR BAKERSFIELD FROM 1.9 MILES EAST OF COTTONWOOD CREEK BRIDGE TO 2.0 MILES WEST OF DEMOCRAT ROAD01/31/20251 (01/08/2024)Details CEM-3701 Report
209098Project ID: 209098
DEA: 060Q9704
EFIS: 0614000042
06-KER-178-15.2/16.7Repair Roadway/SlopeKern County near Bakersfield from 5.6 miles east of the 178/184 Jct to 7.1 miles east of the 178/184 at Ker 15.2/16.712/14/20201 (09/06/2013)Details CEM-3701 Report
211297Project ID: 211297
DEA: 060S6504
EFIS: 0614000207
06-KER-5-36.1/41.2CONSTRUCT HIGH TENSION CABLE BARRIER.KERN COUNTY NEAR BAKERSFIELD FROM BUENA VISTA CANAL ROAD OVERCROSSING TO ROUTE 5/43 SEPARATION04/16/20211 (10/04/2016)Details CEM-3701 Report
212953Project ID: 212953
DEA: 060U9904
EFIS: 0616000084
06-KER-65-1.6/25.2INSTALL CENTERLINE AND SHOULDER RUMBLE STRIPS.KERN COUNTY NEAR BAKERSFIELD FROM IMPERIAL STREET TO TULARE COUNTY LINE12/07/20181 (06/05/2018)Details CEM-3701 Report
7777Project ID: 7777
DEA: 060G8404
EFIS: 0600020166
COOP: 061474A1
06-KER-99-27.0/R28.4CONSTRUCT INSIDE LANES, SHOULDERS, AND CONCRETE BARRIER.KERN COUNTY NEAR BAKERSFIELD FROM ROUTE 204/99 SEPARATION TO BEARDSLEY CANAL12/19/20141 (12/10/2012)Details CEM-3701 Report
1001616Project ID: 1001616
DEA: 061C0604
EFIS: 0621000014
06-KER-223-1.8/10.4FULL DEPTH RECYCLE AND V-DITCHES.KERN COUNTY NEAR BAKERSFIELD FROM ROUTE 223/5 SEPARATION TO 0.1 MILE WEST OF ROUTE 223/99 SEPARATION 1 (10/06/2025)Details CEM-3701 Report
208641Project ID: 208641
DEA: 060Q3604
06-KER-119-19.7/30.4COLD IN-PLACE RECYCLING AND PAVEMENT RESURFACING.KERN COUNTY NEAR BAKERSFIELD FROM ROUTE 5/119 SEPARATION TO WIBLE ROAD10/08/20141 (08/22/2013)Details CEM-3701 Report
213445Project ID: 213445
DEA: 060T2004
EFIS: 0615000035
06-KER-99-0.0/11.2PAVEMENT REHABILITATION (2R)KERN COUNTY NEAR BAKERSFIELD FROM ROUTE 5/99 SEPARATION TO 0.3 MILE NORTH OF OLD US 99 OVERCROSSING05/16/20241 (01/09/2019)Details CEM-3701 Report
8019Project ID: 8019
DEA: 060N1504
EFIS: 0600020439
06-KER-58-R59.6/R64.4,67.0/77.3OVERLAY WITH HOT MIX ASPHALT (BONDED WEARING COURSE)KERN COUNTY NEAR BAKERSFIELD FROM ROUTE 58/184 SEPARATION TO 0.2 MILE WEST OF TEJON HIGHWAY OVERCROSSING AND FROM 0.3 MILE WEST OF CALIENTE CREEK BRIDGE TO 0.2 MILE EAST OF BEALVILLE ROAD10/08/20141 (12/10/2012)Details CEM-3701 Report
3207Project ID: 3207
DEA: 060H2504
06-KER-178-13.7/16.0,20.0/27.2PLACE RUBBERIZED HOT MIX ASPHALT ON EXISTING PAVEMENT.KERN COUNTY NEAR BAKERSFIELD FROM SIDEHILL VIADUCT TO 0.8 MILE EAST OF EDISON POWERHOUSE AND FROM 0.1 MILE WEST OF UPPER RICHBAR CAMPGROUND TO 0.5 MILE EAST OF DEMOCRAT SPRINGS ROAD03/09/20121 (04/27/2011)Details CEM-3701 Report