Projects
To search for a project, enter filter criteria in the appropriate input field below. If a project is not listed, please contact a METS Representative for assistance.Displaying 11691-11700 of 18772 results.
| Project ID | Project Identifiers | DIST-CO-RTE-PM | Work Description | Location Description | Caltrans Closeout Date | METS Service Level | Actions |
|---|---|---|---|---|---|---|---|
| 1000024 | Project ID: 1000024 DEA: 061G1204 EFIS: 0623000149 | 06-KER-178-13.6/24.6 | HOT MIX ASPHALT, PRECOATED AGGREGATE AND ASPHALT-RUBBER BINDER. | KERN COUNTY NEAR BAKERSFIELD FROM 1.9 MILES EAST OF COTTONWOOD CREEK BRIDGE TO 2.0 MILES WEST OF DEMOCRAT ROAD | 01/31/2025 | 1 (01/08/2024) | Details CEM-3701 Report |
| 209098 | Project ID: 209098 DEA: 060Q9704 EFIS: 0614000042 | 06-KER-178-15.2/16.7 | Repair Roadway/Slope | Kern County near Bakersfield from 5.6 miles east of the 178/184 Jct to 7.1 miles east of the 178/184 at Ker 15.2/16.7 | 12/14/2020 | 1 (09/06/2013) | Details CEM-3701 Report |
| 211297 | Project ID: 211297 DEA: 060S6504 EFIS: 0614000207 | 06-KER-5-36.1/41.2 | CONSTRUCT HIGH TENSION CABLE BARRIER. | KERN COUNTY NEAR BAKERSFIELD FROM BUENA VISTA CANAL ROAD OVERCROSSING TO ROUTE 5/43 SEPARATION | 04/16/2021 | 1 (10/04/2016) | Details CEM-3701 Report |
| 212953 | Project ID: 212953 DEA: 060U9904 EFIS: 0616000084 | 06-KER-65-1.6/25.2 | INSTALL CENTERLINE AND SHOULDER RUMBLE STRIPS. | KERN COUNTY NEAR BAKERSFIELD FROM IMPERIAL STREET TO TULARE COUNTY LINE | 12/07/2018 | 1 (06/05/2018) | Details CEM-3701 Report |
| 7777 | Project ID: 7777 DEA: 060G8404 EFIS: 0600020166 COOP: 061474A1 | 06-KER-99-27.0/R28.4 | CONSTRUCT INSIDE LANES, SHOULDERS, AND CONCRETE BARRIER. | KERN COUNTY NEAR BAKERSFIELD FROM ROUTE 204/99 SEPARATION TO BEARDSLEY CANAL | 12/19/2014 | 1 (12/10/2012) | Details CEM-3701 Report |
| 1001616 | Project ID: 1001616 DEA: 061C0604 EFIS: 0621000014 | 06-KER-223-1.8/10.4 | FULL DEPTH RECYCLE AND V-DITCHES. | KERN COUNTY NEAR BAKERSFIELD FROM ROUTE 223/5 SEPARATION TO 0.1 MILE WEST OF ROUTE 223/99 SEPARATION | 1 (10/06/2025) | Details CEM-3701 Report | |
| 208641 | Project ID: 208641 DEA: 060Q3604 | 06-KER-119-19.7/30.4 | COLD IN-PLACE RECYCLING AND PAVEMENT RESURFACING. | KERN COUNTY NEAR BAKERSFIELD FROM ROUTE 5/119 SEPARATION TO WIBLE ROAD | 10/08/2014 | 1 (08/22/2013) | Details CEM-3701 Report |
| 213445 | Project ID: 213445 DEA: 060T2004 EFIS: 0615000035 | 06-KER-99-0.0/11.2 | PAVEMENT REHABILITATION (2R) | KERN COUNTY NEAR BAKERSFIELD FROM ROUTE 5/99 SEPARATION TO 0.3 MILE NORTH OF OLD US 99 OVERCROSSING | 05/16/2024 | 1 (01/09/2019) | Details CEM-3701 Report |
| 8019 | Project ID: 8019 DEA: 060N1504 EFIS: 0600020439 | 06-KER-58-R59.6/R64.4,67.0/77.3 | OVERLAY WITH HOT MIX ASPHALT (BONDED WEARING COURSE) | KERN COUNTY NEAR BAKERSFIELD FROM ROUTE 58/184 SEPARATION TO 0.2 MILE WEST OF TEJON HIGHWAY OVERCROSSING AND FROM 0.3 MILE WEST OF CALIENTE CREEK BRIDGE TO 0.2 MILE EAST OF BEALVILLE ROAD | 10/08/2014 | 1 (12/10/2012) | Details CEM-3701 Report |
| 3207 | Project ID: 3207 DEA: 060H2504 | 06-KER-178-13.7/16.0,20.0/27.2 | PLACE RUBBERIZED HOT MIX ASPHALT ON EXISTING PAVEMENT. | KERN COUNTY NEAR BAKERSFIELD FROM SIDEHILL VIADUCT TO 0.8 MILE EAST OF EDISON POWERHOUSE AND FROM 0.1 MILE WEST OF UPPER RICHBAR CAMPGROUND TO 0.5 MILE EAST OF DEMOCRAT SPRINGS ROAD | 03/09/2012 | 1 (04/27/2011) | Details CEM-3701 Report |
