Projects

To search for a project, enter filter criteria in the appropriate input field below. If a project is not listed, please contact a METS Representative for assistance.
Displaying 11671-11680 of 17620 results.
Project IDProject IdentifiersDIST-CO-RTE-PMWork DescriptionLocation DescriptionCaltrans Closeout DateMETS Service LevelActions
     
6054Project ID: 6054
DEA: 11244304
11-SD-78-12.91-15.49To Construct Two Railroad Bridges for the Sprinter Commuter Rail Project in City of San Marcos NCTD San Marcos Loop Br. No. 57-1105, Br. No. 57-1106State Highway right of way in the County of San Diego, City of San Marcos, on State Route 78, post mile 12.91-15.49 1 (10/26/2005)Details CEM-3701 Report
6053Project ID: 6053
DEA: 11243204
11-SD-8-R49.0Safety Roadside Rest Area Restoration/ada Compliance. 06/04/20121 (10/26/2009)Details CEM-3701 Report
6052Project ID: 6052
DEA: 11241924
11-SD-78-20.7/21.3WIDEN SHOULDERIN SAN DIEGO COUNTY NEAR ESCONDIDOFROM SUMMIT DRIVE TO FLORA VISTADRIVE08/02/20101 (08/02/2010)Details CEM-3701 Report
6051Project ID: 6051
DEA: 11241614
EFIS: 1100020418
11-SD-15-21.7/23.9CAMINO DEL NORTE WIDENINGIN SAN DIEGO COUNTY 1 (04/06/2007)Details CEM-3701 Report
6050Project ID: 6050
DEA: 11241504
11-SD-163- 8.3WIDEN BRIDGE AND RECONSTRUCT RAMPSIN SAN DIEGO COUNTY IN SAN DIEGOFROM 0.6 KM SOUTH TO 0.3 KM NORTH OF CLAIREMONT MESA BOULEVARDOVERCROSSING08/02/20101 (08/02/2010)Details CEM-3701 Report
6049Project ID: 6049
DEA: 11241104
11-IMP-86-19.5RUBBER ASPHALT CHIP SEALIN IMPERIAL COUNTY IN BRAWLEY AND NEAR WESTMORLAND FROM 0.5 KM NORTHOF LEGION ROAD TO SOUTH JUNCTIONROUTE 78 AND FROM LONE TREE WASH TO SAN FELIPE CREEK08/02/20101 (08/02/2010)Details CEM-3701 Report
6048Project ID: 6048
DEA: 11240304
11-SD-5-R 10.3Install Changeable Message Signs. 07/20/20071 (11/04/2008)Details CEM-3701 Report
6047Project ID: 6047
DEA: 11240214
EFIS: 1100000166
11-SD--   1 (11/24/2020)Details CEM-3701 Report
6046Project ID: 6046
DEA: 11240104
11-SD-5-R10.0/R20.0PAVEMENT REHABILITATION.SAN DIEGO COUNTY IN NATIONAL CITY AND SAN DIEGO FROM 24TH STREET UNDERCROSSING TO 0.1 MILE SOUTH OF ROUTE 8/5 SEPARATION AND OVERHEAD01/06/20121 (01/09/2012)Details CEM-3701 Report
6045Project ID: 6045
DEA: 112396A4
EFIS: 1100020022
11-SD-5-R81.0/R85.0PERFORM HIGHWAY PLANTING AND IRRIGATION  1 (02/23/2010)Details CEM-3701 Report