Projects
To search for a project, enter filter criteria in the appropriate input field below. If a project is not listed, please contact a METS Representative for assistance.Displaying 11651-11660 of 18772 results.
| Project ID | Project Identifiers | DIST-CO-RTE-PM | Work Description | Location Description | Caltrans Closeout Date | METS Service Level | Actions |
|---|---|---|---|---|---|---|---|
| 3064 | Project ID: 3064 DEA: 060AA004 | 06-KER-5701- | Installation of Photovoltaic Panels | KERN COUNTY IN BAKERSFIELD AT THE BAKERSFIELD SUBSHOP AT 1200 OLIVE DRIVE | 04/27/2011 | 1 (01/12/2011) | Details CEM-3701 Report |
| 210480 | Project ID: 210480 DEA: 060E3404 EFIS: 0612000122 | 06-KER-99-21.7/24.7 | CONSTRUCT MAINTENANCE VEHICLE PULLOUTS AND GORE AREA TEXTURED PAVING. | KERN COUNTY IN BAKERSFIELD AT VARIOUS LOCATIONS FROM 0.1 MILE NORTH OF PLANZ ROAD OVERCROSSING TO 0.1 MILE NORTH OF CALIFORNIA AVENUE UNDERCROSSING | 04/18/2018 | 1 (07/21/2015) | Details CEM-3701 Report |
| 210587 | Project ID: 210587 DEA: 060N9604 EFIS: 0612000026 | 06-KER-204-5.4/6.7 | CLEAN AND PAINT EXISTING BRIDGE STRUCTURAL STEEL AND PLACE HMA OVERLAY | KERN COUNTY IN BAKERSFIELD AT VARIOUS LOCATIONS FROM STINE CANAL TO AIRPORT DRIVE UNDERCROSSING | 08/29/2017 | 1 (07/21/2015) | Details CEM-3701 Report |
| 7610 | Project ID: 7610 DEA: 060G8304 EFIS: 0600020165 | 06-KER-99-17.0/22.1 | WIDEN FREEWAY FROM 6 LANES TO 8 LANES WITH PCC AND HMA | KERN COUNTY IN BAKERSFIELD FROM 0.5 MILE SOUTH OF ROUTE 119 TO WILSON ROAD | 01/23/2015 | 1 (10/15/2012) | Details CEM-3701 Report |
| 213414 | Project ID: 213414 DEA: 060S4504 EFIS: 0614000155 | 06-KER-99-23.6/24.1,25.6 | INSTALL HIGHWAY LIGHTING. | KERN COUNTY IN BAKERSFIELD FROM BRUNDAGE LANE OVERCROSSING TO PLAM AVENUE AND AT ROUTE 58/99/178 SEPARATION | 06/19/2019 | 1 (09/25/2018) | Details CEM-3701 Report |
| 995036 | Project ID: 995036 DEA: 061E7704 EFIS: 0622000080 | 06-KER-204-2.1/4.6 | TRANSPORTATION ART, TRAFFIC STRIPE, IRRIGATION AND PLANTING WORK. | KERN COUNTY IN BAKERSFIELD FROM BRUNDAGE LANE TO M STREET | 05/09/2025 | 1 (08/07/2023) | Details CEM-3701 Report |
| 214659 | Project ID: 214659 DEA: 060U4904 EFIS: 0616000002 | 06-KER-204-5.1/6.7 | COLD PLANE AC PVMT, OVERLAY WITH HMA & RHMA, MODIFY SIGNAL & LIGHTING. | KERN COUNTY IN BAKERSFIELD FROM F STREET TO ROUTE 204/99 SEPARATION | 07/19/2021 | 1 (02/05/2020) | Details CEM-3701 Report |
| 213154 | Project ID: 213154 DEA: 060G8514 EFIS: 0614000009 | 06-KER-58-R52.4/R55.5 | REPLACE LANES AND SHOULDERS WITH CONTINUOUSLY REINFORCED CONCRETE. | KERN COUNTY IN BAKERSFIELD FROM ROUTE 58/99 SEPARATION TO COTTONWOOD ROAD UNDERCROSSING | 11/29/2021 | 1 (06/05/2018) | Details CEM-3701 Report |
| 994144 | Project ID: 994144 DEA: 060W15V4 EFIS: 0619000107 | 06-KER-58,204-R53.4/R54.5,R0.0/4.6 | MODIFY SIGNAL AND LIGHTING SYSTEMS AND REPLACE CURB RAMPS. | KERN COUNTY IN BAKERSFIELD ON ROUTE 58 FROM SOUTH H STREET OVERCROSSING TO ROUTE 204 AND ON ROUTE 204 FROM ROUTE 58/204 SEPARATION TO L STREET | 05/09/2025 | 1 (07/28/2022) | Details CEM-3701 Report |
| 213444 | Project ID: 213444 DEA: 060Q2804 EFIS: 0613000051 | 06-KER-99,178-23.8/R28.4,0.1 | RECONSTRUCT LANES AND SHOULDERS WITH CRCP, MODIFYING ELECTRICAL SYSTEM | KERN COUNTY IN BAKERSFIELD ON ROUTE 99 FROM 0.3 MILE SOUTH OF PALM AVENUE OVERCROSSING TO BEARDSLEY CANAL BRIDGE AND ON ROUTE 178 AT ROUTE 99/178 SEPARATION | 05/11/2023 | 1 (12/13/2018) | Details CEM-3701 Report |
