Projects
To search for a project, enter filter criteria in the appropriate input field below. If a project is not listed, please contact a METS Representative for assistance.Displaying 11601-11610 of 18772 results.
| Project ID | Project Identifiers | DIST-CO-RTE-PM | Work Description | Location Description | Caltrans Closeout Date | METS Service Level | Actions |
|---|---|---|---|---|---|---|---|
| 1000819 | Project ID: 1000819 DEA: 09387704 EFIS: 0920000059 | 09-KER-58-M116.2/R142.9 | CONSTRUCT MIDWEST GUARDRAIL SYSTEMS AND MEDIAN TERMINALS. | KERN COUNTY AT VARIOUS LOCATIONS FROM BUSINESS ROUTE 58 OVERCROSSING TO BORON AVENUE OVERCROSSING | 09/11/2025 | 1 (12/04/2024) | Details CEM-3701 Report |
| 1000900 | Project ID: 1000900 DEA: 061G1804 EFIS: 0623000159 | 06-KER-5-Var | FURNISH AND PLACE POLYESTER CONCRETE OVERLAY. | KERN COUNTY AT VARIOUS LOCATIONS FROM GRAPEVINE CREEK BRIDGE TO KERN RIVER FLOOD CANAL BRIDGE | 1 (01/22/2025) | Details CEM-3701 Report | |
| 211586 | Project ID: 211586 DEA: 09387604 EFIS: 0920000058 | 09-KER-58-R90.7/M111.1 | MEDIAN TERMINAL SYSTEMS, CRASH CUSHIONS, AND MIDWEST GUARD RAIL. | KERN COUNTY AT VARIOUS LOCATIONS ON ROUTE 58 FROM ROUTE 202/58 SEPARATION TO ROUTE 14/ROUTE 58 SEPARATION | 01/06/2025 | 1 (10/31/2012) | Details CEM-3701 Report |
| 1001050 | Project ID: 1001050 DEA: 09397304 EFIS: 0924000044 | 09-KER-58-77.2/R138.9 | COLD PLANE AC PAVEMENT AND PLACE HMA (TYPE A). | KERN COUNTY FROM 0.3 MILE WEST OF HART FLAT UNDERCROSSING TO 2.6 MILES WEST OF BORON OVERCROSSING | 09/25/2025 | 1 (04/09/2025) | Details CEM-3701 Report |
| 214509 | Project ID: 214509 DEA: 060S4104 EFIS: 0614000140 MINOR: 06A2562 | 06--99-44.0/49.4 | Install shoulder rumble strip | Kern County from 0.4 mile south of Junction 46/99 Seperation to Sherwood Avenue Overcrossing | 11/29/2022 | 1 (01/31/2020) | Details CEM-3701 Report |
| 1000913 | Project ID: 1000913 DEA: 061G7804 EFIS: 0624000164 | 06-KER-5-54.2/62.5 | COLD PLANE AC PAVEMENT, PLACE HMA (TYPE A) AND RHMA (OGFC). | KERN COUNTY FROM 2.0 MILES NORTH OF ROUTE 5/58 SEPARATION TO 4.5 MILES NORTH OF ROWLEE ROAD OVERCROSSING | 12/02/2025 | 1 (02/11/2025) | Details CEM-3701 Report |
| 1000008 | Project ID: 1000008 DEA: 061F8404 EFIS: 0623000102 | 06-KER-33-R60.2/73.7 | COLD PLANE WITH HOT MIX ASPHALT AND RUBBERIZED HOT MIX ASPHALT. | KERN COUNTY FROM ROUTE 46 TO KINGS COUNTY LINE | 12/04/2024 | 1 (01/08/2024) | Details CEM-3701 Report |
| 3186 | Project ID: 3186 DEA: 060G4704 MINOR: 06A1206 | 06-KER-204-10.6 | INSTAL METAL BEAM GUARD RAILING | KERN COUNTY IN AND NEAR BAKERSFIELD AT DAVID ROAD OVERCROSSING AND PACHECO ROAD UNDERCROSSING | 04/21/2011 | NOT VERIFIED | Details CEM-3701 Report |
| 209878 | Project ID: 209878 DEA: 060Q5804 EFIS: 0613000305 | 06-KER-58,99-Var | REPLACE CONDUCTORS AND SECURE SERVICE EQUIPMENT ENCL AND PULL BOXES. | KERN COUNTY IN AND NEAR BAKERSFIELD AT VARIOUS LOCATIONS | 02/23/2016 | 1 (12/29/2014) | Details CEM-3701 Report |
| 213838 | Project ID: 213838 DEA: 060E3204 EFIS: 0613000037 | 06-KER-178-R1.7/R6.9 | CONSTRUCT ROCK BLANKET AT GORE AND MAINTENANCE VEHICLE PULLOUTS. | KERN COUNTY IN AND NEAR BAKERSFIELD AT VARIOUS LOCATIONS FROM M STREET TO 0.1 MILE EAST OF FAIRFAX ROAD | 08/06/2020 | 1 (12/27/2018) | Details CEM-3701 Report |
