Projects
To search for a project, enter filter criteria in the appropriate input field below. If a project is not listed, please contact a METS Representative for assistance.Displaying 11601-11610 of 18861 results.
| Project ID | Project Identifiers | DIST-CO-RTE-PM | Work Description | Location Description | Caltrans Closeout Date | METS Service Level | Actions |
|---|---|---|---|---|---|---|---|
| 212275 | Project ID: 212275 DEA: 09368304 EFIS: 0917000035 | 09-KER,INY-178,395-Var | COLD PLANE ASPHALT CONCRETE PAVEMENT AND REPLACE WITH HOT MIX ASPHALT. | KERN AND INYO COUNTIES AT VARIOUS LOCATIONS | 08/10/2018 | 1 (03/27/2018) | Details CEM-3701 Report |
| 214257 | Project ID: 214257 DEA: 09372704 EFIS: 0917000054 | 09-KER,INY-58,395-Var | CONSTRUCT ELECTRIC VEHICLE CHARGING STATION SYSTEM AND PLACE PCC. | KERN AND INYO COUNTIES AT VARIOUS LOCATIONS | 01/14/2021 | 1 (12/12/2019) | Details CEM-3701 Report |
| 3261 | Project ID: 3261 DEA: 060J4904 | 06-KER,KIN-5-73.0/87.0,0.0/10.0 | PLACE RUBBERIZED SLURRY SEAL AND FOG SEAL SHOULDER TREATMENT. | KERN AND KINGS COUNTIES ABOUT 6 MILES SOUTH OF KETTLEMAN CITY FROM ROUTE 46/5 SEPARATION TO 2.9 MILES NORTH OF WATERLOO AVENUE OVERCROSSING | 12/13/2012 | 1 (01/12/2011) | Details CEM-3701 Report |
| 208665 | Project ID: 208665 DEA: 060M6204 EFIS: 0600020509 | 06-KER,KIN-5,14,58,202,204-Var | REMOVE DECK SURFACE, PLACE DECK SEALS, APPROACH SLAB AND JOINT SEALS. | KERN AND KINGS COUNTIES AT VARIOUS LOCATIONS | 10/22/2020 | 1 (08/22/2013) | Details CEM-3701 Report |
| 214592 | Project ID: 214592 DEA: 060U2404 EFIS: 0615000294 | 06-KER,KIN-99,198,204-Var | UPGRADE PUMP PLANTS. | KERN AND KINGS COUNTIES AT VARIOUS LOCATIONS | 03/02/2022 | 1 (01/31/2020) | Details CEM-3701 Report |
| 214644 | Project ID: 214644 DEA: 061A2304 EFIS: 0619000210 | 06-KER,KIN-33-40.0/44.2,7.8/12.0 | PLACE RHMA-G AND HMA. | KERN AND KINGS COUNTIES FROM 0.4 MILE NORTH OF CYMRIC ROAD (NORTH) TO 0.2 MILE SOUTH OF 7TH STANDARD ROAD AND FROM ROUTE 41 TO 0.3 MILE NORTH OF UTICA AVENUE | 04/16/2021 | 1 (01/31/2020) | Details CEM-3701 Report |
| 212271 | Project ID: 212271 DEA: 060T7904 EFIS: 0615000230 | 06-KER,KIN-41-0.0/5.0,11.6/16.1 | RHMA-GAP GRADED (BONDED WEARING COURSE) PAVING. | KERN AND KINGS COUNTIES NEAR CHOLAME FROM SAN LUIS OBISPO COUNTY LINE TO KINGS COUNTY LINE AND NEAR KETTLEMAN CITY FROM UTICA AVENUE TO 0.5 MILE SOUTH OF ROUTE 5/41 SEPARATION | 01/02/2018 | NOT VERIFIED | Details CEM-3701 Report |
| 215023 | Project ID: 215023 DEA: 060U4704 EFIS: 0615000301 | 06-KER,KIN-5-81.7/87.0,0.0/0.3 | CONSTRUCT CRCP, JPCP AND INSTALL TRAFFIC MONITORING STATIONS. | KERN AND KINGS COUNTIES NEAR KETTELMAN CITY FROM 0.6 MILE SOUTH OF TWISSELMAN ROAD OVERCROSSING TO 0.3 MILE NORTH OF KERN/KINGS COUNTY LINE | 06/27/2023 | 1 (06/17/2020) | Details CEM-3701 Report |
| 208622 | Project ID: 208622 DEA: 060P7304 EFIS: 0612000248 | 06-KER,KIN-58,269-15.4/21.7,0.0/5.6 | COLD IN-PLACE RECYCLING, COLD PLANE AND OVERLAY WITH HOT MIX ASPHALT. | KERN AND KINGS COUNTIES NEAR MCKITTRICK ON ROUTE 58 FROM 0.1 MILE EAST OF ROUTE 33 TO 6.5 MILES EAST OF ROUTE 33 AND NEAR AVENAL ON ROUTE 269 FROM ROUTE 33 TO FRESNO COUNTY LINE | 10/08/2014 | NOT VERIFIED | Details CEM-3701 Report |
| 214661 | Project ID: 214661 DEA: 09380704 EFIS: 0919000056 | 09-KER,MNO-178,395-VARIOUS | ASPHALT RUBBER CHIP SEAL AND SCRUB SEAL. | KERN AND MONO COUNTIES AT VARIOUS LOCATIONS | 10/09/2020 | 1 (04/23/2020) | Details CEM-3701 Report |
