Projects
To search for a project, enter filter criteria in the appropriate input field below. If a project is not listed, please contact a METS Representative for assistance.Displaying 11531-11540 of 18861 results.
| Project ID | Project Identifiers | DIST-CO-RTE-PM | Work Description | Location Description | Caltrans Closeout Date | METS Service Level | Actions |
|---|---|---|---|---|---|---|---|
| 214794 | Project ID: 214794 DEA: 044Q2104 EFIS: 0419000360 | 04-ALA-84-12.5 | REPAIR EXISTING ATTENUATOR DAMAGED BY STORMS | Alameda County | 03/18/2025 | 1 (10/19/2020) | Details CEM-3701 Report |
| 1000992 | Project ID: 1000992 DEA: 040X5704 EFIS: 0424000142 | 04-ALA,SON-12,80,580,880-Var | REPLACE PAVEMENT DELINEATION, COLD PLANE AC PAVEMENT, & PLACE HMA. | ALAMEDA AND SONOMA COUNTIES AT VARIOUS LOCATIONS | 1 (03/18/2025) | Details CEM-3701 Report | |
| 993148 | Project ID: 993148 DEA: 042K7904 EFIS: 0417000023 COOP: NONE | 04-ALA,SOL-80,238and580-var | INSTALL HIGHWAY PLANTING AND IRRIGATION SYSTEMS. | ALAMEDA AND SOLANO COUNTIES AT VARIOUS LOCATIONS | 01/30/2026 | 1 (08/17/2021) | Details CEM-3701 Report |
| 7544 | Project ID: 7544 DEA: 04153204 EFIS: 0400000426 | 04-SCL,SCL-680-0.0/0.1,0.1/9.9 | WIDEN RAMPS, AND INSTALL TRAFFIC OPERATIONS SYSTEM. | ALAMEDA AND SANTA CLARA COUNTIES IN MILPITAS AND SAN JOSE FROM ROUTE 280-680/ 101 SEPARATION TO SCOTT CREEK ROAD UNDERCROSSING | 06/27/2016 | 1 (10/08/2012) | Details CEM-3701 Report |
| 7344 | Project ID: 7344 DEA: 042G5904 EFIS: 0412000003 | 04-ALA,SCL-85,101,880-44.0,19.9,20.8 | REPLACE DAMAGED OVERHEAD SIGNS. | ALAMEDA AND SANTA CLARA COUNTIES AT VARIOUS LOCATIONS | 03/20/2013 | 1 (09/04/2012) | Details CEM-3701 Report |
| 214407 | Project ID: 214407 DEA: 042G7304 EFIS: 0400021202 | 04-ALA,SCL-80,85,580-Varies | REPLACE HMA & MINOR CONCRETE, & MODIFY ELECTRICAL SYSTEM. | ALAMEDA AND SANTA CLARA COUNTIES AT VARIOUS LOCATIONS | 01/13/2023 | 1 (09/16/2019) | Details CEM-3701 Report |
| 993283 | Project ID: 993283 DEA: 044J9804 EFIS: 0416000036 | 04-ALA,SCL-80,880-Var | CONSTRUCT STRUCTURAL CONCRETE CULVERT & MAINTENANCE VEHICLE PULLOUT. | ALAMEDA AND SANTA CLARA COUNTIES AT VARIOUS LOCATIONS | 04/11/2023 | 1 (10/04/2021) | Details CEM-3701 Report |
| 1000709 | Project ID: 1000709 DEA: 041Y6904 EFIS: 0423000015 COOP: NONE | 04-ALA,ALA-92-14.4/18.8 | ALAMEDA & SAN MATEO HAYWARD TRESTLE REPAIR AND HIGH RISE PIER REPAIR. | ALAMEDA AND SAN MATEO COUNTIES AT VARIOUS LOCATIONS FROM 7.0 MILES WEST OF TOLL PLAZA TO 0.2 MILE WEST OF TOLL PLAZA | 1 (04/10/2025) | Details CEM-3701 Report | |
| 211538 | Project ID: 211538 DEA: 043G59U4 EFIS: 0415000066 | 04-ALA-205-0.0/1.004-Ala-580-0.0/8.0,26.1/30.310-SJ-580-13.5/15.4 | HMA PAVING, REPLACE APPROACH AND PCC SLABS, PRECAST CONCRETE PAVEMENT. | ALAMEDA AND SAN JOAQUIN COUNTIES ON ROUTE 580 FROM PATTERSON PASS ROAD OVERCROSSING TO GREENVILLE ROAD OVERHEAD AND FROM EDEN CANYON ROAD UNDERCROSSING TO STROBRIDGE AVENUE UNDERCROSSING ON ROUTE 205 FROM SAN JOAQUIN COUNTY LINE TO MIDWAY ROAD UNDERCROSSI | 12/17/2019 | 1 (09/02/2016) | Details CEM-3701 Report |
| 1000568 | Project ID: 1000568 DEA: 043J2604 EFIS: 0415000110 | 04-ALA,CC-80,680-5.9/6.4,16.9/17.1 | INSTALL CB, WROUGHT IRON FENCE, MODIFY LIGHTING SYSTEMS AND HMA. | ALAMEDA AND CONTRA COSTA COUNTIES IN BERKELEY AND PLEASANT HILL ON ROUTE 80 FROM UNIVERSITY AVENUE OVERCROSSING TO GILMAN STREET UNDERCROSSING AND ON ROUTE 680 FROM OAK PARK BOULEVARD OVERCROSSING TO CONTRA COSTA BOULEVARD OVERCROSSING | 1 (10/07/2024) | Details CEM-3701 Report |
