Projects
To search for a project, enter filter criteria in the appropriate input field below. If a project is not listed, please contact a METS Representative for assistance.Displaying 11531-11540 of 19000 results.
| Project ID | Project Identifiers | DIST-CO-RTE-PM | Work Description | Location Description | Caltrans Closeout Date | METS Service Level | Actions |
|---|---|---|---|---|---|---|---|
| 7578 | Project ID: 7578 DEA: 010A9804 EFIS: 0100020451 MINOR: 01A1316 | 01-MEN-101-45.67 | INSTALL PEDESTRIAN ACTIVATED FLASHING WARNING SIGNS, A LIGHTED CROSSWALK,A CONCRETE MEDIAN ISLAND AND ADA RAMPS AT THE INTERSECTION OF ROUTE 101 AND GREGORY LANE | IN WILLITS IN MENDOCINO COUNTY | 01/02/2015 | 1 (06/26/2013) | Details CEM-3701 Report |
| 1206 | Project ID: 1206 DEA: 033M3604 | 03-YOL-5-R8.9/R28.8 | REPLACE JOINT SEALS, APPROACH SLABS, POLYESTER OVERLAY BRIDGE DECK | In Yolo County at various locations from 0.6 mile North of 5/113 Separation to 0.3 mile South of County Line Road. | 10/25/2010 | 1 (12/21/2009) | Details CEM-3701 Report |
| 213270 | Project ID: 213270 EFIS: 0316000052 MINOR: 03A2702 | 03-SAC-50-0.7 | Remove existing MBGR, install midwest guardrail system and reconstruct right shoulder hinge point | In Yolo County in West Sacramento at the West Bound Route 80 Connector to Eastbound Route 50 | 08/24/2022 | 1 (06/28/2019) | Details CEM-3701 Report |
| 215604 | Project ID: 215604 DEA: 032G1704 EFIS: 0320000236 | 03-YOL-113-R10.2/R11.1 | Slab Replacement | In Yolo County on route 113 In Woodland From East Woodland Overhead To 0.4 Mile West of Route 113/5 Separation | 11/30/2021 | 1 (07/06/2021) | Details CEM-3701 Report |
| 212403 | Project ID: 212403 DEA: 033H1504 EFIS: 0317000236 | 03-YOL-16-1.5-1.7, 1.5/1.7 | Install 670 feet of soldier pile wall | In Yolo County on Route 16 approx. 1.2 miles west of the Colusa/Yolo County line. | 06/27/2022 | 1 (07/31/2017) | Details CEM-3701 Report |
| 1202 | Project ID: 1202 DEA: 033M3204 | 03-YUB-65,70-VAR | Place Methacrylate And Polyester Overlay On Bridge Decks | In Yuba County at various locations | 12/17/2012 | 1 (12/21/2009) | Details CEM-3701 Report |
| 1249 | Project ID: 1249 DEA: 03401804 | 03-YUB-65-65 | IMPROVE TRAFFIC OPERATIONS | IN YUBA COUNTY IN WHEATLAND FROMMAIN STREET TO HOOPER STREET | 03/22/2011 | 1 (03/22/2011) | Details CEM-3701 Report |
| 1130 | Project ID: 1130 DEA: 033E2004 | 03-YUB-49-5.9 | SLOPE REPAIR | IN YUBA COUNTY NEAR CAMPTONVILLE AT 0.3 MILE NORTH OF CAMPTONVILLE ROAD | 03/22/2011 | 1 (03/22/2011) | Details CEM-3701 Report |
| 799 | Project ID: 799 DEA: 030A29U4 | 03-YUB-5715- | REMODEL MAINTENANCE STATIONS | IN YUBA COUNTY NEAR LINDA ATVARIOUS LOCATIONS | 10/20/2010 | NOT VERIFIED | Details CEM-3701 Report |
| 212203 | Project ID: 212203 DEA: 032H9504 EFIS: 0317000210 | 03-YUB-49-6.11/6.73, 6.11,6.73 | Construct Solider Pile Wall | In Yuba County on Rte 49 approximately 1.35 miles north of Camptonville Road | 08/06/2019 | 1 (09/18/2017) | Details CEM-3701 Report |
