Projects
To search for a project, enter filter criteria in the appropriate input field below. If a project is not listed, please contact a METS Representative for assistance.Displaying 11511-11520 of 19339 results.
| Project ID | Project Identifiers | DIST-CO-RTE-PM | Work Description | Location Description | Caltrans Closeout Date | METS Service Level | Actions |
|---|---|---|---|---|---|---|---|
| 213927 | Project ID: 213927 DEA: 040Q9704 EFIS: 0418000177 | 04-ALA-92-R2.8/6.4 | COLD PLANE AC PAVEMENT AND PLACE HMA (A). | ALAMEDA COUNTY IN HAYWARD FROM 0.2 MILE EAST OF TOLL STATION TO 92/880 CONNECTOR | 10/21/2019 | NOT VERIFIED | Details CEM-3701 Report |
| 209791 | Project ID: 209791 DEA: 042G3624 EFIS: 0413000221 | 04-ALA-92-R5.1/R5.8 | REPLACEMENT HIGHWAY PLANTING. | ALAMEDA COUNTY IN HAYWARD FROM 0.1 MILE WEST OF INDUSTRIAL BOULEVARD UNDERCROSSING TO HESPERIAN BOULEVARD OVERCROSSING | 07/06/2018 | 1 (11/26/2014) | Details CEM-3701 Report |
| 993584 | Project ID: 993584 DEA: 040Q4504 EFIS: 0418000101 | 04-ALA-92-6.5 | LANDSCAPE, ROCK SLOPE PROTECTION, CONCRETE BARRIER AND GUARD RAIL. | ALAMEDA COUNTY IN HAYWARD AT ROUTE 92/880 SEPARATION | 11/30/2023 | 1 (04/14/2022) | Details CEM-3701 Report |
| 212789 | Project ID: 212789 DEA: 044H5804 EFIS: 0413000162 | 04-ALA,-880-11.8/27.5.4 | ROADWAY SURFACING, PRECAST JOINT CONCRETE PAVEMENT AND ELECTRICALS | ALAMEDA COUNTY IN FREMONT, UNION CITY, HAYWARD, SAN LEANDRO AND OAKLAND FROM 0.4 MILE NORTH OF FREMONT BOULEVARD OVERCROSSING TO HIGH STREET UNDERCROSSING | 01/13/2023 | 1 (03/26/2018) | Details CEM-3701 Report |
| 1849 | Project ID: 1849 DEA: 04174414 | 04-ALA-84-19.5/19.9,20.5/21.2 | REALIGN AND IMPROVE SIGHT DISTANCE. | ALAMEDA COUNTY IN FREMONT, UNION CITY AND AT SUNOL RIDGE FROM 0.2 KM SOUTH OF ROSEWARNES UNDERPASS TO 0.1 KM NORTH OF PALOMARES ROAD | 12/16/2011 | 1 (04/01/2011) | Details CEM-3701 Report |
| 1000639 | Project ID: 1000639 DEA: 043Q8504 EFIS: 0419000272 | 04-ALA-84-10.8/18.0 | FLASHING BEACON SYSTEMS. | ALAMEDA COUNTY IN FREMONT, UNION CITY AND AT SUNOL FROM ROUTE 238 TO 0.1 MILE WEST OF ROUTE 680 | 1 (10/07/2024) | Details CEM-3701 Report | |
| 1000018 | Project ID: 1000018 DEA: 042Q7604 EFIS: 0419000046 | 04-ALA-238,680-0.7/0.8,M0.1 | RECTANGULAR RAPID FLASHING BEACON SYSTEMS, HMA, CURB RAMP AND SW. | ALAMEDA COUNTY IN FREMONT ON ROUTE 680 AT OFF-RAMP TO SCOTT CREEK ROAD AND ON ROUTE 238 AT MISSION BRIDGE COURT | 07/03/2026 | 1 (01/08/2024) | Details CEM-3701 Report |
| 1000250 | Project ID: 1000250 DEA: 040Y3904 EFIS: 0422000274 | 04-ALA-262-R0.0/R1.1 | COLD PLANE AC PAVEMENT AND PLACE RHMA-G. | ALAMEDA COUNTY IN FREMONT FROM ROUTE 880 TO ROUTE 680 | 09/05/2025 | 1 (06/03/2024) | Details CEM-3701 Report |
| 215005 | Project ID: 215005 DEA: 044J7504 EFIS: 0416000005 | 04-ALA-84-R0.73/3.06 | INSTALL OUTER SEPARATION BARRIERS Concrete barrier, shoulder widening, striping, cold plane and overlay. | ALAMEDA COUNTY IN FREMONT FROM 0.7 MILE NORTH OF SAN MATEO COUNTY LINE TO 0.1 MILE SOUTH OF TOLL PLAZA | 10/06/2025 | 1 (10/19/2020) | Details CEM-3701 Report |
| 7462 | Project ID: 7462 DEA: 041G2004 EFIS: 0400002017 | 04-ALA-880-4.5/4.9 | RESURFACING WITH HOT MIX ASPHALT (OPEN-GRADED) | ALAMEDA COUNTY IN FREMONT FROM 0.5 MILE NORTH OF FREMONT BOULEVARD OVERCROSSING TO 0.3 MILE NORTH OF AUTO MALL PARKWAY OVERCROSSING | 08/16/2013 | 1 (09/06/2012) | Details CEM-3701 Report |
