Projects

To search for a project, enter filter criteria in the appropriate input field below. If a project is not listed, please contact a METS Representative for assistance.
Displaying 11501-11510 of 18774 results.
Project IDProject IdentifiersDIST-CO-RTE-PMWork DescriptionLocation DescriptionCaltrans Closeout DateMETS Service LevelActions
     
212246Project ID: 212246
DEA: 053307A4
EFIS: 0514000027
05-SLO-46-49.7/54.6Cholame Segment 09/02/20251 (09/30/2019)Details CEM-3701 Report
212247Project ID: 212247
DEA: 010G8004
MINOR: 01A1727
01-MEN-1-78.0/83.5, 77.0/83.5Major Damage RestorationIn Mendocino County near West port from 0.3 mile south of Wages Creek Bridge #10-137 to Solider Point Viaduct #10-27104/12/20211 (03/21/2017)Details CEM-3701 Report
212248Project ID: 212248
Permit Numbers: 0415NMC0062 0417NRT0136 04176DP1354 04176RT1921
04-ALA-13-9.4/10.7Includes 5 pre-programmed improvedments from the City of Berkrlry Caldecott 4th Bore settlement.City Limit to Ashby / Tunnel /Domingo, Berkeley01/18/20191 (03/21/2017)Details CEM-3701 Report
212249Project ID: 212249
DEA: 11430104
EFIS: 1117000145
11-IMP-Var,VAR-Var, VARRock scaling, replace damaged roadway and repair failed slopes  1 (11/01/2016)Details CEM-3701 Report
212270Project ID: 212270
DEA: 060S6204
EFIS: 0614000183
06-KER,TUL,FRE,MAD-99-VariousINSTALL VEHICLE DETECTION SYSTEM.KERN, TULARE, FRESNO AND MADERA COUNTIES AT VARIOUS LOCATIONS12/07/2018NOT VERIFIEDDetails CEM-3701 Report
212251Project ID: 212251
Permit Numbers: 1215NMC0895 1216NRW0715 12176DP0223 12176DP0505 12176RT0518
12-ORA-241-14.6/14.6Interchange improvement at existing Route 241/Oso Parkway to add connection from county road Los Patrones within Caltrans Right of Way in the County of Orange. The work includes modifying signals at the on/off ramps to create a four way intersection plus signing and striping.All performed work shalLos Patrones Parkway, Unincorporated Orange08/22/20181 (03/22/2017)Details CEM-3701 Report
212252Project ID: 212252
DEA: 033F5604
EFIS: 0313000033
03-SUT,YUB-20-17.0/17.1,0.0/0.4INSTALL CAST-IN-STEEL SHELL CONCRETE PILE.SUTTER AND YUBA COUNTIES IN YUBA CITY AND MARYSVILLE AT THE FEATHER RIVER BRIDGE AND OVERHEAD01/25/20231 (04/27/2018)Details CEM-3701 Report
212253Project ID: 212253
DEA: 010H0304
EFIS: 0117000087
01-HUM-96-20.0/24.0, 0.83REPAIR SLIPOUTIN HUMBOLDT COUNTY NEAR WEITCHPEC FROM 3.0 MILES OF KLAMATH RIVER BRIDGE #04-0144 TO 0.6 MILE EAST OF WEITCHPEC ROAD01/08/20191 (04/24/2017)Details CEM-3701 Report
212254Project ID: 212254
DEA: 051H7804
EFIS: 0516000151
05-MON,MON-1-8.0/23.0, 8.0 / 23, 8.0-23.0Remove slide and slide material, restore roadway and facilities, provided traffic control 09/06/2019NOT VERIFIEDDetails CEM-3701 Report
212257Project ID: 212257
DEA: 032F0704
EFIS: 0300020457
03-BUT,GLE-5,99,162-VARUPGRADE OVERHEAD SIGNSBUTTE AND GLENN COUNTIES AT VARIOUS LOCATIONS04/23/20211 (09/15/2017)Details CEM-3701 Report