Projects
To search for a project, enter filter criteria in the appropriate input field below. If a project is not listed, please contact a METS Representative for assistance.Displaying 11501-11510 of 18774 results.
| Project ID | Project Identifiers | DIST-CO-RTE-PM | Work Description | Location Description | Caltrans Closeout Date | METS Service Level | Actions |
|---|---|---|---|---|---|---|---|
| 213169 | Project ID: 213169 DEA: 060W7504 EFIS: 0617000278 | 06-MAD,MPA-41,49-var | HMA RESURFACING AND DIGOUTS. | MADERA AND MARIPOSA COUNTIES AT VARIOUS LOCATIONS | 06/26/2019 | 1 (12/19/2018) | Details CEM-3701 Report |
| 1001176 | Project ID: 1001176 DEA: 042Q5204 EFIS: 0419000021 | 04-SOL-29-0.0/6.0 | HMA PVMT, MOD DRAINAGE, SIGNALS, SIDEWALKS, CURB RAMPS AND LANDSCAPE. | SOLANO COUNTY IN VALLEJO FROM 0.2 MILE NORTH OF ROUTE 80/ 29 SEPARATION TO NAPA COUNTY LINE | 1 (08/14/2025) | Details CEM-3701 Report | |
| 211538 | Project ID: 211538 DEA: 043G59U4 EFIS: 0415000066 | 04-ALA-205-0.0/1.004-Ala-580-0.0/8.0,26.1/30.310-SJ-580-13.5/15.4 | HMA PAVING, REPLACE APPROACH AND PCC SLABS, PRECAST CONCRETE PAVEMENT. | ALAMEDA AND SAN JOAQUIN COUNTIES ON ROUTE 580 FROM PATTERSON PASS ROAD OVERCROSSING TO GREENVILLE ROAD OVERHEAD AND FROM EDEN CANYON ROAD UNDERCROSSING TO STROBRIDGE AVENUE UNDERCROSSING ON ROUTE 205 FROM SAN JOAQUIN COUNTY LINE TO MIDWAY ROAD UNDERCROSSI | 12/17/2019 | 1 (09/02/2016) | Details CEM-3701 Report |
| 210209 | Project ID: 210209 DEA: 023E7714 EFIS: 0215000046 | 02-TRI-299-36.9/53.5 | HMA PAVING, ADA RAMPS, POLYESTER CONCRETE AND GUARDRAIL | TRINITY COUNTY AT AND NEAR JUNCTION CITY AND WEAVERVILLE FROM NORTH FORK TRINITY RIVER BRIDGE TO 0.1 MILE EAST OF INDUSTRIAL ROAD | 01/17/2018 | 1 (08/18/2015) | Details CEM-3701 Report |
| 215054 | Project ID: 215054 DEA: 021H9304 EFIS: 0216000146 | 02--- | HMA Paving | 10/29/2021 | 1 (07/24/2020) | Details CEM-3701 Report | |
| 1001371 | Project ID: 1001371 DEA: 024F90U4 EFIS: 0224000157 | 02-SIS-96-41.0/41.8 | HMA PAVEMENT, ELECTRICAL, LANDSCAPING AND DRAINAGE. | SISKIYOU COUNTY AT AND NEAR HAPPY CAMP FROM INDIAN CREEK BRIDGE TO 0.2 MILE EAST OF DAVIS ROAD | 1 (07/08/2025) | Details CEM-3701 Report | |
| 7266 | Project ID: 7266 DEA: 11406004 EFIS: 1100020412 | 11-SD-VAR-VAR | HMA PAVEMENT AND SIGNING AND STRIPING TO CURRENT ADA STANDARDS. | SAN DIEGO COUNTY AT VARIOUS LOCATIONS | 04/29/2013 | 1 (07/31/2012) | Details CEM-3701 Report |
| 1000636 | Project ID: 1000636 DEA: 024H03U4 EFIS: 0224000026 | 02-PLU-89-12.9/20.0,20.6/21.0 | HMA OVERLAY. | PLUMAS COUNTY IN AND NEAR GREENVILLE FROM 0.8 MILE SOUTH OF DIXIE CANYON ROAD TO WOLF CREEK BRIDGE AND FROM MILL STREET TO 0.4 MILE NORTH OF HILLSIDE DRIVE | 1 (09/24/2024) | Details CEM-3701 Report | |
| 209952 | Project ID: 209952 DEA: 081C3704 EFIS: 0812000302 | 08-RIV-95-L0.0/36.2 | HMA OVERLAY, UPGRADE CURB RAMP, AND UPGRADE METAL BEAM GUARD RAILING | RIVERSIDE COUNTY NEAR BLYTHE FROM 0.2 MILES SOUTH OF ROUTE 10/95 SEPARATION TO 0.7 MILE SOUTH OF LYE ROAD | 04/11/2017 | 1 (10/19/2015) | Details CEM-3701 Report |
| 210331 | Project ID: 210331 DEA: 010E5104 EFIS: 0114000096 | 01-TRI-299-0.0/8.0 | HMA OVERLAY, STRIPING | TRINITY COUNTY AT SALYER FROM SOUTH FORK TRINITY RIVER TO 0.3 MILE EAST OF GREY CREEK ROAD | 04/28/2016 | 1 (06/29/2015) | Details CEM-3701 Report |
