Projects
To search for a project, enter filter criteria in the appropriate input field below. If a project is not listed, please contact a METS Representative for assistance.Displaying 11451-11460 of 19503 results.
| Project ID | Project Identifiers | DIST-CO-RTE-PM | Work Description | Location Description | Caltrans Closeout Date | METS Service Level | Actions |
|---|---|---|---|---|---|---|---|
| 208835 | Project ID: 208835 DEA: 112T1724 EFIS: 1100020362 COOP: 6211(130) | 11-SD-5-R37.5/R39.8 | (Alternative Delivery) Design Phase, CMGC, San Elijo Highway Bridge Replacement. Replace the San Elijo lagoon highway bridge, construct HOV lanes, construct bike and pedestrian trails and bridge, build multi-use facility at Manchester Ave. See 11-2T2174 f | IN SAN DIEGO COUNTY IN SOLANA BEACH AND ENCINITAS FROM 0.1 MILE NORTH OF LOMAS SANTA FE DRIVE OVERCROSSING TO 0.2 MILE SOUTH OF BIRMINGHAM DRIVE OVERCROSSING | 1 (05/20/2016) | Details CEM-3701 Report | |
| 208833 | Project ID: 208833 DEA: 100V8204 EFIS: 1012000121 MINOR: 10A1504 | 10-CAL-4,49-3.4,29.4 | Place Slurry Seal | In Calaveras County | 12/05/2019 | 1 (01/06/2014) | Details CEM-3701 Report |
| 208832 | Project ID: 208832 DEA: 120K06A4 | 12-ORA-55-.4 | Install fiber optic cable, CCTV & Equip | In Orange County in Costa Mesa From Route 55 to 0.4 mile north of Euclid street undercrossing. | 08/22/2013 | NOT VERIFIED | Details CEM-3701 Report |
| 208831 | Project ID: 208831 DEA: 120L6904 EFIS: 1200020189 MINOR: 12A1475 | 12-ORA-1-28.4 | UPGRADE TRAFFIC SIGNALS AND RELATED ELECTRICAL COMPONENTS, REFRESH PAVEMENT DELINEATION, AND INSTALL METAL BEAM GUARD RAIL | ON ROUTE 1 AT BOLSA CHICA STATE ROAD | 09/30/2014 | 1 (07/02/2013) | Details CEM-3701 Report |
| 208830 | Project ID: 208830 DEA: 041A6734 EFIS: 0413000348 | 04-ALA-580-46.0/46.8 | Bridge Deck Rehabilitation | In Oakland at the Distribution Structure | 08/20/2018 | 1 (04/26/2013) | Details CEM-3701 Report |
| 208829 | Project ID: 208829 DEA: 112T1734 EFIS: 1100020363 | 11-SD-5-00.2/29.1 | Part of the Mid-Coast Corridor Transit Project, a CMGC. Viaduct for light rail over I-5 at Nobel Drive. | I-5 at Nobel Drive | 2 (08/31/2017) | Details CEM-3701 Report | |
| 208828 | Project ID: 208828 DEA: 120N1904 EFIS: 1213000158 | 12-ORA-405-3.87/3.9 | Rebuild onramp slope embankment, place concrete slope paving repair AC dike and MBGR | In the City of Irvine , on State Route 405 | 09/09/2016 | NOT VERIFIED | Details CEM-3701 Report |
| 208827 | Project ID: 208827 DEA: 060L0304 EFIS: 0600020131 COOP: 061554 | 06-FRE-99-30.0/30.8 | Herndon Avenue Interchange Improvements | On State Route 99 in Fresno | 08/19/2021 | 2 (10/07/2013) | Details CEM-3701 Report |
| 208826 | Project ID: 208826 DEA: 060G8504 EFIS: 0600020167 COOP: 061535 Permit Numbers: 0613NMC0437 | 06-KER-58-52.7/55.5 | Enter upon the State Highway Right-of-way on State Route 58 (SR-58) in Bakersfield near the SR-58/SR-99 Separation at SR-58/Hughes Lane Overcrossing (PM R52.7) to set up, maintain, and remove temporary traffic control necessary in order to construct the C | SR58, Bakersfield | 08/27/2018 | 2 (07/24/2013) | Details CEM-3701 Report |
| 208825 | Project ID: 208825 EFIS: 1012000208 MINOR: 10A1536 | 10-STA-99-R15.4/R16.8 | INSTALL CHAIN LINK RAILING | ON ROUTE 99 IN STANISLAUS COUNTY IN MODESTO FROM SIERRA DRIVE OVERCROSSING TO KANSAS AVENUE OVERCROSSING | 12/05/2019 | 1 (01/06/2014) | Details CEM-3701 Report |
