Projects

To search for a project, enter filter criteria in the appropriate input field below. If a project is not listed, please contact a METS Representative for assistance.
Displaying 11441-11450 of 18774 results.
Project IDProject IdentifiersDIST-CO-RTE-PMWork DescriptionLocation DescriptionCaltrans Closeout DateMETS Service LevelActions
     
7479Project ID: 7479
DEA: 051C5804
EFIS: 0512000178
05---  08/27/2019NOT VERIFIEDDetails CEM-3701 Report
7478Project ID: 7478
DEA: 04246584
04-CC-4-State route 4 bypass in cities of Antioch and Brentwood from 0.5 N of lone tree way to 0.3 mile north of sand creek 08/18/20222 (12/01/2012)Details CEM-3701 Report
7477Project ID: 7477
DEA: 071W0404
EFIS: 0700020905
MINOR: 07A3180
07-LA-60-11.5/20.1Plant EstablishmentIN LOS ANGELES COUNTY AND IN THE CITY OF INDUSTRY ON ROUTE 60 FROM 0.2 MILES EAST OF THE 605/60 SEPARATION TO 0.2 MILES WEST OF NOGALES St ESTABLISH EXISTING PLANTING08/17/20212 (07/09/2021)Details CEM-3701 Report
7475Project ID: 7475
DEA: 04445604
EFIS: 0400001081
COOP: 042434
Permit Numbers: 0412NMC0872 0412NDP1643
04-SCL-280-5.1/5.2,0.0/0.8The work to be performed within STATE highway right-of-way includes the following:-Modify the existing I-880/Stevens creek blvd interchange from full clover to partial clover and diamond configuration, removing existing loop ramps and re-aligning, wideningIn San Jose on Rte 280 from west of Patton Ave to 0.1 mile east of Rte 280/880 Separation on Rte 880 from, Rte 280/880 Separation to Forest Ave Undercrossing05/07/20192 (12/11/2012)Details CEM-3701 Report
7474Project ID: 7474
DEA: 024F4904
EFIS: 0212000170
02-SIS-5-44.31Construct median crossover and demo span bridge over NB lanesNear Yreka at Walters Road Overcrossing08/17/20121 (06/06/2012)Details CEM-3701 Report
7473Project ID: 7473
EFIS: 0000001155
Permit Numbers: 0312NSN0037
03-YOL-128-9.67/9.67Construction of new traffic signal with intersection widening and removal of free-right turn at I-505 SB off-ramp. The project also includes north side pedestrian improvements at the intersection, storm drainage, water and sewer improvementsHwy 128 (Grant Ave), Winters04/27/20182 (12/05/2014)Details CEM-3701 Report
7472Project ID: 7472
DEA: 050R8404
EFIS: 0500000382
05-SBT,SBT-25,68,101,156,183-VarCONSTRUCT CURB RAMPS AND SIDEWALKS AT VARIOUS LOCATIONS.MONTEREY AND SAN BENITO COUNTIES AT VARIOUS LOCATIONS08/16/20131 (10/30/2012)Details CEM-3701 Report
7471Project ID: 7471
DEA: 050Q6304
EFIS: 0500000320
05-SLO-101-36.0/37.5CONSTRUCT MEDIAN BARRIERSAN LUIS OBISPO COUNTY NEAR SANTA MARGARITA FROM 0.8 MILE SOUTH OF TASSAJARA CREEK ROAD TO 0.4 MILE SOUTH OF ROUTE 101/58 SEPARATION01/17/20141 (10/01/2012)Details CEM-3701 Report
7470Project ID: 7470
DEA: 050Q6204
EFIS: 0500000319
05-SLO-101-7.8/12.5MEDIAN BARRIER TO BE CONSTRUCTED.SAN LUIS OBISPO COUNTY IN AND NEAR ARROYO GRANDE FROM LOS BERROS ROAD UNDERCROSSING TO BRIDGE STREET UNDERCROSSING06/21/20131 (10/01/2012)Details CEM-3701 Report
7469Project ID: 7469
DEA: 050M9704
EFIS: 0500000203
05-SCR-1-17.5/26.0RECONSTRUCT METAL BEAM GUARDRAILING.SANTA CRUZ COUNTY IN AND NEAR SANTA CRUZ AT VARIOUS LOCATIONS FROM SAN LORENZO BRIDGE TO LAGUNA ROAD08/13/20181 (10/29/2012)Details CEM-3701 Report