Projects
To search for a project, enter filter criteria in the appropriate input field below. If a project is not listed, please contact a METS Representative for assistance.Displaying 11441-11450 of 18774 results.
| Project ID | Project Identifiers | DIST-CO-RTE-PM | Work Description | Location Description | Caltrans Closeout Date | METS Service Level | Actions |
|---|---|---|---|---|---|---|---|
| 7479 | Project ID: 7479 DEA: 051C5804 EFIS: 0512000178 | 05--- | 08/27/2019 | NOT VERIFIED | Details CEM-3701 Report | ||
| 7478 | Project ID: 7478 DEA: 04246584 | 04-CC-4- | State route 4 bypass in cities of Antioch and Brentwood from 0.5 N of lone tree way to 0.3 mile north of sand creek | 08/18/2022 | 2 (12/01/2012) | Details CEM-3701 Report | |
| 7477 | Project ID: 7477 DEA: 071W0404 EFIS: 0700020905 MINOR: 07A3180 | 07-LA-60-11.5/20.1 | Plant Establishment | IN LOS ANGELES COUNTY AND IN THE CITY OF INDUSTRY ON ROUTE 60 FROM 0.2 MILES EAST OF THE 605/60 SEPARATION TO 0.2 MILES WEST OF NOGALES St ESTABLISH EXISTING PLANTING | 08/17/2021 | 2 (07/09/2021) | Details CEM-3701 Report |
| 7475 | Project ID: 7475 DEA: 04445604 EFIS: 0400001081 COOP: 042434 Permit Numbers: 0412NMC0872 0412NDP1643 | 04-SCL-280-5.1/5.2,0.0/0.8 | The work to be performed within STATE highway right-of-way includes the following:-Modify the existing I-880/Stevens creek blvd interchange from full clover to partial clover and diamond configuration, removing existing loop ramps and re-aligning, widening | In San Jose on Rte 280 from west of Patton Ave to 0.1 mile east of Rte 280/880 Separation on Rte 880 from, Rte 280/880 Separation to Forest Ave Undercrossing | 05/07/2019 | 2 (12/11/2012) | Details CEM-3701 Report |
| 7474 | Project ID: 7474 DEA: 024F4904 EFIS: 0212000170 | 02-SIS-5-44.31 | Construct median crossover and demo span bridge over NB lanes | Near Yreka at Walters Road Overcrossing | 08/17/2012 | 1 (06/06/2012) | Details CEM-3701 Report |
| 7473 | Project ID: 7473 EFIS: 0000001155 Permit Numbers: 0312NSN0037 | 03-YOL-128-9.67/9.67 | Construction of new traffic signal with intersection widening and removal of free-right turn at I-505 SB off-ramp. The project also includes north side pedestrian improvements at the intersection, storm drainage, water and sewer improvements | Hwy 128 (Grant Ave), Winters | 04/27/2018 | 2 (12/05/2014) | Details CEM-3701 Report |
| 7472 | Project ID: 7472 DEA: 050R8404 EFIS: 0500000382 | 05-SBT,SBT-25,68,101,156,183-Var | CONSTRUCT CURB RAMPS AND SIDEWALKS AT VARIOUS LOCATIONS. | MONTEREY AND SAN BENITO COUNTIES AT VARIOUS LOCATIONS | 08/16/2013 | 1 (10/30/2012) | Details CEM-3701 Report |
| 7471 | Project ID: 7471 DEA: 050Q6304 EFIS: 0500000320 | 05-SLO-101-36.0/37.5 | CONSTRUCT MEDIAN BARRIER | SAN LUIS OBISPO COUNTY NEAR SANTA MARGARITA FROM 0.8 MILE SOUTH OF TASSAJARA CREEK ROAD TO 0.4 MILE SOUTH OF ROUTE 101/58 SEPARATION | 01/17/2014 | 1 (10/01/2012) | Details CEM-3701 Report |
| 7470 | Project ID: 7470 DEA: 050Q6204 EFIS: 0500000319 | 05-SLO-101-7.8/12.5 | MEDIAN BARRIER TO BE CONSTRUCTED. | SAN LUIS OBISPO COUNTY IN AND NEAR ARROYO GRANDE FROM LOS BERROS ROAD UNDERCROSSING TO BRIDGE STREET UNDERCROSSING | 06/21/2013 | 1 (10/01/2012) | Details CEM-3701 Report |
| 7469 | Project ID: 7469 DEA: 050M9704 EFIS: 0500000203 | 05-SCR-1-17.5/26.0 | RECONSTRUCT METAL BEAM GUARDRAILING. | SANTA CRUZ COUNTY IN AND NEAR SANTA CRUZ AT VARIOUS LOCATIONS FROM SAN LORENZO BRIDGE TO LAGUNA ROAD | 08/13/2018 | 1 (10/29/2012) | Details CEM-3701 Report |
