Projects
To search for a project, enter filter criteria in the appropriate input field below. If a project is not listed, please contact a METS Representative for assistance.Displaying 11421-11430 of 18774 results.
| Project ID | Project Identifiers | DIST-CO-RTE-PM | Work Description | Location Description | Caltrans Closeout Date | METS Service Level | Actions |
|---|---|---|---|---|---|---|---|
| 7501 | Project ID: 7501 DEA: 06342564 EFIS: 0600000383 | 06-FRE-180-R62.6/66.3 | PERFORM HIGHWAY PLANTING AND INSTALL IRRIGATION SYSTEM | FRESNO COUNTY IN FRESNO FROM 0.3 MILE WEST OF CLOVIS AVENUE OVERCROSSING TO 0.8 MILE EAST OF TEMPERANCE AVENUE | 08/24/2018 | 1 (08/13/2012) | Details CEM-3701 Report |
| 7500 | Project ID: 7500 DEA: 060H9404 EFIS: 0600000150 | 06-FRE-168-R14.4/R15.0 | REALIGNMENT HORIZONTAL CURVE | FRESNO COUNTY NEAR CLOVIS, FROM 0.4 MILE WEST OF SHEPHERD AVENUE TO 0.3 MILE EAST OF SHEPHERD AVENUE | 02/04/2013 | 1 (10/10/2012) | Details CEM-3701 Report |
| 7499 | Project ID: 7499 DEA: 050R3004 EFIS: 0500000355 | 05-SLO-166-39.9/40.3 | CONSTRUCT NEW BRIDGE, REMOVE EXISTING BRIDGE AND REALIGN ROADWAY | SAN LUIS OBISPO COUNTY ABOUT 25 MILES WEST OF NEW CUYAMA FROM 1.6 MILES EAST OF CUYAMA RIVER BRIDGE TO 4.0 MILES WEST OF CARRIZO CREEK BRIDGE | 08/04/2015 | 1 (11/15/2012) | Details CEM-3701 Report |
| 7498 | Project ID: 7498 DEA: 042908V4 EFIS: 0412000405 COOP: 042440A3 | 04-ALA-580-R7.8/19.1 | WIDEN FREEWAY, BRIDGES, AND HMA SURFACING. | ALAMEDA COUNTY IN LIVERMORE, DUBLIN AND PLEASANTON FROM 0.2 MILE EAST OF GREENVILLE ROAD OVERHEAD TO 0.3 MILE WEST OF HACIENDA DRIVE OVERCROSSING | 09/28/2016 | 1 (10/08/2012) | Details CEM-3701 Report |
| 7497 | Project ID: 7497 DEA: 042908E4 EFIS: 0400021249 COOP: 042396A3 | 04-ALA-580-14.6/21.6 | ROADWAY WIDENING AND REHABILITATION | ALAMEDA COUNTY IN LIVERMORE, PLEASANTON, AND DUBLIN FROM 0.3 MILE EAST OF AIRWAY BOULEVARD OVERCROSSING TO 0.2 MILE WEST OF SAN RAMON/FOOTHILL ROAD OVERCROSSING | 09/28/2016 | 1 (10/08/2012) | Details CEM-3701 Report |
| 7496 | Project ID: 7496 DEA: 032F7004 | 03-YOL-80-2.5/2.9 | RECONSTRUCT EMBANKMENT & SIDEWALK, ELECTR REPAIR, & EROSION CONTROL | YOLO COUNTY IN DAVIS FROM 0.2 MILES WEST TO 0.2 MILES EAST OF MACE BOULEVARD OVERCROSSING | 10/08/2014 | 1 (07/30/2012) | Details CEM-3701 Report |
| 7495 | Project ID: 7495 DEA: 02374304 EFIS: 0200000280 | 02-TRI-299-23.3 | WIDEN CONCRETE BRIDGE, UPGRADE BRIDGE RAIL | TRINITY COUNTY NEAR DEL LOMA AT BIG FRENCH CREEK BRIDGE | 11/17/2014 | 1 (08/13/2012) | Details CEM-3701 Report |
| 7494 | Project ID: 7494 DEA: 044G3604 EFIS: 0412000438 | 04-MRN-101-5.8/6.0 | Reconstruct pavement with permeable blanket and subdrains | In Mill Valley from 0.2 mile north of 0.3 mile north of Rte 131 | 06/21/2013 | 1 (06/25/2012) | Details CEM-3701 Report |
| 7493 | Project ID: 7493 DEA: 03371504 EFIS: 0300000426 COOP: 030375 Permit Numbers: 0312NMC0111 | 03-SAC--34.7/25.9 | Construct a new interchange, including an eight lane wide overcrossing | At the location of Elverta Road and Highway 99 | 03/09/2020 | 1 (12/13/2012) | Details CEM-3701 Report |
| 7492 | Project ID: 7492 DEA: 06325504 EFIS: 0600000367 | 06-KIN-198-R8.9/R10.1 | CONSTRUCT INTERCHANGE | KINGS COUNTY IN AND NEAR LEMOORE FROM 0.5 MILE WEST TO 0.7 MILE EAST OF 19TH AVENUE | 07/30/2018 | 1 (10/08/2012) | Details CEM-3701 Report |
