Projects

To search for a project, enter filter criteria in the appropriate input field below. If a project is not listed, please contact a METS Representative for assistance.
Displaying 11401-11410 of 18774 results.
Project IDProject IdentifiersDIST-CO-RTE-PMWork DescriptionLocation DescriptionCaltrans Closeout DateMETS Service LevelActions
     
995254Project ID: 995254
DEA: 040P9204
EFIS: 0418000026
04-ALA-680-6.4/6.6HMA AND RHMA SURFACING, DECK REPAIR, POLYESTER OVERLAY AND JOIN SEALSALAMEDA COUNTY IN FREMONT FROM 0.1 MILE SOUTH OF MISSION SAN JOSE 680/238 SEPARATION TO 0.3 MILE NORTH OF MISSION SAN JOSE 680/238 SEPARATION 1 (10/17/2023)Details CEM-3701 Report
212563Project ID: 212563
DEA: 041SS434
04-ALA-880-2.4INSTALL PRESSURE GROUTINGALAMEDA COUNTY IN FREMONT AT WARREN AVE10/21/20191 (09/09/2019)Details CEM-3701 Report
212265Project ID: 212265
DEA: 043J4804
EFIS: 0415000154
04-ALA-262-R0.7HM 1 - COLD PLACE AC PAVEMENT AND PLACE RHMA (GAP GRADED).ALAMEDA COUNTY IN FREMONT AT WARM SPRINGS BOULEVARD08/07/20181 (04/20/2017)Details CEM-3701 Report
214462Project ID: 214462
DEA: 042J8104
EFIS: 0415000008
04-ALA-880-4.8/11.3PLACE LEAN CONCRETE BASE, HMA & RHMA AND ELECTRONIC TOLL SYSTEM.ALAMEDA COUNTY IN FREMONT AT VARIOUS LOCATION FROM 0.1 MILE NORTH OF AUTO MALL PARKWAY OVERCROSSING TO 0.1 MILE SOUTH OF FREMONT BOULEVARD OVERCROSSING.01/21/20211 (10/21/2019)Details CEM-3701 Report
994323Project ID: 994323
DEA: 040Q6804
EFIS: 0418000132
04-ALA-680-M2.1REPLACE EMBANKMENT SLOPE WITH ROCK SLOPE PROTECTION.ALAMEDA COUNTY IN FREMONT AT MISSION BOULEVARD (680/262) SEPARATION10/09/20241 (10/14/2022)Details CEM-3701 Report
1738Project ID: 1738
DEA: 040G9604
04-ALA-238-5.2INSTALL TRAFFIC SIGNAL AND CONSTRUCT BUS CONCRETE PADSALAMEDA COUNTY IN FREMONT AT GURDWAR ROAD05/03/20121 (06/24/2011)Details CEM-3701 Report
213595Project ID: 213595
DEA: 044G8804
EFIS: 0413000058
04-ALA-880-10.7SEISMIC RETROFIT , REPLACE APPROACH SLABS AND EROSION CONTROLALAMEDA COUNTY IN FREMONT AT CRANDALL CREEK BRIDGE.05/08/20201 (01/28/2019)Details CEM-3701 Report
2336Project ID: 2336
DEA: 04447904
04-ALA-238-0.0/3.3,3.5/7.8ROADWAY TO BE REHABILITATED AND SIGNAL AND LIGHTING TO BE INSTALLED.ALAMEDA COUNTY IN FREMONT AND UNION CITY FROM NORTH OF ROUTE 238/680 SEPARATION TO SOUTH JUNCTION ROUTE 84 AND FROM ALAMEDA CREEK BRIDGE TO BLANCHE STREET03/05/20121 (03/22/2012)Details CEM-3701 Report
994226Project ID: 994226
DEA: 042K7004
EFIS: 0417000010
COOP: 042895
04-ALA-880-R0.0/11.8Cold plane pavement and overlay with RHMA-G/RHMA-O (CAPITAL PREVENTIVE MAINTENANCE)ALAMEDA COUNTY IN FREMONT AND NEWARK FROM SANTA CLARA COUNTY LINE TO 0.4 MILE NORTH OF FREMONT BOULEVARD OVERCROSSING 1 (09/13/2022)Details CEM-3701 Report
214930Project ID: 214930
DEA: 043Q4304
EFIS: 0419000211
04-ALA-84-R0.7/R6.0COLD PLANE AC PAVEMENT AND PLACE RHMA-G.ALAMEDA COUNTY IN FREMONT AND NEWARK FROM DUMBARTON BRIDGE TO DECOTO ROAD SEPARATION11/18/20201 (07/07/2020)Details CEM-3701 Report