Projects
To search for a project, enter filter criteria in the appropriate input field below. If a project is not listed, please contact a METS Representative for assistance.Displaying 11401-11410 of 18774 results.
| Project ID | Project Identifiers | DIST-CO-RTE-PM | Work Description | Location Description | Caltrans Closeout Date | METS Service Level | Actions |
|---|---|---|---|---|---|---|---|
| 995254 | Project ID: 995254 DEA: 040P9204 EFIS: 0418000026 | 04-ALA-680-6.4/6.6 | HMA AND RHMA SURFACING, DECK REPAIR, POLYESTER OVERLAY AND JOIN SEALS | ALAMEDA COUNTY IN FREMONT FROM 0.1 MILE SOUTH OF MISSION SAN JOSE 680/238 SEPARATION TO 0.3 MILE NORTH OF MISSION SAN JOSE 680/238 SEPARATION | 1 (10/17/2023) | Details CEM-3701 Report | |
| 212563 | Project ID: 212563 DEA: 041SS434 | 04-ALA-880-2.4 | INSTALL PRESSURE GROUTING | ALAMEDA COUNTY IN FREMONT AT WARREN AVE | 10/21/2019 | 1 (09/09/2019) | Details CEM-3701 Report |
| 212265 | Project ID: 212265 DEA: 043J4804 EFIS: 0415000154 | 04-ALA-262-R0.7 | HM 1 - COLD PLACE AC PAVEMENT AND PLACE RHMA (GAP GRADED). | ALAMEDA COUNTY IN FREMONT AT WARM SPRINGS BOULEVARD | 08/07/2018 | 1 (04/20/2017) | Details CEM-3701 Report |
| 214462 | Project ID: 214462 DEA: 042J8104 EFIS: 0415000008 | 04-ALA-880-4.8/11.3 | PLACE LEAN CONCRETE BASE, HMA & RHMA AND ELECTRONIC TOLL SYSTEM. | ALAMEDA COUNTY IN FREMONT AT VARIOUS LOCATION FROM 0.1 MILE NORTH OF AUTO MALL PARKWAY OVERCROSSING TO 0.1 MILE SOUTH OF FREMONT BOULEVARD OVERCROSSING. | 01/21/2021 | 1 (10/21/2019) | Details CEM-3701 Report |
| 994323 | Project ID: 994323 DEA: 040Q6804 EFIS: 0418000132 | 04-ALA-680-M2.1 | REPLACE EMBANKMENT SLOPE WITH ROCK SLOPE PROTECTION. | ALAMEDA COUNTY IN FREMONT AT MISSION BOULEVARD (680/262) SEPARATION | 10/09/2024 | 1 (10/14/2022) | Details CEM-3701 Report |
| 1738 | Project ID: 1738 DEA: 040G9604 | 04-ALA-238-5.2 | INSTALL TRAFFIC SIGNAL AND CONSTRUCT BUS CONCRETE PADS | ALAMEDA COUNTY IN FREMONT AT GURDWAR ROAD | 05/03/2012 | 1 (06/24/2011) | Details CEM-3701 Report |
| 213595 | Project ID: 213595 DEA: 044G8804 EFIS: 0413000058 | 04-ALA-880-10.7 | SEISMIC RETROFIT , REPLACE APPROACH SLABS AND EROSION CONTROL | ALAMEDA COUNTY IN FREMONT AT CRANDALL CREEK BRIDGE. | 05/08/2020 | 1 (01/28/2019) | Details CEM-3701 Report |
| 2336 | Project ID: 2336 DEA: 04447904 | 04-ALA-238-0.0/3.3,3.5/7.8 | ROADWAY TO BE REHABILITATED AND SIGNAL AND LIGHTING TO BE INSTALLED. | ALAMEDA COUNTY IN FREMONT AND UNION CITY FROM NORTH OF ROUTE 238/680 SEPARATION TO SOUTH JUNCTION ROUTE 84 AND FROM ALAMEDA CREEK BRIDGE TO BLANCHE STREET | 03/05/2012 | 1 (03/22/2012) | Details CEM-3701 Report |
| 994226 | Project ID: 994226 DEA: 042K7004 EFIS: 0417000010 COOP: 042895 | 04-ALA-880-R0.0/11.8 | Cold plane pavement and overlay with RHMA-G/RHMA-O (CAPITAL PREVENTIVE MAINTENANCE) | ALAMEDA COUNTY IN FREMONT AND NEWARK FROM SANTA CLARA COUNTY LINE TO 0.4 MILE NORTH OF FREMONT BOULEVARD OVERCROSSING | 1 (09/13/2022) | Details CEM-3701 Report | |
| 214930 | Project ID: 214930 DEA: 043Q4304 EFIS: 0419000211 | 04-ALA-84-R0.7/R6.0 | COLD PLANE AC PAVEMENT AND PLACE RHMA-G. | ALAMEDA COUNTY IN FREMONT AND NEWARK FROM DUMBARTON BRIDGE TO DECOTO ROAD SEPARATION | 11/18/2020 | 1 (07/07/2020) | Details CEM-3701 Report |
