Projects
To search for a project, enter filter criteria in the appropriate input field below. If a project is not listed, please contact a METS Representative for assistance.Displaying 11371-11380 of 18774 results.
| Project ID | Project Identifiers | DIST-CO-RTE-PM | Work Description | Location Description | Caltrans Closeout Date | METS Service Level | Actions |
|---|---|---|---|---|---|---|---|
| 7559 | Project ID: 7559 DEA: 07224604 EFIS: 0700000360 | 07-LA-405-46.3/47.8 | Please Contact SMR (Bahjat Dagher) prior to performing QA Source Inspection for this projet. Thanks, BD | Please Contact SMR (Bahjat Dagher) prior to performing QA Source Inspection for this project. Thanks, BD | 09/18/2014 | 1 (05/01/2012) | Details CEM-3701 Report |
| 7558 | Project ID: 7558 EFIS: 0000001155 Permit Numbers: 0612NDP0384 | 06-KER-99-54.48/54.48 | Enter upon the State Highway Right-of-way on State Route 99 (SR-99) in Kern County in Delano at and near the Woollomes Avenue Overcrossing Interchange (PM 54.48) to set up, maintain, and remove temporary traffic control necessary in order to construct the | Woollomes Ave. Interchange, Delano | 07/30/2018 | 2 (12/29/2014) | Details CEM-3701 Report |
| 7557 | Project ID: 7557 EFIS: 0000001155 Permit Numbers: 0712NSN0813 | 07-LA-10-4.503/4.503 | Install conduits,pullboxes and general traffic signal equipment Install advanced loops Removal and Installation of striping | Centinela Avenue, Los Angeles | 08/01/2018 | 1 (01/25/2013) | Details CEM-3701 Report |
| 7556 | Project ID: 7556 EFIS: 0000001155 Permit Numbers: 0712NSN0812 | 07-LA-2-3.351/3.351 | Install conduits,pullboxes & general traffic signal equipment Install stub-out & Advance Loops on Santa Monica Blvd Install new APS devices Replace all existing 8\\"³vehicle heads to 12\\"³ vehicle heads per LADOT design stdsInstall 17-3-100 standards with | Butler Avenue, Los Angeles | 07/31/2018 | 1 (12/12/2012) | Details CEM-3701 Report |
| 7555 | Project ID: 7555 EFIS: 0000001155 Permit Numbers: 0712NSN0811 | 07-LA-2-3.481/3.481 | Install conduits,pullboxes and traffic signal equipment Install stub out and Advance Loops on Santa Monica Blvd Install stub out and Actuation Loops on Corinth Ave Install new APS devices Replacing all existing 8"³ vehicle heads to 12 "³vehicle heads per LADOT | Corinth Avenue, Los Angeles | 07/31/2018 | 1 (12/12/2012) | Details CEM-3701 Report |
| 7554 | Project ID: 7554 EFIS: 0000001155 Permit Numbers: 0712NSN0810 | 07-LA-2-3.211/3.211 | Install conduits, pull boxes and general traffic signal equipment Install 17-3-100 standard with 20 feet mast arm for EB Santa Monica Blvd. Install advanced detector loops | Federal Avenue, Los Angeles | 07/31/2018 | NOT VERIFIED | Details CEM-3701 Report |
| 7553 | Project ID: 7553 EFIS: 0000001155 Permit Numbers: 0712NSN0809 | 07-LA-2-2.871/2.871 | Install conduits, pull boxes and general traffic signal equipment Install 17-3-100 standards with 20 feet mast arms Install advanced detector loops Install actuation detector loops upgrade traffic signal indicators to 12 inches | Santa Monica Blvd., Los Angeles | 07/31/2018 | 1 (01/25/2013) | Details CEM-3701 Report |
| 7552 | Project ID: 7552 EFIS: 0000001155 Permit Numbers: 0712NSN0808 | 07-LA-2-2.6/2.6 | Install conduits, pull boxes, traffic signal equipment Install C-1-100 Camera Pole Replace existing standard with 15 mast arm on southeast corner with Type 17-3-100 & 20\' mast arm per LADOT design standards. | Bundy Drive / Ohio Avenue, Los Angeles | 07/31/2018 | NOT VERIFIED | Details CEM-3701 Report |
| 7551 | Project ID: 7551 DEA: 07233104 EFIS: 0700000389 | 07-LA-605-R11.4/R13.9 | Please Contact SMR (Farzad Tasbihgoo) prior to performing QA Source Inspection for this projet. Thanks, FT | Please Contact SMR (Farzad Tasbihgoo) prior to performing QA Source Inspection for this project. Thanks, FT | 02/14/2014 | 1 (05/01/2012) | Details CEM-3701 Report |
| 7549 | Project ID: 7549 DEA: 100E0705 EFIS: 1000000021 MINOR: 10A1409 | 10-SJ-88-13.8 | IMPROVE TRUCK TURN RADIUS | ON STATE ROUTE 88 IN SAN JOAQUIN COUNTY IN LOCKEFORD AT LOCKE ROAD. | 12/05/2019 | 1 (01/06/2014) | Details CEM-3701 Report |
