Projects
To search for a project, enter filter criteria in the appropriate input field below. If a project is not listed, please contact a METS Representative for assistance.Displaying 11331-11340 of 18863 results.
| Project ID | Project Identifiers | DIST-CO-RTE-PM | Work Description | Location Description | Caltrans Closeout Date | METS Service Level | Actions |
|---|---|---|---|---|---|---|---|
| 7763 | Project ID: 7763 DEA: 080H1304 EFIS: 0800000237 Permit Numbers: 0812NMC0775 | 08-SBD--10.3/11.4 | Enter onto Interstate 15 (I-15) right-of-way at Duncan Canyon Road in the City of Fontana to construct new I-15/Duncan Canyon Road interchange including street improvement, bridge widening, retaining walls, grading, paving, utility installation, drainage | ALONG INTERSTATE 15 FROM 0.5 MI NORTH 0.7 MI SOUTH OF DUNCAN CANYON ROAD | 08/17/2021 | 2 (05/22/2013) | Details CEM-3701 Report |
| 7535 | Project ID: 7535 DEA: 044G5204 EFIS: 0412000489 | 04-SOL-I-80- | Director's Order Project - Slab Replacement with RSC | Along I-80 between Vacaville and Dixon | 01/17/2014 | 1 (07/02/2012) | Details CEM-3701 Report |
| 209779 | Project ID: 209779 DEA: 040G1904 EFIS: 0400000315 COOP: 042243A2 | 04-ALA-580-R7.8/19.1 | Convert HOV to HOT ( High Occupancy Toll lane or lanes | Along EB I-580 from east of the Greenville Overhead in Livermore to west of Hacienda Drive in Pleasanton | 01/09/2025 | 2 (09/09/2019) | Details CEM-3701 Report |
| 213594 | Project ID: 213594 DEA: 044G1134 EFIS: 0414000305 | 04-ALA-680-m0.0/r21.9 | RAMP METERING, AND RAMP METERING | ALMEDA COUNTY FROM 0.3 MILE SOUTH OF SCOTT CREEK ROAD UNDERCROSSING TO 0.3 MILE NORTH OF ALCOSTA BLVD OVERCROSSING | 01/21/2021 | 1 (12/13/2018) | Details CEM-3701 Report |
| 209832 | Project ID: 209832 Permit Numbers: 04116MC1661 | 04-SCL-85-5.9/5.9 | The Modification of the northeast corner of the Hwy NB 85 offramp AT Almaden Expressway and associated work consists of asphalt paving,curb and gutter,sidewalk,signal modifications, joint trench and a new riser pole and guy. | Almaden Expressway, San Jose | 09/14/2018 | 1 (10/06/2014) | Details CEM-3701 Report |
| 209833 | Project ID: 209833 Permit Numbers: 0412NMC1622 | 04-SCL-85-5.9/5.9 | The modification of the northest corner of the NB HWY 85 offramp at Almaden Expressway and adding a fourth lane transitions. | Almaden Expressway, San Jose | 08/21/2018 | 1 (10/06/2014) | Details CEM-3701 Report |
| 775 | Project ID: 775 EFIS: 0000001155 Permit Numbers: 0308NMC0597 | 03-NEV-89-0.82/1.4 | Roundabout | Alder Drive, Truckee | 09/17/2014 | NOT VERIFIED | Details CEM-3701 Report |
| 993813 | Project ID: 993813 DEA: 01401104 EFIS: 0100000154 | 01-MEN-1-43.3/44.2 | Replace or rehabilitate the Albion River Bridge with a structure that will ensure the safety and reliability on State Route 1. | Albion River Bridge | 1 (05/16/2022) | Details CEM-3701 Report | |
| 1000466 | Project ID: 1000466 DEA: 042Q7404 EFIS: 0419000044 | 04-ALA,SCL,SM,SF-80,92,101,237,880,880S,980-Var | INSTALL FIBER OPTIC CABLE SYSTEMS AND MODIFY ELECTRICAL SYSTEMS. | ALAMEDA, SANTA CLARA, SAN MATEO, AND SAN FRANCISCO COUNTIES AT VARIOUS LOCATIONS | 1 (07/02/2025) | Details CEM-3701 Report | |
| 7343 | Project ID: 7343 DEA: 042E7704 EFIS: 0400021134 | 04-ALA,SF,SM,SCL,SOL,SON-17,24,37,80,87,etc-Var | UPGRADE XENON CMS TO LED MODULES. | ALAMEDA, SAN MATEO, SANTA CLARA, SOLANO, SONOMA COUNTIES AND CITY AND COUNTY OF SAN FRANCISCO AT VARIOUS LOCATIONS | 08/16/2013 | 1 (08/21/2012) | Details CEM-3701 Report |
