Projects
To search for a project, enter filter criteria in the appropriate input field below. If a project is not listed, please contact a METS Representative for assistance.Displaying 11331-11340 of 18774 results.
| Project ID | Project Identifiers | DIST-CO-RTE-PM | Work Description | Location Description | Caltrans Closeout Date | METS Service Level | Actions |
|---|---|---|---|---|---|---|---|
| 215604 | Project ID: 215604 DEA: 032G1704 EFIS: 0320000236 | 03-YOL-113-R10.2/R11.1 | Slab Replacement | In Yolo County on route 113 In Woodland From East Woodland Overhead To 0.4 Mile West of Route 113/5 Separation | 11/30/2021 | 1 (07/06/2021) | Details CEM-3701 Report |
| 212403 | Project ID: 212403 DEA: 033H1504 EFIS: 0317000236 | 03-YOL-16-1.5-1.7, 1.5/1.7 | Install 670 feet of soldier pile wall | In Yolo County on Route 16 approx. 1.2 miles west of the Colusa/Yolo County line. | 06/27/2022 | 1 (07/31/2017) | Details CEM-3701 Report |
| 1202 | Project ID: 1202 DEA: 033M3204 | 03-YUB-65,70-VAR | Place Methacrylate And Polyester Overlay On Bridge Decks | In Yuba County at various locations | 12/17/2012 | 1 (12/21/2009) | Details CEM-3701 Report |
| 1249 | Project ID: 1249 DEA: 03401804 | 03-YUB-65-65 | IMPROVE TRAFFIC OPERATIONS | IN YUBA COUNTY IN WHEATLAND FROMMAIN STREET TO HOOPER STREET | 03/22/2011 | 1 (03/22/2011) | Details CEM-3701 Report |
| 1130 | Project ID: 1130 DEA: 033E2004 | 03-YUB-49-5.9 | SLOPE REPAIR | IN YUBA COUNTY NEAR CAMPTONVILLE AT 0.3 MILE NORTH OF CAMPTONVILLE ROAD | 03/22/2011 | 1 (03/22/2011) | Details CEM-3701 Report |
| 799 | Project ID: 799 DEA: 030A29U4 | 03-YUB-5715- | REMODEL MAINTENANCE STATIONS | IN YUBA COUNTY NEAR LINDA ATVARIOUS LOCATIONS | 10/20/2010 | NOT VERIFIED | Details CEM-3701 Report |
| 212203 | Project ID: 212203 DEA: 032H9504 EFIS: 0317000210 | 03-YUB-49-6.11/6.73, 6.11,6.73 | Construct Solider Pile Wall | In Yuba County on Rte 49 approximately 1.35 miles north of Camptonville Road | 08/06/2019 | 1 (09/18/2017) | Details CEM-3701 Report |
| 759 | Project ID: 759 Permit Numbers: 03076MC0719 | 03-PLA-49-5.86/6.38 | Highway Widening | In-between Atwood and Bell Road, Auburn | 09/17/2014 | NOT VERIFIED | Details CEM-3701 Report |
| 210695 | Project ID: 210695 DEA: 080K2924 EFIS: 0812000099 | 08-SBD-10-32.9/R37.4 | REPLACE EXISTING (PCCP) WITH (RSCP). | IN/NEAR REDLANDS FROM 0.2 MILE W/O FORD STREET TO 0.4 MILE E/O LIVEOAK CANYON ROAD. | 08/08/2018 | 1 (10/19/2015) | Details CEM-3701 Report |
| 5278 | Project ID: 5278 DEA: 08455704 EFIS: 0800000725 Permit Numbers: 0810NMC0329 | 08-RIV-10-R52.5/R54.2 | Interchange Improvement Project | Indian Canyon Drive | 07/31/2018 | NOT VERIFIED | Details CEM-3701 Report |
