Projects
To search for a project, enter filter criteria in the appropriate input field below. If a project is not listed, please contact a METS Representative for assistance.Displaying 11321-11330 of 18774 results.
| Project ID | Project Identifiers | DIST-CO-RTE-PM | Work Description | Location Description | Caltrans Closeout Date | METS Service Level | Actions |
|---|---|---|---|---|---|---|---|
| 7617 | Project ID: 7617 EFIS: 0700021205 | 07-LA-101- | 1 (02/06/2013) | Details CEM-3701 Report | |||
| 7614 | Project ID: 7614 EFIS: 0000001155 Permit Numbers: 0412NRD1251 | 04-MRN-1-0.65-0.9 | 01/21/2019 | NOT VERIFIED | Details CEM-3701 Report | ||
| 7613 | Project ID: 7613 DEA: 071218W4 EFIS: 0700021119 | 07-LA-5-29.4/31.6 | REALIGN ROUTE 5 AND RAILROAD TRACKS AND RECONFIGURE ON- AND OFF-RAMPS. | LOS ANGELES COUNTY IN BURBANK FROM WEST MAGNOLIA BOULEVARD OVERCROSSING TO 0.3 MILE NORTH OF BUENA VISTA STREET/WINONA AVENUE UNDERCROSSING | 07/31/2023 | 1 (10/08/2012) | Details CEM-3701 Report |
| 7612 | Project ID: 7612 DEA: 060N8504 EFIS: 0600020699 | 06-TUL-99-23.5 | REPAIR BRIDGE. | TULARE COUNTY IN TULARE AT AVENUE 184 OVERCROSSING | 10/25/2013 | 1 (11/19/2012) | Details CEM-3701 Report |
| 7611 | Project ID: 7611 DEA: 060K5404 EFIS: 0600000249 | 06-TUL-63-2.9/3.2 | WIDEN INTERSECTION AND INSTALL SIGNAL. | TULARE COUNTY NEAR VISALIA FROM 0.1 MILE SOUTH TO 0.2 MILE NORTH OF AVENUE 256 | 10/01/2014 | 1 (09/17/2012) | Details CEM-3701 Report |
| 7610 | Project ID: 7610 DEA: 060G8304 EFIS: 0600020165 | 06-KER-99-17.0/22.1 | WIDEN FREEWAY FROM 6 LANES TO 8 LANES WITH PCC AND HMA | KERN COUNTY IN BAKERSFIELD FROM 0.5 MILE SOUTH OF ROUTE 119 TO WILSON ROAD | 01/23/2015 | 1 (10/15/2012) | Details CEM-3701 Report |
| 7609 | Project ID: 7609 DEA: 020E4504 EFIS: 0200020065 | 02-TEH-5-R5.6/42.1 | PLACE MULCH AND CONSTRUCT MAINTENANCE PULLOUTS | TEHAMA COUNTY AT VARIOUS LOCATIONS FROM 0.2 MILE SOUTH OF LIBERAL AVENUE OVERCROSSING TO 0.1 MILE NORTH OF BOWMAN ROAD OVERCROSSING | 01/02/2015 | 1 (09/10/2012) | Details CEM-3701 Report |
| 7608 | Project ID: 7608 DEA: 044G2804 COOP: 42078A1 | 04-ALA-80- | PLEASE SEE EA 04-4G2904 FOR PROJECT INFO-----------SFOBB Toll Canopy Renovations | PLEASE SEE EA 04-4G2904 FOR PROJECT INFO-------------SFOBB Toll Crossing | 09/17/2012 | 1 (10/10/2012) | Details CEM-3701 Report |
| 7607 | Project ID: 7607 DEA: 100V3704 EFIS: 1000020035 MINOR: 10A1438 | 10-CAL-4,108,120-VAR | INSTALL RADIO COMMUNICATION ON ROUTE 4, 108, 120 | IN CALAVERAS AND TUOLUMNE COUNTIES AT VARIOUS LOCATIONS | 12/05/2019 | 1 (01/06/2014) | Details CEM-3701 Report |
| 7606 | Project ID: 7606 DEA: 08448114 EFIS: 0800020451 | 08-SBD-10-25.3/26.3 | I-10/Tippecanoe Interchange Improvements-Phase 1. | In the cities of Loma Linda and San Bernardino, from 1 mile west of Tippecanoe Avenue to Tippecanoe Avenue. Construct eastbound auxiliary lane, eastbound off ramp, retaining walls, reinforced concrete box culvert, and widen San Timoteo Bridge. | 08/25/2021 | 2 (02/14/2013) | Details CEM-3701 Report |
