Projects

To search for a project, enter filter criteria in the appropriate input field below. If a project is not listed, please contact a METS Representative for assistance.
Displaying 11311-11320 of 18863 results.
Project IDProject IdentifiersDIST-CO-RTE-PMWork DescriptionLocation DescriptionCaltrans Closeout DateMETS Service LevelActions
     
994523Project ID: 994523
DEA: 041K3004
EFIS: 0416000226
COOP: 042856
04-SCL-280-7.1/9.5Improve Traffic Operations, Wolfe RoadSCL 280/Wolfe Rd. Interchange 1 (07/17/2025)Details CEM-3701 Report
214962Project ID: 214962
DEA: 044G6804
EFIS: 0413000086
Permit Numbers: 04206DP0812 0420NOP0653
04-SCL-280,85-11.2/11.5Improve traffic operations by widening existing off-ramp from one land to two lanes; remove curb-and-gutter; remove and replace existing OH sign and street lighting, install concrete barrier, retaining wall, pavement overlay, and new signing and strpingI-280 between I-280/Foothill Expressway NB off-ramp and SR-85 branch connector 1 (05/12/2020)Details CEM-3701 Report
1249Project ID: 1249
DEA: 03401804
03-YUB-65-65IMPROVE TRAFFIC OPERATIONSIN YUBA COUNTY IN WHEATLAND FROMMAIN STREET TO HOOPER STREET03/22/20111 (03/22/2011)Details CEM-3701 Report
5529Project ID: 5529
Permit Numbers: 1008NMC0389
10-STA-219-2.2/4.2Improve the intersection of Dale Road/SR 219 intersection 08/24/20182 (08/07/2014)Details CEM-3701 Report
212357Project ID: 212357
DEA: 044K0904
EFIS: 0417000164
Permit Numbers: 0417NOP0443 04176DP0541 0417NRD0562 0415NMC2719
04-SM-84-25.8/26.5Improve the intersection of Bayfront Expressway at Chrysler Drive by widening to accommodate additional left turn-lanes and bike lanes; and install signing, striping, curb ramps, and sidewalk per approved Project 0417000256 (EA No. 4K0904), on State Highway 04-SM-84, Post Miles 25.8/26.5, in the CiBayfront Expressway, Menlo Park08/22/20181 (05/05/2017)Details CEM-3701 Report
6475Project ID: 6475
EFIS: 0000001155
Permit Numbers: 1209NMC0357
12-ORA-90-5.625/5.8125improve the intersection capacity at the Associated Road intersection as part of the Imperial Highway (SR-90) Smart Street Project (Segment D).Improvements within the State right of way will include but not limited to: drainage and traffic signal modificationimperial highway, Brea09/08/2016NOT VERIFIEDDetails CEM-3701 Report
6474Project ID: 6474
DEA: 120164M4
EFIS: 1200000017
COOP: 120531
Permit Numbers: 1209NMC0354
12-ORA-90-.4/2.7Improve the intersection capacities at the Beach Blvd. (SR-39), Idaho Street, Euclid Street, and Harbor Blvd. intersections as part of the Imperial Highway (SR-90) Smart Street Project - from L.A./ Orange County line to east of Harbor Blvd, (Segment A) 07/31/2018NOT VERIFIEDDetails CEM-3701 Report
2399Project ID: 2399
DEA: 044M5404
EFIS: 0400001193
MINOR: 04A2416
04-SCL-9-10.9IMPROVE STREAM CHANNEL AND RESTORE SLOPE PROTECTION 03/18/20252 (08/22/2019)Details CEM-3701 Report
209173Project ID: 209173
Permit Numbers: 10126MC0697 10136DP0644
10-MER-152-18.8/19Improve State Route 152/165 and State Route 152/Badger Flat Road Intersection in the City of Los Banos in Merced County. Work includes highway widening, concrete curb, gutter, sidewalk, ADA curb ramps, median curb, modification of existing traffic signalsSR 152, Los Banos02/06/20151 (10/31/2013)Details CEM-3701 Report
993216Project ID: 993216
Permit Numbers: 10206MC0848 1021NRD0810 10226RT0042
10---15.078Improve State Highway 4 right of way located at the intersection of Fresno Avenue in the City of Stockton. Work includes pavement widening, new and improve pedestrian facilities, replacing existing pork chop divider, construction of new curb ramps, traffic signal modifications, drainage improvementSR 4, Stockton08/29/20221 (08/25/2021)Details CEM-3701 Report