Projects

To search for a project, enter filter criteria in the appropriate input field below. If a project is not listed, please contact a METS Representative for assistance.
Displaying 11261-11270 of 18774 results.
Project IDProject IdentifiersDIST-CO-RTE-PMWork DescriptionLocation DescriptionCaltrans Closeout DateMETS Service LevelActions
     
213483Project ID: 213483
DEA: 07303104
EFIS: 0713000498
Permit Numbers: 0716AOP1258 0717ART0155 0717ART0246 0716ADP2179 0717ART0246
07---21.5/21.5improvements including, but not limited to, widen roadway, remove median, add and upgrade signals, relocate sidewalk, utility work, and associated miscellaneous improvements DP is 716-ADP-2179150 ft south of E. Walnut Drive N., Industry06/17/20211 (07/12/2018)Details CEM-3701 Report
210703Project ID: 210703
Permit Numbers: 04156DP1438 0414NMC1139 0415NRT1459
04-SM--27.65/27.65Improvements include roadway widening to include an additional eastbound right turn lane,new sidewalk and a Class 1 Bike Path along Willow Rd between the existing railroad tracks and the existing Bay Trail located near Bayfront Expwy.Willow Road / Bayfront Exp., Menlo Park09/14/20181 (07/29/2015)Details CEM-3701 Report
1001511Project ID: 1001511
DEA: 040AA214
EFIS: 0419000452
COOP: 043069
04-CC-123-0.0/2.198Improvements include localized sidewalk repairs and associated tree treatments including tree removal/replacement/root pruning within the City of El Cerrito's right of way to be constructed together with the adjacent curbs and gutters that were damaged  1 (10/06/2025)Details CEM-3701 Report
211908Project ID: 211908
Permit Numbers: 04166DP1823 0414NMC2026 04166RW1963 0416NRW1948
04--123-4.1/4.4Improvements include constructing multi-use pathway along SB San Pablo Ave. from 150 feet south of Dartmouth street to 400 feet north of Monroe Street.San Pablo Ave, Albany01/18/20191 (01/06/2017)Details CEM-3701 Report
994340Project ID: 994340
DEA: 041Y1704
EFIS: 0422000442
04-SON-121,12-Improvements at the intersection of State Route 121/12 and 8th Street East, construction of a Class I bike path, and modification of the railroad at grade crossingsState Route 121/12 and 8th Street East 2 (05/09/2023)Details CEM-3701 Report
4648Project ID: 4648
Permit Numbers: 08066DP0196
08-RIV-15-19.11IMPROVEMENTS AT INTERCHANGE I-15 07/29/2010NOT VERIFIEDDetails CEM-3701 Report
213861Project ID: 213861
DEA: 041J9804
EFIS: 0414000405
04-SCL-280-Improvement work to the I-280 Calvert Drive on-ramp.I-280 and Calvert Drive06/08/20202 (01/11/2019)Details CEM-3701 Report
209697Project ID: 209697
DEA: 04272824
EFIS: 0400000759
COOP: 042544
04-SM-101-Improvement to the southbound off-ramp at University Avenue and 12' bridge widening to accommodate a bike/pedestrian facility on the north side of existing Highway 101 overcrossing.East Palo Alto 2 (08/24/2015)Details CEM-3701 Report
3652Project ID: 3652
EFIS: 0000001155
Permit Numbers: 07086MC1724
07-LA-14-33.42IMPROVEMENT ON CITY STREETS, STORM DRAIN, CATCH BASIN, UPGRADE SIGNAL, MODIFY MEDIAN, STRIPING AND SIGNINGRte 1408/24/2012NOT VERIFIEDDetails CEM-3701 Report
7086Project ID: 7086
EFIS: 0000001155
Permit Numbers: 0711NMC1399
07-LA-14-68.1/69.3Improvement of Avenue I interchange with Freeway 14, reconstruction/reconfiguration of S/B off-ramp, widening of 3 ramps, storm drain systemAvenue I, Lancaster07/31/2018NOT VERIFIEDDetails CEM-3701 Report